Clean Water Act discharge permit · NPDES AKR10FF07
DIRTWORKS BARWOOD AVENUE EXTRACTION PIT, Palmer, AK: NPDES AKR10FF07 discharge permit, effluent exceedances, inspections, penalties
- Administratively continuedPermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
DIRTWORKS BARWOOD AVENUE EXTRACTION PIT, held by Owen Johnson - Dirtworks, Inc., holds NPDES permit AKR10FF07. EPA’s file records it issued February 11, 2021 and expiring January 31, 2026. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for DIRTWORKS BARWOOD AVENUE EXTRACTION PIT: its NPDES ID, its permit type and status, its dates, its address in Palmer, Alaska. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES AKR10FF07.
What stands out
- Its term runs 4 years and 354 days, February 11, 2021 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | DIRTWORKS BARWOOD AVENUE EXTRACTION PIT |
|---|---|
| Permittee as filed | Owen Johnson - Dirtworks, Inc. |
| NPDES ID | AKR10FF07 |
| Permit status | Administratively continued (past its expiration date and still in force until reissued) |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | February 11, 2021 |
| Expiration date | January 31, 2026 |
| Issuing agency | Alaska Department of Environmental Conservation |
| Address | Palmer, AK 99645 |
| Subwatershed | Lower Knik River (HUC 190204021209) |
| NAICS | 237110 – Water and Sewer Line and Related Structures Construction |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES AKR10FF07.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES AKR10FF07.
Inspections
EPA’s inspection file holds no inspection for NPDES AKR10FF07.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES AKR10FF07.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, AKR10FF07.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID AKR10FF07 there.
DIRTWORKS BARWOOD AVENUE EXTRACTION PIT, Palmer, Alaska: Coverage under a general permit AKR10FF07, held by Owen Johnson - Dirtworks, Inc.; Construction stormwater; Administratively continued (past its expiration date and still in force until reissued); issued February 11, 2021, term to January 31, 2026, by Alaska Department of Environmental Conservation; Water and Sewer Line and Related Structures Construction.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 31 were issued before AKR10FF07.
Coverages issued nearest AKR10FF07
- 2020-10-23: KDK HARBOR CHANNEL BRIDGE IMPROVEMENTS_3, Kodiak: AKR10GJ33, held by State of Alaska - DOT
- 2021-02-01: OLD STEESE HWY COAL ASH MANAGEMENT AREA, Fairbanks: AKR10GE64, held by David Fish - Aurora Energy Services, LLC
- 2021-02-03: MP 39 STATION UPGRADE, Wasilla: AKR10GI21, held by Vin Robinson - ENSTAR Natural Gas Company
- 2021-02-05: CVTC TRANSPORT FIBER GLENN HWY MP 166-186, Glennallen: AKR10GJ74, held by Michels Power, Inc.
- 2021-02-10: GREENSTREET BUSINESS PARK, Wasilla: AKR10FN52, held by Darrel Greenstreet - Greenstreet Investments, LLC
- 2021-02-24: JBE047 POL FACILITY, Elmendorf Afb: AKR10GE25, held by ASRC
- 2021-02-25: UNIVERSITY AVE SEGMENT 2A DNR TO REWAK DRIVE, Fairbanks: AKR10GF23, held by Tony Johansen - Great Northwest Inc.
- 2021-02-26: RICHARDSON HWY MP 159-167 RECONSTRUCTION, Delta Junction: AKR10GF93, held by COLASKA, INC. dba QAP
- 2021-02-26: GREATLAND FOODS, Anchorage: AKR10GJ91, held by Bauer Construction, Inc.
- 2021-03-02: RICHARDSON HWY MP 159-167 RECONSTRUCTION _2, Delta Junction: AKR10GF97, held by Alaska DOT&PF Northern Region
DIRTWORKS BARWOOD AVENUE EXTRACTION PIT among its neighbors
8 discharge permits are in the Lower Knik River subwatershed (HUC 190204021209); AKR10FF07 is one. Its county: 248, 0 major; AKR10FF07 is minor permit.
Other permits in the Lower Knik River subwatershed (HUC 190204021209)
- CIAA EKLUTNA AQUACULTURE FACILITY, Palmer: AKG130033, minor, term to 2023-02-28
- COLONIAL FIELDS SOUTH, Palmer: AKR10H0J5, minor, term to 2026-01-31
- EAST SMITH ROAD EXTENSION UPGRADE AND PATHWAY, Palmer: AKR10H0LB, minor, term to 2026-01-31
- MTA KNIK RIVER FTTB, Palmer: AKR10H027, minor, term to 2026-01-31
- QUALITY SAND & GRAVEL-MORGAN, Palmer: AKR06AE24, minor, term to 2025-03-31
- SMITH ROAD EXTENSION AND PATHWAY, Palmer: AKR10H0LF, minor, term to 2026-01-31
- SMITH ROAD SUBDIVISION PHASE I, Palmer: AKR10H10N, minor, term to 2031-01-31
Nearby on the register
- Discharge permits in Palmer
- Every permit record in Palmer, A to Z
- Discharge permits in Alaska
- Every permit record in Alaska, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The DIRTWORKS BARWOOD AVENUE EXTRACTION PIT storm water construction permit in Palmer carries a violation rate of 0.0% among the 196 storm water construction permits in Matanuska-Susitna Borough, and it has none of the records of a numeric pollutant limit or an effluent exceedance (both 0). Among the 8 NPDES permits in the Lower Knik River subwatershed, this permit issued in 2021 sits alongside a group where 2.6% of the borough's 196 storm water construction permits were issued before it.