Clean Water Act discharge permit · NPDES AKR10GI32
PARKS HWY MP 48.8-52.3 RECONSTRUCTION_2, Wasilla, AK: NPDES AKR10GI32 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
PARKS HWY MP 48.8-52.3 RECONSTRUCTION_2, held by John Binder - AK DOT&PF, holds NPDES permit AKR10GI32. EPA’s file records it issued August 22, 2023 and expiring January 31, 2026. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for PARKS HWY MP 48.8-52.3 RECONSTRUCTION_2: its NPDES ID, its permit type and status, its dates, its address in Wasilla, Alaska. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES AKR10GI32.
What stands out
- Its term runs 2 years and 162 days, August 22, 2023 to January 31, 2026; the term ended 256 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | PARKS HWY MP 48.8-52.3 RECONSTRUCTION_2 |
|---|---|
| Permittee as filed | John Binder - AK DOT&PF |
| NPDES ID | AKR10GI32 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 22, 2023 |
| Expiration date | January 31, 2026 |
| Issuing agency | Alaska Department of Environmental Conservation |
| Address | Wasilla, AK 99623 |
| Subwatershed | Meadow Creek (HUC 190204010502) |
| NAICS | 926120 – Regulation and Administration of Transportation Programs |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES AKR10GI32.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES AKR10GI32.
Inspections
EPA’s inspection file holds no inspection for NPDES AKR10GI32.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES AKR10GI32.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, AKR10GI32.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID AKR10GI32 there.
PARKS HWY MP 48.8-52.3 RECONSTRUCTION_2, Wasilla, Alaska: Coverage under a general permit AKR10GI32, held by John Binder - AK DOT&PF; Construction stormwater; Effective; issued August 22, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation; Regulation and Administration of Transportation Programs.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 466 were issued before AKR10GI32.
Coverages issued nearest AKR10GI32
- 2023-08-10: 100TH AVE SURFACE REHABILITATION MINNESOTA DR TO VICTOR RD, Anchorage: AKR10H0CX, held by Melinda Kohlhaas
- 2023-08-11: ZODIAK MANOR DRAINAGE IMPROVEMENT PROJECT, Anchorage: AKR10GN60, held by Shay Throop
- 2023-08-17: COPPER RIVER BOAT LAUNCH FACILITIES IMPROVEMENTS (FLAP), Chitina: AKR10H0D5, held by Royce Drennon
- 2023-08-18: COPPER RIVER BOAT LAUNCH FACILITIES IMPROVEMENTS, Chitina: AKR10H0D9, held by Joseph P. Kemp, P.E.
- 2023-08-18: THREE BEARS NORTH POLE, North Pole: AKR10H0DB, held by Randy Hunter
- 2023-08-25: 12 ACRE BIG LAKE, Wasilla: AKR10H07T, held by Cheyenne Goulette
- 2023-09-01: SOUTH CUSHMAN AREA, Fairbanks: AKR10H08C, held by James Young
- 2023-09-01: BEAR CREEK BRIDGE #0593 REPLACEMENT RICHARDSON HIGHWAY MP 233, Delta Junction: AKR10H0DY, held by Lori McCarter
- 2023-09-07: SOLID WASTE SERVICES CENTRAL TRANSFER STATION, Anchorage: AKR10GG93, held by Jed Shandy - Davis Constructors & Engineers, Inc.
- 2023-09-07: EIE429 REPAIR MOOSE LAKE UTILITIES, PHASE D_2, Eielson Afb: AKR10GQ41, held by James Sauceda
PARKS HWY MP 48.8-52.3 RECONSTRUCTION_2 among its neighbors
25 discharge permits are in the Meadow Creek subwatershed (HUC 190204010502); AKR10GI32 is one. Its county: 248, 0 major; AKR10GI32 is minor permit.
Other permits in the Meadow Creek subwatershed (HUC 190204010502)
- BELLA RIDGE SUBDIVISION, Wasilla: AKR10H0VR, minor, term to 2026-01-31
- BIG LAKE ROAD MP 0-3.6 AND CHURCH ROAD PAVEMENT PRESERVATION, Wasilla: AKR10H17N, minor, term to 2031-01-31
- BIG LAKE ROAD MP 0-3.6 CHURCH ROAD PAVEMENT PRESERVATION, Wasilla: AKR10H17P, minor, term to 2031-01-31
- BRUNS LAKE SUBDIVISION, Wasilla: AKR10GP91, minor, term to 2026-01-31
- BUS BARN, Wasilla: AKNOE0095, minor, term to 2020-09-23
- CHERI LAKE LID, Houston: AKR10CJ18, minor, term to 2026-01-31
- CHERI LAKE, KAREN, KING ARTHUR ROAD IMPROVEMENTS, Houston: AKR10H0B2, minor, term to 2026-01-31
- EAST LAKEVIEW ROAD PAVEMENT PRESERVATION, North Lakes: AKR10H0ZC, minor, term to 2026-01-31
- FOREST LAKE LID, Wasilla: AKR10H002, minor, term to 2026-01-31
- GNFT-SYSH FIBER TO THE HOME, Wasilla: AKR10GR10, minor, term to 2026-01-31
Nearby on the register
- Discharge permits in Wasilla
- Every permit record in Wasilla, A to Z
- Discharge permits in Alaska
- Every permit record in Alaska, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
The PARKS HWY MP 48.8-52.3 RECONSTRUCTION_2 storm water construction permit, filed under John Binder of AK DOT&PF, is one of 196 such permits in Matanuska-Susitna Borough, and 0.0% of those permits carry a violation on file. Against its peers, 34.2% of the 196 Matanuska-Susitna Borough storm water construction permits were issued before this one, and it sits among the 25 NPDES permits in the Meadow Creek subwatershed, this one included.