ANC TAXILANES E1, E3 AND E G RECONSTRUCTION, Anchorage, AK: NPDES AKR10GP79 discharge permit, effluent exceedances, inspections, penalties
ANC TAXILANES E1, E3 AND E G RECONSTRUCTION, Anchorage, Alaska: General permit coverage AKR10GP79, held by Wolfgang Junge - AK DOT&PF; Construction stormwater; Effective; issued September 16, 2022, term to January 31, 2026, by Alaska Department of Environmental Conservation.
Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 275 were issued before AKR10GP79. Wolfgang Junge - AK DOT&PF holds 7 permits in Alaska.
Other permits held by Wolfgang Junge - AK DOT&PF
- HSIP SEWARD HIGHWAY ROCKFALL MITIGATION, Anchorage: AKR10GI51, issued 2022-10-13
- NEWTOK AIRPORT RELOCATION _2, Newtok: AKR10GM20, issued 2021-06-01
- FEMA - NOV 2018 EQ ER CLARK-WOLVERINE ROAD, Palmer: AKR10GN71, issued 2021-08-04
- EAST HILL ROAD PAVEMENT PRESERVATION_2, Homer: AKR10GP80, issued 2023-05-08
- EAGLE RIVER LOOP PEDESTRIAN UNDERCROSSING-NOV 2018_2, Eagle River: AKR10GQ35, issued 2022-10-13
- AMATS CHUGACH FOOTHILL CONNECTOR PHASE II, Anchorage: AKR10GQ96, issued 2022-05-23
Coverages issued nearest AKR10GP79
- 2022-09-12: DTA014 PROVIDE AND INSTALL COMMUNICATIONS CABLE_2, Fort Greely: AKR10GO68, held by Mark DeRocchi - USACE/Alaska District
- 2022-09-12: HAWK LANE REINFORCEMENT, Houston: AKR10H03U, held by Vin Robinson, ENSTAR Natural Gas Company
- 2022-09-12: SKYVIEW AIRPARK GAS MAIN EXTENSION, Houston: AKR10H03V, held by Vin Robinson, ENSTAR Natural Gas Company
- 2022-09-13: NINILCHIK HARBOR REVETMENT REPLACEMENT, Ninilchik: AKR10H03Z, held by Amie Sommer, Tutka, LLC
- 2022-09-15: FTG218D MF 4, CP4 MISSILE FIELD INFRASTRUCTURE, Fort Greely: AKR10FY67, held by James B. Sauceda
- 2022-09-23: JALAPENOS MEXICAN CANTINA, Eagle River: AKR10H04A, held by Todd Bethard, GMC Contracting, Inc.
- 2022-09-28: TOGIAK AIRPORT RESURFACING, Togiak: AKR10CJ1H, held by Woflgang Junge, AKDOTPF
- 2022-09-30: ALKAID 2 AND 3 DRILLING SITES, Deadhorse: AKR10GQ82, held by Jeff Miller - Cruz Construction, Inc.
- 2022-10-03: MILLER LOOP REINFORCEMENT, Nikiski: AKR10H046, held by Vin Robinson, ENSTAR Natural Gas Company
- 2022-10-03: BLUEWATER BASECAMP, Chugiak: AKR10H04E, held by Russ Carpenter, 9 Below LLC
ANC TAXILANES E1, E3 AND E G RECONSTRUCTION among its neighbors
135 discharge permits are in the Knik Arm-Frontal Cook Inlet subwatershed (HUC 190204010808); AKR10GP79 is one. Its county: 555, 4 major; AKR10GP79 is minor permit.
Other permits in the Knik Arm-Frontal Cook Inlet subwatershed (HUC 190204010808)
- 36TH AVENUE RESURFACING PHASE I, Anchorage: AKR10GN68, minor, term to 2026-01-31
- 36TH AVENUE RESURFACING PHASE I_2, Anchorage: AKR10GO10, minor, term to 2026-01-31
- 36TH AVENUE RESURFACING, PHASE II, Anchorage: AKR10H0MX, minor, term to 2026-01-31
- 601 W 5TH AVE REPAIR AND RENOVATION, Anchorage: AKR10GH32, minor, term to 2026-01-31
- 601 W 5TH AVE REPAIR AND RENOVATION, Anchorage: AKR10GI61, minor, term to 2026-01-31
- ADOT AIA LAKE HOOD PESTICIDE ELODEA, Anchorage: AKG870023, minor, term to 2022-03-31
- ALASKA DOT AND PUBLIC FACILITIES, Anchorage: AKR10C980
- ALASKA MARINE TRUCKING Y1 YARD, Anchorage: AKR06AF24, minor, term to 2025-03-31
- AMATS DOWNTOWN TRAIL CONNECTION, Anchorage: AKG002432, minor, term to 2030-08-31
- ANC 7L/25R DUCT DRAINAGE, Anchorage: AKR10H0NM, minor, term to 2026-01-31
What stands out
- Its term runs 3 years and 137 days, September 16, 2022 to January 31, 2026; the term ended 227 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 3,110 discharge permits on the register in Alaska; 1,373 of them (44%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ANC TAXILANES E1, E3 AND E G RECONSTRUCTION |
|---|---|
| Permittee | Wolfgang Junge - AK DOT&PF |
| NPDES ID | AKR10GP79 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 16, 2022 |
| Expires | January 31, 2026 |
| Agency | Alaska Department of Environmental Conservation |
| Address | Anchorage, AK 99502 |
| Subwatershed | Knik Arm-Frontal Cook Inlet (HUC 190204010808) |
NPDES AKR10GP79: effluent limits and exceedances
ANC TAXILANES E1, E3 AND E G RECONSTRUCTION (NPDES AKR10GP79): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AKR10GP79: no pollutant row on file.
NPDES AKR10GP79: inspections, violations and enforcement
NPDES AKR10GP79 (ANC TAXILANES E1, E3 AND E G RECONSTRUCTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AKR10GP79
NPDES AKR10GP79: one email when its EPA record changes — $99/month.
Permits near NPDES AKR10GP79
NPDES AKR10GP79: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.