NPDES AZC116539 · Clean Water Act
KIPPER SUBSTATION AND TRANSMISSION LINE, AZ: NPDES AZC116539 discharge permit, effluent exceedances, inspections, penalties
KIPPER SUBSTATION AND TRANSMISSION LINE, Arizona: General permit coverage AZC116539, held by Tucson Electric Power Company; Effective; issued June 19, 2026, term to August 28, 2030, by ADEQ; discharges to Santa Cruz River | Nogales WWTP - JOSEPHINE CA.
Other permits held by Tucson Electric Power Company
- TUCSON ELECTRIC POWER - NORTH LOOP, Marana: AZ0024821, issued 2019-02-26
- CHEYENNE SUBSTATION: AZC103172, issued 2024-03-29
- HOUGHTON PI - UNDERGROUND 2025: AZC106717, issued 2024-12-31
- TEP GLOBAL WATER CONSTRUCTION PROJECT: AZC106759, issued 2025-01-06
- AZTEC MIDDLE COLLEGE, Tucson: AZC107655, issued 2025-02-21
- HOUGHTON P2 - UNDERGROUND 2025-2026: AZC109794, issued 2025-06-18
- MOHAVE VALLEY LANDFILL, Mohave Valley: AZC110530, issued 2025-08-14
- IRVINGTON GENERATING STATION, Tucson: AZC112129, issued 2025-09-29
- RIO RICO SWITCHYARD SUBSTATION, Rio Rico: AZC113568, issued 2025-11-25
- RIO RICO SWITCHYARD SUBSTATION, Rio Rico: AZC113638, issued 2025-12-04
KIPPER SUBSTATION AND TRANSMISSION LINE among its neighbors
3 discharge permits are in the Guevavi Canyon-Santa Cruz River subwatershed (HUC 150503010306); AZC116539 is one.
Other permits in the Guevavi Canyon-Santa Cruz River subwatershed (HUC 150503010306)
- KIPPER SUBSTATION AND TRANSMISSION LINE, Unknown: AZC117085, minor, term to 2030-08-28
- NOGALES INTERNATIONAL WASTEWATER TREATMENT PLANT, Rio Rico: AZMS80768, minor, term to 2024-12-30
What stands out
- Its term runs 4 years and 70 days, June 19, 2026 to August 28, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; the file names no program for it, and it is a minor discharger.
Identity
| Facility | KIPPER SUBSTATION AND TRANSMISSION LINE |
|---|---|
| Permittee | Tucson Electric Power Company |
| NPDES ID | AZC116539 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | June 19, 2026 |
| Expires | August 28, 2030 |
| Agency | ADEQ |
| Address | AZ 85714 |
| Receiving water | Santa Cruz River | Nogales WWTP - JOSEPHINE CA |
| Subwatershed | Guevavi Canyon-Santa Cruz River (HUC 150503010306) |
NPDES AZC116539: effluent limits and exceedances
KIPPER SUBSTATION AND TRANSMISSION LINE (NPDES AZC116539): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZC116539: no pollutant row on file.
NPDES AZC116539: inspections, violations and enforcement
NPDES AZC116539 (KIPPER SUBSTATION AND TRANSMISSION LINE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZC116539
NPDES AZC116539: one email when its EPA record changes — $99/month.
Permits near NPDES AZC116539
NPDES AZC116539: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.