NPDES AZR10I1CS · Clean Water Act
NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED, Sweetwater, AZ: NPDES AZR10I1CS discharge permit, effluent exceedances, inspections, penalties
NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED, Sweetwater, Arizona: General permit coverage AZR10I1CS, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY; Construction stormwater; Effective; issued July 2, 2025, term to February 16, 2027, by U.S. EPA.
Arizona holds 676 Construction stormwater coverages of this permit type in EPA’s file; 356 were issued before AZR10I1CS. NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY holds 145 permits in Arizona.
Other permits held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- N2007 (1-1) 1,2,4: 1389 NAVAJO, AZ BRIDGE AND ROAD CONSTRUCTION, Navajo: AZR10I01C, issued 2017-04-26
- NA-13-T30/XB9/XC1 GRAY MOUNTAIN EXTENSION PHASE I AND PHASE II, Cameron: AZR10I0A0, issued 2018-07-02
- NA-17-W09 SIHASIN OAK SPRINGS EAST CISTERNS, Oak Springs: AZR10I0H6, issued 2019-09-20
- NA-17-W08 SHIASIN OAK SPRINGS SOUTH CISTERNS, Oak Springs: AZR10I0H7, issued 2019-09-20
- NA-18-F70 FORT DEFIANCE MEDICAL REFERRALS 2018, Ganado: AZR10I0H9, issued 2019-09-20
- NA-17-F50 FORT DEFIANCE WEST HOUSING 2017, Burnside: AZR10I0HB, issued 2019-09-20
- NA-15-T56 TEESTO SAND DUNES EXTENSION, Teesto: AZR10I0HF, issued 2019-09-20
- NA-17-U02/ NA-21-W01/ NA-21-W71 LEUPP TO DILKON WATER TRANSMISSION LINE, Dilkon: AZR10I0HH, issued 2019-09-20
- NA-17-Q84/XO2/W28 HOUCK BURNTWATER WASH-HOUCK COMMUNITY WATER SYSTEM, Houck: AZR10I0I9, issued 2019-11-13
- NDOT RFP 18-10-1940LE: NECA 1402 WHEATFIELDS TO TSAILE WIDEN ROAD CONSTRUCTION, Wheatfields: AZR10I0ID, issued 2019-11-18
Coverages issued nearest AZR10I1CS
- 2025-06-12: ROUGH ROCK NORTH PHASE 2 WATERLINE EXTENSION (U58/XT2), Rough Rock: AZR10I1CG, held by Navajo Area Indian Health Services
- 2025-06-12: MOENKOPI WATER SUPPLY IMPROVEMENT PROJECT, Tuba City: AZR10I1CH, held by W.W. Clyde
- 2025-06-16: HUALAPAI ADMINISTRATION BUILDING, Peach Springs: AZR10I1CL, held by SEMA Construction Inc.
- 2025-06-17: NA-18-U39/XR2 CHINLE SCATTERED 2017, Chinle: AZR10I1CN, held by Navajo Area Indian Health Service
- 2025-06-26: TALKING STICK GOLD COURSE, Scottsdale: AZR10I1CQ, held by Dallas Construction LLC
- 2025-07-02: TOLANI LAKE BLACK FALLS II CISTERNS, DISTRICT 5, NA-22-LU5, Tolani Lake: AZR10I1CU, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-07-02: NA-18-U58/XT2 ROUGH ROCK NORTH. PHASE 2, WATERLINE EXTENSION, Rough Rock: AZR10I1CV, held by NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY
- 2025-07-14: CURRY ROAD SECTION 12 PROJECT, Scottsdale: AZR10I1CW, held by Logan Simpson
- 2025-07-17: SRPMIC FIRE STATION & FIRE RESOURCE FACILITY, Scottsdale: AZR10I1CY, held by Kitchell Conractors Inc., of AZ
- 2025-07-23: COUNTY RD 220-YELLOWJACKET RD, NW OF BYLAS, Bylas: AZR10I1CZ, held by Show Low Construction
NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED among its neighbors
6 discharge permits are in the Kit Sili Wash subwatershed (HUC 140802041604); AZR10I1CS is one.
Other permits in the Kit Sili Wash subwatershed (HUC 140802041604)
- N35(8)2&4 SWEETWATER PROJECT 1464, Totacon: AZR10I11D, minor, term to 2027-02-16
- N35(8)2&4 SWEETWATER PAVING REPAIR: PROJECT 1464, Sweetwater: AZR10I1GZ, minor, term to 2027-02-16
- N35(8)2&4-SWEETWATER, Sweetwater: AZR10I11A, minor, term to 2027-02-16
- NA-17-U12/XO1 SR SU WEST IX SCATTERED WATERLINE EXTENSIONS, Sweetwater: AZR10I0UY, minor, term to 2027-02-16
- NA-23-G53 ARIZONA SCATTERED, Sweetwater: AZR10I1BO, minor, term to 2027-02-16
What stands out
- Its term runs 1 year and 229 days, July 2, 2025 to February 16, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 7,318 discharge permits on the register in Arizona; 676 of them (9.2%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED |
|---|---|
| Permittee | NAVAJO ENGINEERING AND CONSTRUCTION AUTHORITY |
| NPDES ID | AZR10I1CS |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 2, 2025 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Sweetwater, AZ 86514 |
| Subwatershed | Kit Sili Wash (HUC 140802041604) |
NPDES AZR10I1CS: effluent limits and exceedances
NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED (NPDES AZR10I1CS): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES AZR10I1CS: no pollutant row on file.
NPDES AZR10I1CS: inspections, violations and enforcement
NPDES AZR10I1CS (NA-23-G53: UTAH, ARIZONA AND FOUR CORNERS SCATTERED): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES AZR10I1CS
NPDES AZR10I1CS: one email when its EPA record changes — $99/month.
Permits near NPDES AZR10I1CS
NPDES AZR10I1CS: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.