NPDES DCR1000C5 · Clean Water Act
EAST WEST OUTFALL RELIEF SEWER PIPE REHABILITATION, Washington Sw, DC: NPDES DCR1000C5 discharge permit, effluent exceedances, inspections, penalties
EAST WEST OUTFALL RELIEF SEWER PIPE REHABILITATION, Washington Sw, District of Columbia: General permit coverage DCR1000C5, held by Spiniello Companies; Construction stormwater; Effective; issued June 26, 2023, term to February 16, 2027, by U.S. EPA.
District of Columbia holds 228 Construction stormwater coverages of this permit type in EPA’s file; 95 were issued before DCR1000C5. Spiniello Companies holds 3 permits in District of Columbia.
Other permits held by Spiniello Companies
- GLOVER PARK EMERGENCY REPAIR - 10 SEWER, Washington: DCR1000C7, issued 2023-07-17
- VOLLEY BALL COURT RELOCATION, Washington Sw: DCR1000D0, issued 2024-06-12
Coverages issued nearest DCR1000C5
- 2023-02-28: BARRY FARMS 1A, Washington: DCR1000BY, held by Hamel Builders
- 2023-03-14: 5901 UTAH AVE NW FIELDS, Washington: DCR1000C0, held by The Episcopal Center for Children
- 2023-04-10: DEMO UPPER PARKING DECK AND INSTALL GROUND LEVEL PARKING, BUILDINGS 357 & 358, Washington, Dc: DCR1000C1, held by United States Air Force
- 2023-05-08: HU EAST TOWER, Washington: DCR1000C2, held by Noah Aldridge
- 2023-05-16: 801 17TH STREET NE, Washington: DCR1000C4, held by Mill Creek Residential Mid Atlantic Construction, LLC
- 2023-07-17: GLOVER PARK EMERGENCY REPAIR - 10 SEWER, Washington: DCR1000C7, held by Spiniello Companies
- 2023-07-31: HMX-1 FUEL SYSTEM UPGRADE, Washington: DCR1000C9, held by Joint Base Anacostia Bolling
- 2023-08-14: WASHINGTON INTERNATIONAL SCHOOL, Washington: DCR1000CA, held by JM Zell Partners, Ltd
- 2023-08-17: FORT LINCOLN, Washington: DCR1000CC, held by MCN Build
- 2023-09-19: BALD EAGLE RECREATION CENTER, Washington: DCR1000CF, held by Bennett Group
EAST WEST OUTFALL RELIEF SEWER PIPE REHABILITATION among its neighbors
124 discharge permits are in the Fourmile Run-Potomac River subwatershed (HUC 020700100301); DCR1000C5 is one. Its county: 242, 4 major; DCR1000C5 is minor permit.
Other permits in the Fourmile Run-Potomac River subwatershed (HUC 020700100301)
- 4600 FAIRFAX DRIVE, Arlington: VAR10W570, minor, term to 2029-06-30
- 624 N GLEBE RD, Arlington: VAR10O720, minor, term to 2024-06-30
- 901 NORTH FAIRFAX, Alexandria: VAR10M123, minor, term to 2024-06-30
- 901 PITT STREET, Alexandria: VAR10S425, minor, term to 2024-06-30
- ACE BUILDING RAZE, Alexandria: VAR10S976, minor, term to 2024-06-30
- AHDC GLEBE MOUNT VERNON, Alexandria: VAG830610, minor, term to 2028-02-29
- AHDC GLEBE/MT.VERNON, Alexandria: VAR10S111, minor, term to 2024-06-30
- AHDC SEMINARY ROAD, Alexandria: VAR10R749, minor, term to 2024-06-30
- ALABAMA AVENUE APARTMENTS, Washington, D.C.: DCR1000BR, minor, term to 2027-02-16
- ALEXAN COLUMBIA PIKE, Arlington: VAR10X283, minor, term to 2029-06-30
Identity
| Facility | EAST WEST OUTFALL RELIEF SEWER PIPE REHABILITATION |
|---|---|
| Permittee | Spiniello Companies |
| NPDES ID | DCR1000C5 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 26, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Washington Sw, DC 20032 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Fourmile Run-Potomac River (HUC 020700100301) |
NPDES DCR1000C5: effluent limits and exceedances
EAST WEST OUTFALL RELIEF SEWER PIPE REHABILITATION (NPDES DCR1000C5): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES DCR1000C5: no pollutant row on file.
NPDES DCR1000C5: inspections, violations and enforcement
NPDES DCR1000C5 (EAST WEST OUTFALL RELIEF SEWER PIPE REHABILITATION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES DCR1000C5
NPDES DCR1000C5: one email when its EPA record changes — $99/month.
Permits near NPDES DCR1000C5
NPDES DCR1000C5: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.