NPDES FLR10YD25 · Clean Water Act
MILLER, Vero Beach, FL: NPDES FLR10YD25 discharge permit, effluent exceedances, inspections, penalties
MILLER, Vero Beach, Florida: General permit coverage FLR10YD25, held by Croom Construction Company; Construction stormwater; Effective; issued December 19, 2025, term to December 18, 2030, by Florida Department of Environmental Protection.
Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 12,338 were issued before FLR10YD25. Croom Construction Company holds 13 permits in Florida.
Other permits held by Croom Construction Company
- TROENDLE PROJECT, Vero Beach: FLR10VQ96, issued 2023-01-14
- LOVELL PROJECT, Vero Beach: FLR10WM00, issued 2023-12-24
- BURNS RESIDENCE, Vero Beach: FLR10YC48, issued 2025-12-06
- URBAN PROJECT, Vero Beach: FLR10YC71, issued 2025-12-11
- 181 TERRAPIN POINT LLC, Vero Beach: FLR10YO19, issued 2026-06-19
- HILL DEMOLITION, Vero Beach: FLR10YP50, issued 2026-07-16
- BLAIR PROJECT, Vero Beach: FLR20EU48, issued 2021-09-20
- SEGAL RESIDENCE, Vero Beach: FLR20FU43, issued 2022-10-21
- SMITH 602, Vero Beach: FLR20FU45, issued 2022-10-22
- MAGUIRE GUESTHOUSE, Vero Beach: FLR20FY26, issued 2023-01-05
Coverages issued nearest FLR10YD25
- 2025-12-19: BARTOW REGIONAL MEDICAL CENTER, Lakeland: FLR10YD19, held by BayCare Health Syste,s
- 2025-12-19: BOCA WEST COUNTRY CLUB, Boca Raton: FLR10YD20, held by Lexicon, Inc. d/b/a Heritage Links
- 2025-12-19: RIDGE AT HARVEST POINT, Milton: FLR10YD21, held by Lennar Homes, LLC
- 2025-12-19: ENCLAVE AT BELLA TERRA, Cantonment: FLR10YD22, held by Lennar Homes, LLC
- 2025-12-19: SABAL PINES PARK NATURE TRAIL PHASES 1 AND 2, Coconut Creek: FLR10YD23, held by City of Coconut Creek
- 2025-12-19: PINE DOVE ESTATES, Tallahassee: FLR10YD26, held by D.R. Horton, Inc.
- 2025-12-19: DRURY INN, Destin: FLR10YD27
- 2025-12-19: NEENAH FOUNDRY - MIAMI OPERATIONS, Medley: FLR10YD28, held by Neenah Foundry Co. - Miami Operations
- 2025-12-19: SHADY HILLS WWTF, Spring Hill: FLR10YD29, held by Shady Hills WWTF
- 2025-12-19: SANDY POINTE-PHASE 2, Polk City: FLR20IV47, held by City Homes Polk City LLC
Other permits in Vero Beach
- 10087 NEW SINGLE FAMILY CONSTRUCTION, Vero Beach: FLR10WX89, minor, term to 2029-06-28
- 100TH CT, Vero Beach: FLR10WV17, minor, term to 2029-05-19
- 10620 92ND ST. VERO BEACH, Vero Beach: FLR10XJ74, minor, term to 2030-01-25
- 1065 74TH AVE., Vero Beach: FLR10WL18, minor, term to 2028-12-14
- 1124 VERO LOT, Vero Beach: FLR10XS37, minor, term to 2030-06-04
- 1125 10TH AVE SW, Vero Beach: FLR10XP24, minor, term to 2030-04-16
- 11TH DRIVE - HARBOR BLUFFS, Vero Beach: FLR20FM17, minor, term to 2027-06-08
- 1235 & 1245 11TH CT. SW, Vero Beach: FLR10XC35, minor, term to 2029-09-08
- 125 49TH AVE, Vero Beach: FLR10XZ52, minor, term to 2030-10-08
- 16TH STREET APARTMENTS, Vero Beach: FLR20GS04, minor, term to 2028-10-13
Identity
| Facility | MILLER |
|---|---|
| Permittee | Croom Construction Company |
| NPDES ID | FLR10YD25 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 19, 2025 |
| Expires | December 18, 2030 |
| Agency | Florida Department of Environmental Protection |
| Address | Vero Beach, FL 32963 |
| Receiving water impaired | 303(D) Listed |
NPDES FLR10YD25: effluent limits and exceedances
MILLER (NPDES FLR10YD25): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES FLR10YD25: no pollutant row on file.
NPDES FLR10YD25: inspections, violations and enforcement
NPDES FLR10YD25 (MILLER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES FLR10YD25
NPDES FLR10YD25: one email when its EPA record changes — $99/month.
Permits near NPDES FLR10YD25
NPDES FLR10YD25: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.