NPDES GAR152939 · Clean Water Act
COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL K (GLYNN COUNTY), GA: NPDES GAR152939 discharge permit, effluent exceedances, inspections, penalties
COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL K (GLYNN COUNTY), Georgia: General permit coverage GAR152939, held by GEORGIA PORTS AUTHORITY; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR152939. GEORGIA PORTS AUTHORITY holds 10 permits in Georgia.
Other permits held by GEORGIA PORTS AUTHORITY
- MITSUBISHI POWER SYSTEMS MANUFACTURING PLANT PHASE 5 (SAVANNAH MACHINERY WORKS), Pooler: GAR134705, issued 2013-09-23
- OFF TERMINAL PARKING - TRIANGLE TRACT, Garden City: GAR134955, issued 2013-09-23
- OCEAN TERMINAL PAVING SOUTH OF VIADUCT (CHATHAM COUNTY), Savannah: GAR148616, issued 2013-09-23
- COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 1 (GLYNN COUNTY): GAR149855, issued 2013-09-23
- COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: RAIL YARD (GLYNN COUNTY: GAR152050, issued 2013-09-23
- COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: RAIL YARD PHASE 2 (GLYN: GAR152627, issued 2013-09-23
- COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL D PHASE 2 (GLYNN: GAR153079, issued 2013-09-23
- CONTAINER BERTH SUPPORT SERVICES AREA 2 - 3: GAR244954, issued 2013-09-23
- STRIP - PARCEL 3 (CHATHAM COUNTY), Savannah: GAR382409, issued 2013-09-23
Coverages issued nearest GAR152939
- 2013-09-23: ANIMAL SHELTER (DALTON), Dalton: GAR152932, held by Humane Society of Northwest Georgia
- 2013-09-23: OAKLAND HEIGHTS BAPTIST CHURCH PARKING ADDITION, Cartersville: GAR152934, held by Oakland Heights Baptist Church
- 2013-09-23: H16314 BRIGHT STAR RD. PROJECT, Douglasville: GAR152935, held by SL Bright Star LLC
- 2013-09-23: PHILLIPS RESIDENCE: GAR152936, held by David Phillips
- 2013-09-23: NEWTON BAPTIST CHURCH ADDITION: GAR152937
- 2013-09-23: PHILLIPS HORNSBY FARMS, INC. INERT LANDFILL CLOSURE: GAR152940, held by Phillip Hornsby c/o Bill Burke
- 2013-09-23: SUPERIOR LANDFILL & RECYCLING CENTER - CELL 10B CONSTRUCTION DRAWINGS (CHATHAM C, Savannah: GAR152941, held by Terry Darragh
- 2013-09-23: NEW SANCTUARY BUILDING FAITH CHRISTIAN CENTER, Austell: GAR152942, held by Word of Faith Christian Center Church
- 2013-09-23: COOL RIVER ALPINE COASTER, Helen: GAR152944, held by American Sites, Inc.
- 2013-09-23: RINGGOLD MIDDLE/HIGH SCHOOL BALLFIELDS, Ringgold: GAR152945, held by Catoosa County Board of Education
COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL K (GLYNN COUNTY) among its neighbors
44 discharge permits are in the Jointer Creek-Little Satilla River subwatershed (HUC 030702030302); GAR152939 is one.
Other permits in the Jointer Creek-Little Satilla River subwatershed (HUC 030702030302)
- 11 SAINT LAWRENCE CT, Brunswick: GAR396E74, minor, term to 2028-07-31
- 117 HURON LOOP, Brunswick: GAR396E80, minor, term to 2028-07-31
- 121 HURON LOOP, Brunswick: GAR396E77, minor, term to 2028-07-31
- 126 MICHIGAN WAY, Brunswick: GAR396E72, minor, term to 2028-07-31
- 140 FRONTAGE RD, Brunswick: GAR18BBBD, minor, term to 2028-07-31
- 153 HURON LOOP, Brunswick: GAR396E71, minor, term to 2028-07-31
- 169 LAKES DR, Brunswick: GAR396E70, minor, term to 2028-07-31
- 17 SUPERIOR DR, Brunswick: GAR396E75, minor, term to 2028-07-31
- 17, 19, 21 SAINT LAWRENCE CT, Brunswick: GAR396E83, minor, term to 2028-07-31
- 205 HURON LOOP, Brunswick: GAR396E76, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL K (GLYNN COUNTY) |
|---|---|
| Permittee | GEORGIA PORTS AUTHORITY |
| NPDES ID | GAR152939 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Jointer Creek-Little Satilla River (HUC 030702030302) |
NPDES GAR152939: effluent limits and exceedances
COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL K (GLYNN COUNTY) (NPDES GAR152939): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR152939: no pollutant row on file.
NPDES GAR152939: inspections, violations and enforcement
NPDES GAR152939 (COLONEL'S ISLAND TERMINAL SOUTHSIDE - EARTHWORK PHASE 3: PARCEL K (GLYNN COUNTY)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR152939
NPDES GAR152939: one email when its EPA record changes — $99/month.
Permits near NPDES GAR152939
NPDES GAR152939: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.