NPDES GAR18B20B · Clean Water Act
SICCE, Kingsland, GA: NPDES GAR18B20B discharge permit, effluent exceedances, inspections, penalties
SICCE, Kingsland, Georgia: General permit coverage GAR18B20B, held by William H. Gross; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B20B. William H. Gross holds 7 permits in Georgia.
Other permits held by William H. Gross
- HUTCHINS POND LDA (CAMDEN COUNTY): GAR148439, issued 2013-09-23
- GROSS PARCEL B, St. Marys: GAR18AF4D, issued 2018-08-01
- OLD STILL INDUSTRIAL, Kingsland: GAR18BB84, issued 2023-08-01
- THE LEGACY PHASE 2, Savannah: GAR18C155, issued 2023-08-01
- SALT BRANCH LDA2, Kingsland: GAR397452, issued 2023-08-01
- FRIENDSHIP 42, Kingsland: GAR3975A8, issued 2023-08-01
Coverages issued nearest GAR18B20B
- 2023-08-01: DOLLAR GENERAL 31179 GLENNVILLE, Glennville: GAR18B206, held by Zach Crumley
- 2023-08-01: MINH NGUYEN'S BROILER FARM, Colquitt: GAR18B207, held by Minh Nguyen
- 2023-08-01: BETHEL MIDTOWN VILLAGE - VERTICAL (TUCKERCRAFT), Athens: GAR18B208, held by Athens Housing Authority
- 2023-08-01: 124 AUSTIN DRIVE, Forsyth: GAR18B209, held by Meredith Homes Inc
- 2023-08-01: DOLLAR GENERAL - WHITEOAK ROAD, Thomson: GAR18B20A, held by Trotter General, LLC
- 2023-08-01: YANCEY ENGINEERING SOLUTIONS, Griffin: GAR18B20C, held by Yancey Engineered Solutions
- 2023-08-01: HENRICO, Conley: GAR18B20E, held by Henrico Owner LLC
- 2023-08-01: FAIRHAVEN SUBDIVISION, Mcdonough: GAR18B20F, held by Gene Johnson
- 2023-08-01: CITY OF HAMPTON CONVENIENCE CENTER, Hampton: GAR18B210, held by Gaganjot Sambi
- 2023-08-01: GARRETT RESIDENCE, Bishop: GAR18B212, held by John Garrett
SICCE among its neighbors
60 discharge permits are in the Upper Crooked River subwatershed (HUC 030702030501); GAR18B20B is one.
Other permits in the Upper Crooked River subwatershed (HUC 030702030501)
- 366 WINDING RIVER, St Marys: GAR396E13, minor, term to 2028-07-31
- BOUNDARY HALL PHASE 1, Walthourville: GAR3967FB, minor, term to 2028-07-31
- CAMDEN COUNTY HIGH SCHOOL - FINE ARTS ACADEMY ADDITION, Kingsland: GAR153AA4, minor, term to 2018-07-31
- CAMDEN COUNTY HIGH SCHOOL WRESTLING FACILITY, Kingsland: GAR18BACF, minor, term to 2028-07-31
- CAMDEN COUNTY INDUSTRIAL PARK - SITE CLEARING (CAMDEN COUNTY), Kingsland: GAR151067, minor, term to 2018-07-31
- CAMDEN INDUSTRIAL PARK P79471, Woodbine: GAR2493E6, minor, term to 2025-01-31
- CAMDEN WOODS LDA 1A AND 1B, Kingsland: GAR397489, minor, term to 2028-07-31
- CAMDEN WOODS LDA2, Kingsland: GAR39731F, minor, term to 2028-07-31
- CAMDEN WOODS PARKWAY, Kingsland: GAR25421D, minor, term to 2028-07-31
- CANOPY OAKS, Kingsland: GAR395230, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SICCE |
|---|---|
| Permittee | William H. Gross |
| NPDES ID | GAR18B20B |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Kingsland, GA 31548 |
| Subwatershed | Upper Crooked River (HUC 030702030501) |
NPDES GAR18B20B: effluent limits and exceedances
SICCE (NPDES GAR18B20B): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B20B: no pollutant row on file.
NPDES GAR18B20B: inspections, violations and enforcement
NPDES GAR18B20B (SICCE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B20B
NPDES GAR18B20B: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B20B
NPDES GAR18B20B: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.