NPDES GAR248557 · Clean Water Act
UNION CITY PEDESTRIAN SYSTEM @ 3 LOCS - PHASE III, GA: NPDES GAR248557 discharge permit, effluent exceedances, inspections, penalties
UNION CITY PEDESTRIAN SYSTEM @ 3 LOCS - PHASE III, Georgia: General permit coverage GAR248557, held by City of Union City; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018; Water and Sewer Line and Related Structures Construction.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR248557.
Coverages issued nearest GAR248557
- 2013-09-23: ETOWAH RIVERWALK LINK, MULTI-USE TRAIL LEAKE-MOUNDS, Cartersville: GAR248545, held by Cartersville Parks & Recreation
- 2013-09-23: THE DEL MAR CLUB @ HARBINS PHASE 3 A LOT 108, Dacula: GAR248546, held by DR Horton- Crown LLC
- 2013-09-23: THE DEL MAR CLUB LOT -15, Dacula: GAR248548, held by DR Horton- Crown LLC
- 2013-09-23: IRWIN COUNTY 2015 CDBG: GAR248550, held by Irwin County Board of Commissioners
- 2013-09-23: HIDDEN FOREST SUBDIVISION (2016 COMM. DEVELOPMENT BLOCK GRANT (ATKINSON COUNTY), Pearson: GAR248552, held by ATKINSON COUNTY
- 2013-09-23: PARK PLACE DRIVE PEDESTRIAN SAFETY IMPROVEMENTS: GAR248558, held by City of Lawrenceville
- 2013-09-23: BROWN BRIDGE ROAD -PVC WATER MAIN REPLACEMENT, Covington: GAR248559
- 2013-09-23: CHEROKEE TRACE: GAR248560, held by Forsyth County Department of Water & Sewer
- 2013-09-23: NORFOLK SOUTHERN PROPOSED WYE AND DETOUR TRACKS (EPD-WCD), Macon: GAR248561, held by Norfolk Southern Railway Company
- 2013-09-23: WILMINGTON ISLAND 115 KV SUBSTATION (CHATHAM COUNTY): GAR248563, held by GEORGIA POWER COMPANY
UNION CITY PEDESTRIAN SYSTEM @ 3 LOCS - PHASE III among its neighbors
458 discharge permits are in the Morning Creek subwatershed (HUC 031300050103); GAR248557 is one.
Other permits in the Morning Creek subwatershed (HUC 031300050103)
- 150 OAK TERRACE, Fayetteville: GAR396817, minor, term to 2028-07-31
- 165 GADSON, Fayetteville: GAR18B2F6, minor, term to 2028-07-31
- 165 GADSON DRIVE, Fayetteville: GAR3966FC, minor, term to 2028-07-31
- 175 GADSON DRIVE, Fayetteville: GAR39677A, minor, term to 2028-07-31
- 185 GADSON DR, Fayetteville: GAR18B300, minor, term to 2028-07-31
- 185 GADSON DR, Fayetteville: GAR3966FD, minor, term to 2028-07-31
- 2532 BOLTON ROAD R.M. CLAYTON, Atlanta: GAR152059, minor, term to 2018-07-31
- A1 FOOD MART, Fayetteville: GAR18AF32, minor, term to 2025-01-31
- ADC FAYETTEVILLE, LLC HWY 85 N FAYETTEVILLE, GA, Fayetteville: GAR395F98, minor, term to 2025-01-31
- AIRPORT WEST DISTRIBUTION CENTER 600, College Park: GAR18B68A, minor, term to 2028-07-31
Identity
| Facility | UNION CITY PEDESTRIAN SYSTEM @ 3 LOCS - PHASE III |
|---|---|
| Permittee | City of Union City |
| NPDES ID | GAR248557 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
| Subwatershed | Morning Creek (HUC 031300050103) |
| NAICS | 237110 – Water and Sewer Line and Related Structures Construction |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES GAR248557: effluent limits and exceedances
UNION CITY PEDESTRIAN SYSTEM @ 3 LOCS - PHASE III (NPDES GAR248557): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR248557: no pollutant row on file.
NPDES GAR248557: inspections, violations and enforcement
NPDES GAR248557 (UNION CITY PEDESTRIAN SYSTEM @ 3 LOCS - PHASE III): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR248557
NPDES GAR248557: one email when its EPA record changes — $99/month.
Permits near NPDES GAR248557
NPDES GAR248557: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.