NPDES GAR2544B8 · Clean Water Act
EAST MOULTRIE- HWY 37 230KV TL (P79440), Camilla, GA: NPDES GAR2544B8 discharge permit, effluent exceedances, inspections, penalties
EAST MOULTRIE- HWY 37 230KV TL (P79440), Camilla, Georgia: General permit coverage GAR2544B8, held by John Raese; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR2544B8. John Raese holds 43 permits in Georgia.
Other permits held by John Raese
- NORTH RIVER ROAD SS, Douglasville: GAR249343, issued 2023-08-01
- JUDY MOUNTAIN 230/115 KV SUBSTATION, Rome: GAR2493DA, issued 2018-08-01
- LONE OAK SUBSTATION, Hogansville: GAR2541B4, issued 2018-08-01
- WHITEPATH SUBSTATION, Blue Ridge: GAR2541B8, issued 2018-08-01
- ANTHONY SHOALS - WASHINGTON REBUILD PHASE II C81558, Lincolnton: GAR25423E, issued 2023-08-01
- LIZARD LOPE - GILLIONVILLE TL (P79433), Albany: GAR2542D2, issued 2023-08-01
- DUNBAR ROAD 115/12KV SUBSTATION, Warner Robins: GAR254317, issued 2023-08-01
- EAST WALTON- ROCKVILLE & BOSTWICK - EAST WALTON TL - SEGMENT 1 P79463 & P79468, Goodhope: GAR25432B, issued 2023-08-01
- MORNING HORNET- NEWBORN ROAD TL P79425, Rutledge: GAR254354, issued 2023-08-01
- EAST WALTON- ROCKVILLE & BOSTWICK - EAST WALTON TL - SEGMENT 2 P79463 & P79468, Goodhope: GAR25436B, issued 2023-08-01
Coverages issued nearest GAR2544B8
- 2023-08-01: COLLINS ROAD WATER LINE EXTENSION - PHASE I/II, Mcdonough: GAR2544B3, held by Henry County Water Authority
- 2023-08-01: ADS PERRY GEORGIA, Perry: GAR2544B4, held by Advanced Drainage Systems, Inc
- 2023-08-01: WATER AND SEWER EXTENSION PLANS OF RIVERWOOD COMMERCIAL, Evans: GAR2544B5, held by Keith Lawrence
- 2023-08-01: MONROE #5 SUBSTATION, Monroe: GAR2544B6, held by Kevin Mullinax (MEAG Power)
- 2023-08-01: PI 0019263 WARE COUNTY, CONSTRUCTION OF A BRIDGE AND APPROACHES ON SWAMP RD (CR, Waycross: GAR2544B7, held by Georgia Department of Transportation
- 2023-08-01: GA HWY 49 ENTRANCE TO POSTELL QUARRY, Macon: GAR2544B9, held by Chryl DeCrenza
- 2023-08-01: PI 0016089 BARROW, GWINNETT, HALL - WIDENING AND ADDITIONAL LANES ON SR 211 BEGI, Braselton: GAR2544BA, held by Georgia Department of Transportation
- 2023-08-01: AUTOMATED TRANSIT NETWORK SERVICES PILOT, Atlanta: GAR2544BB, held by College Park Business & Industrial Development
- 2023-08-01: HARD LABOR CREEK WATER TRANSMISSION MAIN - PHASE 1, Social Circle: GAR2544BC, held by Morris Jordan
- 2023-08-01: FTB REC 2602505 CONSTRUCT 2ND ARMORED DIVISION SIDEWALK, Fort Benning: GAR2544BD, held by U.S. ARMY INFANTRY CENTER, KIRK TICKNOR
EAST MOULTRIE- HWY 37 230KV TL (P79440) among its neighbors
9 discharge permits are in the Rigsby Lake-Big Slough subwatershed (HUC 031300080501); GAR2544B8 is one.
Other permits in the Rigsby Lake-Big Slough subwatershed (HUC 031300080501)
- AUTRY CORRECTIONAL INSTITUTE, Camilla: GAU030740, minor, term to 2008-08-11
- BROILER CHICKEN HOUSES FOR MATHIS ACREE, Unknown: GAR146941, minor, term to 2018-07-31
- HAYS/LTI, Unknown: GAR149501, minor, term to 2018-07-31
- HIGHWAY 37 230 KV SUBSTATION P79447, Camilla: GAR25449F, minor, term to 2028-07-31
- LAKE PLEASANT CHURCH ROAD, Camilla: GAR2542E1, minor, term to 2028-07-31
- PHOEBE PUTNEY MEMORIAL HOSPITAL - CAMILLA FAMILY MEDICAL CENTER, Camilla: GAR150377, minor, term to 2018-07-31
- SOUTHFORK APARTMENTS, Camilla: GAR149250, minor, term to 2018-07-31
- WASTEWATER TREATMENT FACILITY UPGRADE, Unknown: GAR118378, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | EAST MOULTRIE- HWY 37 230KV TL (P79440) |
|---|---|
| Permittee | John Raese |
| NPDES ID | GAR2544B8 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Camilla, GA 31730 |
| Subwatershed | Rigsby Lake-Big Slough (HUC 031300080501) |
NPDES GAR2544B8: effluent limits and exceedances
EAST MOULTRIE- HWY 37 230KV TL (P79440) (NPDES GAR2544B8): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR2544B8: no pollutant row on file.
NPDES GAR2544B8: inspections, violations and enforcement
NPDES GAR2544B8 (EAST MOULTRIE- HWY 37 230KV TL (P79440)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR2544B8
NPDES GAR2544B8: one email when its EPA record changes — $99/month.
Permits near NPDES GAR2544B8
NPDES GAR2544B8: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.