NPDES GAR352294 · Clean Water Act
GRANDVIEW ESTATES PHASE TWO - LOT 145, Flowery Branch, GA: NPDES GAR352294 discharge permit, effluent exceedances, inspections, penalties
GRANDVIEW ESTATES PHASE TWO - LOT 145, Flowery Branch, Georgia: General permit coverage GAR352294, held by Premier Residential Builders; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR352294. Premier Residential Builders holds 15 permits in Georgia.
Other permits held by Premier Residential Builders
- GRANDVIEW ESTATES PHASE 2 - LOT 59, 60 AND 61, Flowery Branch: GAR352295, issued 2013-09-23
- QUAILWOOD SUBDIVISION - LOT 41, Flowery Branch: GAR352296, issued 2013-09-23
- QUAILWOOD SUBDIVISION - LOT 52, Flowery Branch: GAR352297, issued 2013-09-23
- WHITE HORSE CREEK PHASE 1 - (F.K.A. COVE CREEK, PHASE 1) - LOT 39, Flowery Branch: GAR355746, issued 2013-09-23
- WHITE HORSE CREEK PHASE 1 - (F.K.A. COVE CREEK, PHASE 1) - LOT 44, Flowery Branch: GAR355748, issued 2013-09-23
- WHITE HORSE CREEK PHASE 1 ? (F.K.A. COVE CREEK, PHASE 1) - LOT 46, Flowery Branch: GAR355750, issued 2013-09-23
- WHITE HORSE CREEK PHASE 1 ? (F.K.A. COVE CREEK, PHASE 1) - LOT 47, Flowery Branch: GAR355751, issued 2013-09-23
- WHITE HORSE CREEK PHASE 1 ? (F.K.A. COVE CREEK, PHASE 1) - LOT 48, Flowery Branch: GAR355753, issued 2013-09-23
- WHITE HORSE CREEK PHASE 1 ? (F.K.A. COVE CREEK, PHASE 1) - LOT 49, Flowery Branch: GAR355754, issued 2013-09-23
- WHITE HORSE CREEK PHASE 1 ? (F.K.A. COVE CREEK, PHASE 1) - LOT 50, Flowery Branch: GAR355755, issued 2013-09-23
Coverages issued nearest GAR352294
- 2013-09-23: CHESTEE COVE - LOTS 20, 31, 25, 26: GAR352280, held by Lowe Properties
- 2013-09-23: COLE'S POND - LOT 27: GAR352288, held by SOUTH POINT CONSTRUCTION
- 2013-09-23: ANTRIM GLEN - LOT 16: GAR352289, held by Larry Cooper
- 2013-09-23: JADEN POINT - LOT 17: GAR352291, held by Paradign Construction Co
- 2013-09-23: JADEN POINT - LOT 1: GAR352292, held by Paradign Construction Co
- 2013-09-23: GRANDVIEW ESTATES PHASE 2 - LOT 59, 60 AND 61, Flowery Branch: GAR352295, held by Premier Residential Builders
- 2013-09-23: QUAILWOOD SUBDIVISION - LOT 41, Flowery Branch: GAR352296, held by Premier Residential Builders
- 2013-09-23: QUAILWOOD SUBDIVISION - LOT 52, Flowery Branch: GAR352297, held by Premier Residential Builders
- 2013-09-23: GRANITE HILL, SECTION 4, Augusta: GAR352300, held by Metro Homesites, Inc.
- 2013-09-23: MAGNOLIA RIDGE, PHASE 2: GAR352304, held by Jerome Boggus
GRANDVIEW ESTATES PHASE TWO - LOT 145 among its neighbors
284 discharge permits are in the Upper Mulberry River subwatershed (HUC 030701010201); GAR352294 is one.
Other permits in the Upper Mulberry River subwatershed (HUC 030701010201)
- 3199 THOMPSON MILL RD, Buford: GAR18BF84, minor, term to 2028-07-31
- 3201 THOMPSON MILL RD, Buford: GAR18BF95, minor, term to 2028-07-31
- 5641 WOODED VALLEY WAY - LOT 70, Unknown: GAR354656, minor, term to 2018-07-31
- 5668 DEEP CREEK CT. - LOT 46, Unknown: GAR354663, minor, term to 2018-07-31
- 5680 DEEP CREEK CT - LOT 49, Unknown: GAR354659, minor, term to 2018-07-31
- 570 RIVERMOORE DR - LOT 22-29, Braselton: GAR371363, minor, term to 2018-07-31
- 5782 RIVERMORE DR - LOT 30-39, Braselton: GAR371366, minor, term to 2018-07-31
- 5828 RIVERMOORE DRIVE - LOT 40-43, Braselton: GAR371368, minor, term to 2018-07-31
- 5843 RIVERMOORE DRIVE - LOT 143-160, Braselton: GAR371369, minor, term to 2018-07-31
- 5843 RIVERMORE DRIVE - RIVERBEND AT MULBERRY SD, Braselton: GAR373180, minor, term to 2018-07-31
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | GRANDVIEW ESTATES PHASE TWO - LOT 145 |
|---|---|
| Permittee | Premier Residential Builders |
| NPDES ID | GAR352294 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | Flowery Branch, GA 30542 |
| Subwatershed | Upper Mulberry River (HUC 030701010201) |
NPDES GAR352294: effluent limits and exceedances
GRANDVIEW ESTATES PHASE TWO - LOT 145 (NPDES GAR352294): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR352294: no pollutant row on file.
NPDES GAR352294: inspections, violations and enforcement
NPDES GAR352294 (GRANDVIEW ESTATES PHASE TWO - LOT 145): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR352294
NPDES GAR352294: one email when its EPA record changes — $99/month.
Permits near NPDES GAR352294
NPDES GAR352294: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.