NPDES GAR352746 · Clean Water Act
NEELY MANOR - PHASE TWO, GA: NPDES GAR352746 discharge permit, effluent exceedances, inspections, penalties
NEELY MANOR - PHASE TWO, Georgia: General permit coverage GAR352746, held by RL REGI MHU, LLC; Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR352746.
Coverages issued nearest GAR352746
- 2013-09-23: FOGGY CEDARS, LOT 9, Hamilton: GAR352741, held by GRAYHAWK HOMES, INC.
- 2013-09-23: FOGGY CEDARS, LOT 1, Hamilton: GAR352742, held by GRAYHAWK HOMES, INC.
- 2013-09-23: CREEKSIDE SUBDIVISION LOT # 184, Hahira: GAR352743, held by SOUTH GEORGIA CONSTRUCTION
- 2013-09-23: CREEKSIDE WEST SUBDIVISION LOT # 27, Hahira: GAR352744, held by TIM TILLMAN
- 2013-09-23: BOYD BRANCH DRIVE, LOT134, Ellerslie: GAR352745, held by RCR Builder Inc.
- 2013-09-23: FLOWERY BRANCH TECHNICAL CENTER LOT 4D, Flowery Branch: GAR352749, held by Keystone Builders Inc.
- 2013-09-23: COTTAGES AND CABINS AT OLD TOCCOA FARM, Blue Ridge: GAR352750, held by OTF Holdings, LLC
- 2013-09-23: SUTHERLAND SUBDIVISION - LOT 40, Winder: GAR352751, held by LGI Homes, LLC
- 2013-09-23: HIDDEN CREEK, SECTION F-G: GAR352752, held by Baker Group LLC
- 2013-09-23: WINDING LAKE, LOT 24 A, Hamilton: GAR352753, held by Jack Hughston
What stands out
- Its term runs 4 years and 311 days, September 23, 2013 to July 31, 2018; the term ended 2,968 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | NEELY MANOR - PHASE TWO |
|---|---|
| Permittee | RL REGI MHU, LLC |
| NPDES ID | GAR352746 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 23, 2013 |
| Expires | July 31, 2018 |
| Address | GA |
NPDES GAR352746: effluent limits and exceedances
NEELY MANOR - PHASE TWO (NPDES GAR352746): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR352746: no pollutant row on file.
NPDES GAR352746: inspections, violations and enforcement
NPDES GAR352746 (NEELY MANOR - PHASE TWO): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR352746
NPDES GAR352746: one email when its EPA record changes — $99/month.
Permits near NPDES GAR352746
NPDES GAR352746: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.