Velarion Records
Free: one email when NPDES GAR372972 changes. Unsubscribe any time.

NPDES GAR372972 · Clean Water Act

GEORGIA POWER CO. (BURNS WETHERINGTON) 2017 BLANKET SECONDARY, Atlanta, GA: NPDES GAR372972 discharge permit, effluent exceedances, inspections, penalties

GEORGIA POWER CO. (BURNS WETHERINGTON) 2017 BLANKET SECONDARY, Atlanta, Georgia: General permit coverage GAR372972, held by Georgia Power Company (Burns Wetherington); Construction stormwater; Effective; issued September 23, 2013, term to July 31, 2018; Power and Communication Line and Related Structures Construction.

Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 24 were issued before GAR372972. Georgia Power Company (Burns Wetherington) holds 15 permits in Georgia.

Other permits held by Georgia Power Company (Burns Wetherington)

Coverages issued nearest GAR372972

GEORGIA POWER CO. (BURNS WETHERINGTON) 2017 BLANKET SECONDARY among its neighbors

222 discharge permits are in the Peachtree Creek subwatershed (HUC 031300011204); GAR372972 is one. Its county: 143, 4 major; GAR372972 is minor permit.

Other permits in the Peachtree Creek subwatershed (HUC 031300011204)

Identity

FacilityGEORGIA POWER CO. (BURNS WETHERINGTON) 2017 BLANKET SECONDARY
PermitteeGeorgia Power Company (Burns Wetherington)
NPDES IDGAR372972
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 23, 2013
ExpiresJuly 31, 2018
AddressAtlanta, GA 30308
SubwatershedPeachtree Creek (HUC 031300011204)
NAICS237130 – Power and Communication Line and Related Structures Construction
SIC1623 – Water, Sewer, And Utility Lines
Other EPA IDs (FRS)RCRA handler GAD981237829

NPDES GAR372972: effluent limits and exceedances

GEORGIA POWER CO. (BURNS WETHERINGTON) 2017 BLANKET SECONDARY (NPDES GAR372972): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES GAR372972: no pollutant row on file.

NPDES GAR372972: inspections, violations and enforcement

NPDES GAR372972 (GEORGIA POWER CO. (BURNS WETHERINGTON) 2017 BLANKET SECONDARY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES GAR372972

NPDES GAR372972: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES GAR372972

NPDES GAR372972: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.