Velarion Records
Free: one email when NPDES IDR05J11M changes. Unsubscribe any time.

NPDES IDR05J11M · Clean Water Act

GLC ROSE PIT, Blackfoot, ID: NPDES IDR05J11M discharge permit, effluent exceedances, inspections, penalties

GLC ROSE PIT, Blackfoot, Idaho: General permit coverage IDR05J11M, held by Gale Lim Construction LLC; Industrial stormwater; Administratively continued; issued January 15, 2021, term to February 28, 2026; discharges to SNAKE RIVER.

  • Solids, total suspended: 3 limits, 3 violations of any kind.
  • Selenium, total recoverable: 1 limit, 1 violation of any kind.
  • Nitrite Plus Nitrate Total: 1 limit, 1 violation of any kind.
  • Suspended Solids, Total: 1 limit, 1 violation of any kind.

Idaho holds 245 Industrial stormwater coverages of this permit type in EPA’s file; 32 were issued before IDR05J11M. Gale Lim Construction LLC holds 2 permits in Idaho.

Other permits held by Gale Lim Construction LLC

Coverages issued nearest IDR05J11M

GLC ROSE PIT among its neighbors

9 discharge permits are in the Jensen Lake-Snake River subwatershed (HUC 170402060305); IDR05J11M is one.

Other permits in the Jensen Lake-Snake River subwatershed (HUC 170402060305)

Identity

FacilityGLC ROSE PIT
PermitteeGale Lim Construction LLC
NPDES IDIDR05J11M
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramIndustrial stormwater
IssuedJanuary 15, 2021
ExpiresFebruary 28, 2026
AddressBlackfoot, ID 83221
Receiving waterSNAKE RIVER
Receiving water impaired303(D) Listed
SubwatershedJensen Lake-Snake River (HUC 170402060305)
SIC1442 – Construction Sand And Gravel

NPDES IDR05J11M: effluent limits and exceedances

GLC ROSE PIT (NPDES IDR05J11M): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 0 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended330
Selenium, total recoverable110
Nitrite Plus Nitrate Total110
Suspended Solids, Total110

NPDES IDR05J11M: inspections, violations and enforcement

NPDES IDR05J11M (GLC ROSE PIT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR05J11M

NPDES IDR05J11M: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR05J11M

NPDES IDR05J11M: 4 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.