Clean Water Act discharge permit · NPDES IDR10C0KK
THE RANAHAN @ HARRIS RANCH, Boise, ID: NPDES IDR10C0KK discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
THE RANAHAN @ HARRIS RANCH, held by Dave Evans Construction, LLC, holds NPDES permit IDR10C0KK, which discharges to Boise River. EPA’s file records it issued October 5, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for THE RANAHAN @ HARRIS RANCH: its NPDES ID, its permit type and status, its dates, its address in Boise, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C0KK.
Identity
| Facility as filed | THE RANAHAN @ HARRIS RANCH |
|---|---|
| Permittee as filed | Dave Evans Construction, LLC |
| NPDES ID | IDR10C0KK |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | October 5, 2022 |
| Expiration date | February 9, 2027 |
| Address | Boise, ID 83716 |
| Receiving water | Boise River |
| Subwatershed | Warm Springs Creek-Boise River (HUC 170501140401) |
| NAICS | 236116 – New Multifamily Housing Construction [except For-Sale Builders] |
| SIC | 1522 – Residential Construction |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C0KK.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C0KK.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C0KK.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C0KK.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C0KK.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C0KK there.
THE RANAHAN @ HARRIS RANCH, Boise, Idaho: Coverage under a general permit IDR10C0KK, held by Dave Evans Construction, LLC; Construction stormwater; Effective; issued October 5, 2022, term to February 9, 2027; discharges to Boise River; New Multifamily Housing Construction [except For-Sale Builders].
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 1,945 were issued before IDR10C0KK. Dave Evans Construction, LLC holds 2 permits in Idaho.
Other permits held by Dave Evans Construction, LLC
- MOVADO MULTI-FAMILY (DE CONSTRUCTION), Meridian: IDR10C0KL, issued 2022-10-06
Coverages issued nearest IDR10C0KK
- 2022-09-28: APEX WAREHOUSE, Twin Falls: IDR10C0K9, held by Petersen Brothers Construction
- 2022-09-29: MICRON B42, Boise: IDR10C0KA, held by Engineered Structures Inc
- 2022-09-29: MILLTOWN PARK MIXED USE, Sandpoint: IDR10C0KB, held by Baker Construction & Development Inc.
- 2022-10-03: I 84 TO FRANKLIN RD, ADA & CANYON COS, Nampa: IDR10C0KE, held by Idaho Transportation Department
- 2022-10-05: SALMON WHITEWATER PARK, Salmon: IDR10C0KJ, held by Down To Earth Excavation
- 2022-10-06: MOVADO MULTI-FAMILY (DE CONSTRUCTION), Meridian: IDR10C0KL, held by Dave Evans Construction, LLC
- 2022-10-12: CHILDCARE CENTER, Boise: IDR10C0KQ, held by Micron Technology
- 2022-10-17: IFSD #91 TIGER ATHLETIC COMPLEX PHASE 1 (D91), Idaho Falls: IDR10C0KW, held by Idaho Falls School District #91
- 2022-10-19: CIRCINAE VALLEY, Kuna: IDR10C0L0, held by Idaho B2R 53 LLC
- 2022-10-19: TRIMJOIST WEST (PETRA), Kuna: IDR10C0L1, held by Petra Inc.
THE RANAHAN @ HARRIS RANCH among its neighbors
20 discharge permits are in the Warm Springs Creek-Boise River subwatershed (HUC 170501140401); IDR10C0KK is one. Its county: 668, 5 major; IDR10C0KK is minor permit.
Other permits in the Warm Springs Creek-Boise River subwatershed (HUC 170501140401)
- ALTA HARRIS PARK, Boise: IDR10C25V, minor, term to 2027-02-09
- BARBER PARK PLAZA AND PATHWAYS, Boise: IDR100326
- BARBER PLAZA AND PATHWAY IMPROVEMENT PROJECT 2021, Boise: IDR10030N
- BARBER VALLEY DEVELOPMENT - DALLAS HARRIS ESTATES SUBDIVISION NO. 16, Boise: IDR12B400
- CASCADE, CITY OF - CASCADE WWTP, Cascade: ID0023167, minor, term to 2009-01-01
- DALLAS HARRIS ELEMENTARY, Boise: IDR10C0D4, minor, term to 2027-02-09
- DALLAS HARRIS SOUTH SUBDIVISION NO 2, Boise: IDR10039N, minor, term to 2022-02-15
- EKRT STAGING YARD, Boise: IDR10L0GP
- GLACIER SEWER EXTENSION, Boise: IDR1002VY
- HARRIS RANCH EAST SUBDIVISION, Boise: IDR10C0EC, minor, term to 2027-02-09
Nearby on the register
- Discharge permits in Boise
- Every permit record in Boise, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
Across the 561 storm water construction permits in Ada County, the violation rate on file is 0.0%. THE RANAHAN @ HARRIS RANCH sits in the Warm Springs Creek-Boise River subwatershed, which counts 20 NPDES permits. Of the 451 Ada County storm water construction permits, 92.7% were issued before this permit.