NPDES IDR10C0XO · Clean Water Act
HIGHLANDS AT BODIE CANYON, Priest River, ID: NPDES IDR10C0XO discharge permit, effluent exceedances, inspections, penalties
HIGHLANDS AT BODIE CANYON, Priest River, Idaho: General permit coverage IDR10C0XO, held by Eclipse Excavation; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Pend Oreille River.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C0XO.
Coverages issued nearest IDR10C0XO
- 2022-01-10: US-20 EXIT 343 INTERCHANGE, Saint Anthony: IDR10C0X8, held by Idaho Transportation Department
- 2022-01-10: TM CENTER SUBDIVISION NO. 2, Meridian: IDR10C0XC, held by Brighton Development
- 2022-01-10: TM CREEK SUBDIVISION NO. 7 ROADWAY AND UTILITY PROJECT, Meridian: IDR10C0XH, held by Smith Brighton, Inc.
- 2022-01-10: SL EXISTING CENTRAL UTILITY PLANT DEMOLTION, Boise: IDR10C0XI, held by Layton Construction
- 2022-01-10: GREAT WESTERN SUBDIVISION, Shelley: IDR10C0XJ, held by Knife River Corporation - Mountain West
- 2022-01-10: LUGARNO NORTH PHASE 1, Kuna: IDR10C0XP, held by TH Lost River
- 2022-01-10: E. STARVIEW DRIVE IMPROVEMENTS, Boise: IDR10C0XR, held by M3 ID Boulder Heights, LLC
- 2022-01-10: MASON CREEK LANDING SUBDIVISION NO. 3 & 4, Caldwell: IDR10C0XT, held by Mason Creek Properties, LLC
- 2022-01-10: RIVER POINTE, Middleton: IDR10C0XV, held by Matthew Gardner
- 2022-01-10: TRACTOR SUPPLY STORE, Driggs: IDR10C0XW, held by HSC Driggs, LLC
HIGHLANDS AT BODIE CANYON among its neighbors
4 discharge permits are in the Albeni Falls Dam-Pend Oreille River subwatershed (HUC 170102140405); IDR10C0XO is one. Its county: 71, 1 major; IDR10C0XO is minor permit.
Other permits in the Albeni Falls Dam-Pend Oreille River subwatershed (HUC 170102140405)
- BBTB LLC - THE COVE AT STRONG CREEK CONSTRUCTION SITE, Priest River: IDR10CD06
- MJM GRAND INC - THE COVE AT STRONG CREEK CONSTRUCTION SITE, Priest River: IDR10CD05
- PRIEST RIVER, CITY OF - PRIEST RIVER WWTP, Priest River: ID0020800, minor, term to 2007-01-05
What stands out
- Its term runs 5 years and 30 days, January 10, 2022 to February 9, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HIGHLANDS AT BODIE CANYON |
|---|---|
| Permittee | Eclipse Excavation |
| NPDES ID | IDR10C0XO |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Priest River, ID 83856 |
| Receiving water | Pend Oreille River |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Albeni Falls Dam-Pend Oreille River (HUC 170102140405) |
NPDES IDR10C0XO: effluent limits and exceedances
HIGHLANDS AT BODIE CANYON (NPDES IDR10C0XO): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C0XO: no pollutant row on file.
NPDES IDR10C0XO: inspections, violations and enforcement
NPDES IDR10C0XO (HIGHLANDS AT BODIE CANYON): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C0XO
NPDES IDR10C0XO: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C0XO
NPDES IDR10C0XO: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.