Velarion Records
Free: one email when NPDES IDR10L0B6 changes. Unsubscribe any time.

NPDES IDR10L0B6 · Clean Water Act

STALKER CREEK RESTORATION - PHASE II, Bellevue, ID: NPDES IDR10L0B6 discharge permit, effluent exceedances, inspections, penalties

STALKER CREEK RESTORATION - PHASE II, Bellevue, Idaho: General permit coverage IDR10L0B6, held by Oxbow Earthworks; Construction stormwater; Not needed.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file.

STALKER CREEK RESTORATION - PHASE II among its neighbors

3 discharge permits are in the Upper Silver Creek subwatershed (HUC 170402210502); IDR10L0B6 is one.

Other permits in the Upper Silver Creek subwatershed (HUC 170402210502)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 4,607 discharge permits on the register in Idaho; 3,631 of them (79%) are in its program, Construction stormwater.

Identity

FacilitySTALKER CREEK RESTORATION - PHASE II
PermitteeOxbow Earthworks
NPDES IDIDR10L0B6
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressBellevue, ID 83313
Receiving water impaired303(D) Listed
SubwatershedUpper Silver Creek (HUC 170402210502)

NPDES IDR10L0B6: effluent limits and exceedances

STALKER CREEK RESTORATION - PHASE II (NPDES IDR10L0B6): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10L0B6: no pollutant row on file.

NPDES IDR10L0B6: inspections, violations and enforcement

NPDES IDR10L0B6 (STALKER CREEK RESTORATION - PHASE II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10L0B6

NPDES IDR10L0B6: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10L0B6

NPDES IDR10L0B6: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.