NPDES INR10K168 · Clean Water Act
I 69 SECTION 5, FULLERTON PIKE REALIGNMENT AND INTERCHANGE, WALNUT STREET ACCES, Bloomington, IN: NPDES INR10K168 discharge permit, effluent exceedances, inspections, penalties
I 69 SECTION 5, FULLERTON PIKE REALIGNMENT AND INTERCHANGE, WALNUT STREET ACCES, Bloomington, Indiana: Individual permit INR10K168, held by I 69 Section 5, Fullerton Pike Realignment and Interchange, Walnut Street Acces; Construction stormwater; Effective; issued May 29, 2015, term to May 27, 2020, by IDEM.
Indiana holds 1,542 Construction stormwater coverages of this permit type in EPA’s file; 20 were issued before INR10K168.
Coverages issued nearest INR10K168
- 2015-05-17: INTERSTATE 69 SECTION 5, DU 5B MAINLINE (STATIONS 916-995, 1075-1032, 1275-1331, Martinsville: INR10K093, held by Interstate 69 Section 5, DU 5B Mainline (Stations 916-995, 1075-1032, 1275-1331
- 2015-05-19: INDOT GREENE CR 100 W OVER INTERSTATE 69, Newberry: INR10C108, held by INDOT Greene CR 100 W Over Interstate 69
- 2015-05-20: INDOT DAVIESS CR 1200 N OVER I-69, Elnora: INR10C124, held by INDOT Daviess CR 1200 N Over I-69
- 2015-05-22: LANDSLIDE CORRECTION ALONG SR 66 DES NO 1173286, Grandview: INR10K053, held by Landslide Correction along SR 66 Des No 1173286
- 2015-05-28: INDOT DES 0800285 PACKAGE 4, SECTION 1, I-69 INDY TO EVANSVILLE, Elberfeld: INR10C156, held by INDOT DES 0800285 Package 4, Section 1, I-69 Indy to Evansville
- 2015-05-29: I69 SECTION 5, DU 3A- VERNAL PIKE, OVERPASS STRUCTURE AND ASSOCIATED ROADS DES, Bloomington: INR10K170, held by I69 Section 5, DU 3A- Vernal Pike, Overpass Structure and Associated Roads DES
- 2015-06-05: INTERSTATE 69 SECTION 5, KINSER PIKE ROAD OVERPASS AND REALIGNMENT, Bloomington: INR10K206, held by Interstate 69 Section 5, Kinser Pike Road Overpass and Realignment
- 2015-06-27: GRANNAN GROVE, Carmel: INR10K354, held by Grannan Grove
- 2015-07-09: U.S. 52 BRIDGE REPLACEMENT OVER THE WABASH RIVER (DES 0400774), Lafayette: INR10K404, held by U.S. 52 Bridge Replacement over the Wabash River (Des 0400774)
- 2015-07-18: INDOT DES #0902174 NEW I-69, CONTRACT IR-33047A PHASE 1A, Washington: INR10C743, held by INDOT Des #0902174 New I-69, Contract IR-33047A Phase 1A
I 69 SECTION 5, FULLERTON PIKE REALIGNMENT AND INTERCHANGE, WALNUT STREET ACCES among its neighbors
39 discharge permits are in the May Creek-Clear Creek subwatershed (HUC 051202080802); INR10K168 is one. Its county: 81, 3 major; INR10K168 is minor permit.
Other permits in the May Creek-Clear Creek subwatershed (HUC 051202080802)
- 16 FULLERTON TO NEEDMORE PRESSURE TEST AND RETROFIT, Bloomington: INRA15138, minor, term to 2029-12-09
- 8056 VICTOR PIKE NEW CONSTRUCTION, Bloomington: INRA15240, minor, term to 2030-01-08
- BARBERRY KETCHAM RIDGE LOT 29, Bloomington: INRA13614, minor, term to 2029-04-03
- BISHOP-COGET NEW HOME BUILD, Bloomington: INRA13185, minor, term to 2029-01-23
- BLOOMINGTON S (DILLMAN ROAD), Bloomington: INL035718, minor, term to 2025-12-31
- BRACKEMYRE HOME BUILD, Bloomington: INRA10503, minor, term to 2027-09-11
- ELLINGTON, Bloomington: INRA12897, minor, term to 2028-11-27
- HOOSIER TRANSFER STATION, Bloomington: INRM01182, minor, term to 2024-09-12
- I-69 PROJECT NO. 1006075- EROSION CONTROL FOR DURING AND POST CONSTRUCTION, Bloomington: INR10G665, minor, term to 2018-05-20
- INDIANA LIMESTONE ACQUISITION LLC DBA INDIANA LIMESTONE CO INC CENTRAL, Bloomington: ING490094, minor, term to 2025-09-30
What stands out
- Its term runs 4 years and 364 days, May 29, 2015 to May 27, 2020; the term ended 2,331 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,164 discharge permits on the register in Indiana; 9,355 of them (71%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | I 69 SECTION 5, FULLERTON PIKE REALIGNMENT AND INTERCHANGE, WALNUT STREET ACCES |
|---|---|
| Permittee | I 69 Section 5, Fullerton Pike Realignment and Interchange, Walnut Street Acces |
| NPDES ID | INR10K168 |
| Status | Effective |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 29, 2015 |
| Expires | May 27, 2020 |
| Agency | IDEM |
| Address | Bloomington, IN 47403 |
| Subwatershed | May Creek-Clear Creek (HUC 051202080802) |
NPDES INR10K168: effluent limits and exceedances
I 69 SECTION 5, FULLERTON PIKE REALIGNMENT AND INTERCHANGE, WALNUT STREET ACCES (NPDES INR10K168): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES INR10K168: no pollutant row on file.
NPDES INR10K168: inspections, violations and enforcement
NPDES INR10K168 (I 69 SECTION 5, FULLERTON PIKE REALIGNMENT AND INTERCHANGE, WALNUT STREET ACCES): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES INR10K168
NPDES INR10K168: one email when its EPA record changes — $99/month.
Permits near NPDES INR10K168
NPDES INR10K168: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.