NPDES KYR10T415 · Clean Water Act
STALLARD SPRINGS NORTH PHASE 2A, Shelbyville, KY: NPDES KYR10T415 discharge permit, effluent exceedances, inspections, penalties
STALLARD SPRINGS NORTH PHASE 2A, Shelbyville, Kentucky: General permit coverage KYR10T415, held by Stallard Springs North Phase 2A; Construction stormwater; Effective; issued May 1, 2025, term to December 31, 2029, by KY DEP; discharges to Tick Creek.
- September 14, 2026: Permit Violations - Violation Specified in Comment (ST6).
- September 14, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
- September 14, 2026: Evaluation (S).
- May 28, 2025: WW Storm Water Construction - Narrative effluent violation (ST6).
- May 28, 2025: Permit Violations - Violation Specified in Comment (ST6).
- May 28, 2025: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
- May 28, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
- May 28, 2025: Effluent Violations - Narrative Effluent Violation (ST6).
Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 386 were issued before KYR10T415.
Coverages issued nearest KYR10T415
- 2025-05-01: EIGHTY EIGHT, Glasgow: KYR10T396, held by Eighty Eight
- 2025-05-01: ANDOVER TOWNHOMES, Lexington: KYR10T404, held by Andover Townhomes
- 2025-05-01: KYTC PROJECT: ITEM 3-940.00, Bowling Green: KYR10T405, held by KYTC Project: Item 3-940.00
- 2025-05-01: CONSTRUCTION OF 3 MEGA BARNS, COMPOST SHED, ADDITION OF MOBILE HOME AND UTILITES, Scottsville: KYR10T412
- 2025-05-01: FRANKLIN SHOPPES PHASE 3, Franklin: KYR10T413, held by Franklin Shoppes Phase 3
- 2025-05-01: THE MAXWELL, Lexington: KYR10T416, held by The Maxwell
- 2025-05-02: INGERSOLL RAND WAREHOUSE EXPANSION, Campbellsville: KYR10T406, held by Ingersoll Rand Warehouse Expansion
- 2025-05-02: JOSEPH WATT POULTRY BARNS, Bowling Green: KYR10T414, held by Joseph Watt Poultry Barns
- 2025-05-02: PATCHEN WILKES UNIT 1, PHASE 2 AND UNIT 2A, Lexington: KYR10T423, held by Patchen Wilkes Unit 1, Phase 2 and Unit 2A
- 2025-05-02: HOUGHMAN PROPERTY 972 ENTERPRISE COURT ( LOT 9 ), Lexington: KYR10T424, held by Houghman Property 972 Enterprise Court ( Lot 9 )
STALLARD SPRINGS NORTH PHASE 2A among its neighbors
2 discharge permits are in the Upper Guist Creek subwatershed (HUC 051401020501); KYR10T415 is one. Its county: 139, 1 major; KYR10T415 is minor permit.
Other permits in the Upper Guist Creek subwatershed (HUC 051401020501)
- DIAGEO AMERICAS SUPPLY INC, Shelbyville: KYR004206, minor, term to 2023-07-31
Identity
| Facility | STALLARD SPRINGS NORTH PHASE 2A |
|---|---|
| Permittee | Stallard Springs North Phase 2A |
| NPDES ID | KYR10T415 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 1, 2025 |
| Expires | December 31, 2029 |
| Agency | KY DEP |
| Address | Shelbyville, KY 40065 |
| Receiving water | Tick Creek |
| Subwatershed | Upper Guist Creek (HUC 051401020501) |
NPDES KYR10T415: effluent limits and exceedances
STALLARD SPRINGS NORTH PHASE 2A (NPDES KYR10T415): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES KYR10T415: no pollutant row on file.
NPDES KYR10T415: inspections, violations and enforcement
NPDES KYR10T415: 7 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| September 14, 2026 | Permit Violations - Violation Specified in Comment | ST6 |
| September 14, 2026 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
| May 28, 2025 | WW Storm Water Construction - Narrative effluent violation | ST6 |
| May 28, 2025 | Permit Violations - Violation Specified in Comment | ST6 |
| May 28, 2025 | WW Storm Water Construction - Failure to Implement SWPPP/SWMP | ST6 |
| May 28, 2025 | WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP | ST6 |
| May 28, 2025 | Effluent Violations - Narrative Effluent Violation | ST6 |
NPDES KYR10T415: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 14, 2026 | Evaluation | S |
NPDES KYR10T415 (STALLARD SPRINGS NORTH PHASE 2A): no formal enforcement action and informal enforcement action on file.
Watch NPDES KYR10T415
NPDES KYR10T415: one email when its EPA record changes — $99/month.
Permits near NPDES KYR10T415
NPDES KYR10T415: 0 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.