Velarion Records
Free: one email when NPDES KYR10T415 changes. Unsubscribe any time.

NPDES KYR10T415 · Clean Water Act

STALLARD SPRINGS NORTH PHASE 2A, Shelbyville, KY: NPDES KYR10T415 discharge permit, effluent exceedances, inspections, penalties

STALLARD SPRINGS NORTH PHASE 2A, Shelbyville, Kentucky: General permit coverage KYR10T415, held by Stallard Springs North Phase 2A; Construction stormwater; Effective; issued May 1, 2025, term to December 31, 2029, by KY DEP; discharges to Tick Creek.

  • September 14, 2026: Permit Violations - Violation Specified in Comment (ST6).
  • September 14, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
  • September 14, 2026: Evaluation (S).
  • May 28, 2025: WW Storm Water Construction - Narrative effluent violation (ST6).
  • May 28, 2025: Permit Violations - Violation Specified in Comment (ST6).
  • May 28, 2025: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
  • May 28, 2025: WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMP (ST6).
  • May 28, 2025: Effluent Violations - Narrative Effluent Violation (ST6).

Kentucky holds 1,852 Construction stormwater coverages of this permit type in EPA’s file; 386 were issued before KYR10T415.

Coverages issued nearest KYR10T415

STALLARD SPRINGS NORTH PHASE 2A among its neighbors

2 discharge permits are in the Upper Guist Creek subwatershed (HUC 051401020501); KYR10T415 is one. Its county: 139, 1 major; KYR10T415 is minor permit.

Other permits in the Upper Guist Creek subwatershed (HUC 051401020501)

Identity

FacilitySTALLARD SPRINGS NORTH PHASE 2A
PermitteeStallard Springs North Phase 2A
NPDES IDKYR10T415
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedMay 1, 2025
ExpiresDecember 31, 2029
AgencyKY DEP
AddressShelbyville, KY 40065
Receiving waterTick Creek
SubwatershedUpper Guist Creek (HUC 051401020501)

NPDES KYR10T415: effluent limits and exceedances

STALLARD SPRINGS NORTH PHASE 2A (NPDES KYR10T415): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES KYR10T415: no pollutant row on file.

NPDES KYR10T415: inspections, violations and enforcement

NPDES KYR10T415: 7 single-event violations

DateWhat EPA recordedAgency
September 14, 2026Permit Violations - Violation Specified in CommentST6
September 14, 2026Failure to properly install, initiate, or fully implement construction stormwater controlsST6
May 28, 2025WW Storm Water Construction - Narrative effluent violationST6
May 28, 2025Permit Violations - Violation Specified in CommentST6
May 28, 2025WW Storm Water Construction - Failure to Implement SWPPP/SWMPST6
May 28, 2025WW Storm Water Construction - Failure to develop any or adequate SWPPP/SWMPST6
May 28, 2025Effluent Violations - Narrative Effluent ViolationST6

NPDES KYR10T415: 1 inspection

DateWhat EPA recordedAgency
September 14, 2026EvaluationS

NPDES KYR10T415 (STALLARD SPRINGS NORTH PHASE 2A): no formal enforcement action and informal enforcement action on file.

Watch NPDES KYR10T415

NPDES KYR10T415: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES KYR10T415

NPDES KYR10T415: 0 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.