NPDES MAR1003O3 · Clean Water Act
INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE), Haverhil, MA: NPDES MAR1003O3 discharge permit, effluent exceedances, inspections, penalties
INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE), Haverhil, Massachusetts: General permit coverage MAR1003O3, held by Newport Construction Corporation; Construction stormwater; Administratively continued; issued February 14, 2022, term to February 15, 2022, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 529 were issued before MAR1003O3. Newport Construction Corporation holds 15 permits in Massachusetts.
Other permits held by Newport Construction Corporation
- INMAN SQUARE INTERSECTION SAFETY IMPROVEMENTS, Cambridge: MAR1002B2, issued 2019-10-15
- INTERSECTION IMPROVEMENTS AND RELATED WORK AT 2 LOCATIONS ALONG MORTON STREET, Boston: MAR1002S6, issued 2020-08-17
- SOUTHAMPTON PARKING EXPANSION PROJECT, Boston: MAR1003V0, issued 2022-05-02
- RECONSTRUCTION OF HIGHLAND AVE. AND CHAPMAN ST., Watertown: MAR1004IW, issued 2023-03-14
- 2023 ARSENAL STREET CORRIDOR IMPROVEMENTS, Watertown: MAR1004K0, issued 2023-04-03
- ARSENAL STREET CORRIDOR WOOLEY AVENUE TO ARSENAL COURT, Watertown: MAR1004MT, issued 2023-05-24
- RESURFACING AND RELATED WORK ON ROUTE 114, Danvers: MAR1004R0, issued 2023-08-10
- MOUNTAIN FARMS, Hadley: MAR1004SH, issued 2023-09-01
- RECONSTRUCTION OF ROUTE 1 (LAFAYETTE ROAD), Salisbury: MAR1004YV, issued 2023-12-28
- REHABILITATION OF MOUNT AUBURN STREET (ROUTE 16), Watertown: MAR10057I, issued 2024-05-16
Coverages issued nearest MAR1003O3
- 2022-02-07: GODDARD SCHOOL - 193 CENTRAL AVENUE, Milton: MAR1003PY, held by Acella Construction
- 2022-02-08: LEASE PARCEL A-BARNES REGIONAL AIRPORT-AIRPORT ROAD, Westfield: MAR1003PZ, held by J.L. Raymaakers & Sons, Inc.
- 2022-02-08: BRIDGE REPLACEMENT BR. NO. R-04-004 ON REED STREET - REHOBOTH, MA, Rehoboth: MAR1003Q1, held by Tully Construction Corp.
- 2022-02-09: FISH ROAD RECLAMATION PROJECT, Dudley: MAR1003Q2, held by Rampco Construction Co. Inc.
- 2022-02-10: DYER STREET, Rockland: MAR1003Q4, held by Gaspar Investment, Inc.
- 2022-02-14: CAPE COD LUMBER EXPANSION, Abington: MAR1003Q6, held by Industrial Building Group, LLC.
- 2022-02-14: LOVELL ACADEMY, Rockland: MAR1003Q8, held by Integrated Builders, Inc.
- 2022-02-14: SWANSEA MALL REDEVELOPMENT PROJECT - PHASE 2, Swansea: MAR1003QF, held by Brady Sullivan Properties, LLC
- 2022-02-14: J MCKINNON HEADQUARTERS, Plympton: MAR1003QG, held by J McKinnon Company, Inc.
- 2022-02-14: 1165R MASS AVE RESIDENTIAL DEVELOPMENT, Arlington: MAR1003QJ, held by Spaulding and Slye Investments
INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE) among its neighbors
44 discharge permits are in the East Meadow River-Merrimack River subwatershed (HUC 010700061404); MAR1003O3 is one.
Other permits in the East Meadow River-Merrimack River subwatershed (HUC 010700061404)
- 12, 14 & 24 SOUTH HUNT ROAD, Amesbury: MAR1004RO, minor, term to 2027-02-16
- 141 SOUTH MAIN STREET, NEWTON, NH, Newton: NHR1000OK, minor, term to 2022-02-15
- 163 ELM STREET, Salisbury: MAR1004TR, minor, term to 2027-02-16
- 201 ELM STREET, Salisbury: MAR10046K, minor, term to 2027-02-16
- 51 EAST MAIN STREET, Merrimac: MAR10056W, minor, term to 2027-02-16
- 66 ELM STREET, Salisbury: MAR1004MX, minor, term to 2027-02-16
- AMESBURY SPORTS PARK, Amesbury: MAR10041U, minor, term to 2027-02-16
- AMESBURY TRUTH, Amesbury: MANOE3885, minor, term to 2021-07-15
- AMESBURY W W T P, Amesbury: MA0101745, major, term to 2009-03-31
- AMESBURY W W T P, Amesbury: MAG590034, minor, term to 2027-10-31
What stands out
- Its term runs 1 day, February 14, 2022 to February 15, 2022; the term ended 1,673 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE) |
|---|---|
| Permittee | Newport Construction Corporation |
| NPDES ID | MAR1003O3 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | February 14, 2022 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Haverhil, MA 01832 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | East Meadow River-Merrimack River (HUC 010700061404) |
NPDES MAR1003O3: effluent limits and exceedances
INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE) (NPDES MAR1003O3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1003O3: no pollutant row on file.
NPDES MAR1003O3: inspections, violations and enforcement
NPDES MAR1003O3 (INTERSECTION RECONSTRUCTION ON ROUTE 108 AT ROUTE 110 (KENOZA AVE)): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1003O3
NPDES MAR1003O3: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1003O3
NPDES MAR1003O3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.