NPDES MAR1004A3 · Clean Water Act
J162-2 AND J162A TO L'ENERGIA-OPGW & ACR, Tewksbury And Lowell, MA: NPDES MAR1004A3 discharge permit, effluent exceedances, inspections, penalties
J162-2 AND J162A TO L'ENERGIA-OPGW & ACR, Tewksbury And Lowell, Massachusetts: General permit coverage MAR1004A3, held by Harlan Electric; Construction stormwater; Effective; issued October 5, 2022, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 983 were issued before MAR1004A3.
Coverages issued nearest MAR1004A3
- 2022-09-30: ACUSHNET SOLAR (#02627), Acushnet: MAR10049R, held by Nexamp, Inc.
- 2022-09-30: LEXINGTON POLICE HEADQUARTERS, Lexington: MAR10049V, held by CTA Construction Managers, LLC
- 2022-10-04: TAUNTON ROUTE 24 OVER ROUTE 140 BRIDGE REPLACEMENT, Taunton: MAR10049X, held by Massachusetts Department of Transportation
- 2022-10-04: 136 LONGWATER DRIVE, Norwell: MAR10049Z, held by ATL Construction, Inc.
- 2022-10-05: 904 PINE STREET, Raynham: MAR1004A0, held by RYCO Excavating Contractor, Inc.
- 2022-10-06: CARVER TO KINGSTON RELIABILITY PROJECT, Carver: MAR1004A4, held by Richard Maguire
- 2022-10-06: NEWTON FREE LIBRARY PARKING, Newton: MAR1004A5, held by AR Belli Inc.
- 2022-10-07: DEEP BROOK ESTATES, Acushnet: MAR1004A8, held by Jose S. Castelo
- 2022-10-07: PROVINCETOWN WWTF PHASE 5, Provincetown: MAR1004A9, held by AECOM Technical Services, Inc.
- 2022-10-07: RIVER STREET INFRASTRUCTURE AND STREETSCAPE IMPROVEMENTS, Cambridge: MAR1004AA, held by P. Gioioso & Sons, Inc.
J162-2 AND J162A TO L'ENERGIA-OPGW & ACR among its neighbors
51 discharge permits are in the Mill Brook-Concord River subwatershed (HUC 010700050206); MAR1004A3 is one.
Other permits in the Mill Brook-Concord River subwatershed (HUC 010700050206)
- 161 CONCORD ROAD, Billerica: MAR1006BH, minor, term to 2027-02-16
- 305 CONCORD RD BILLERICA MA, Billerica: MAR1002PA, minor, term to 2022-02-15
- 37 MANNING ROAD, BILLERICA, MA, Billerica: MANOEJ0FW, minor, term to 2031-02-12
- 600 WOBURN STREET, Tewksbury: MAR1002SS, minor, term to 2022-02-15
- ASMPT AEI, INC., North Billerica: MANOEJ0F8, minor, term to 2030-06-10
- BEDFORD SALT SHED REPLACEMENT, Bedford: MAR10068P, minor, term to 2027-02-16
- BILLERICA RECREATION CENTER, Billerica: MAR1005T6, minor, term to 2027-02-16
- BILLERICA W W T P, Billerica: MA0101711, major, term to 2019-06-30
- BILLERICA W W T P, Billerica: MAL101711, minor, term to 2025-12-31
- BIRCH FARM, Carlisle: MAR10018O, minor, term to 2022-02-15
Identity
| Facility | J162-2 AND J162A TO L'ENERGIA-OPGW & ACR |
|---|---|
| Permittee | Harlan Electric |
| NPDES ID | MAR1004A3 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 5, 2022 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Tewksbury And Lowell, MA 01876 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mill Brook-Concord River (HUC 010700050206) |
NPDES MAR1004A3: effluent limits and exceedances
J162-2 AND J162A TO L'ENERGIA-OPGW & ACR (NPDES MAR1004A3): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1004A3: no pollutant row on file.
NPDES MAR1004A3: inspections, violations and enforcement
NPDES MAR1004A3 (J162-2 AND J162A TO L'ENERGIA-OPGW & ACR): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1004A3
NPDES MAR1004A3: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1004A3
NPDES MAR1004A3: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.