NPDES MAR1004J0 · Clean Water Act
HARVARD ERC PHASE A - RESIDENTIAL BUILDING, Allston, MA: NPDES MAR1004J0 discharge permit, effluent exceedances, inspections, penalties
HARVARD ERC PHASE A - RESIDENTIAL BUILDING, Allston, Massachusetts: General permit coverage MAR1004J0, held by Allston Phase A Residential Owner L.L.C. C/O Breakthrough Properties L.L.C.; Construction stormwater; Effective; issued March 15, 2023, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 1,198 were issued before MAR1004J0.
Coverages issued nearest MAR1004J0
- 2023-03-13: WINCHENDON SOLAR, Winchendon: MAR1004IU, held by Ecos Energy LLC
- 2023-03-13: TOLL BROTHERS AT THE PINEHILLS, Plymouth: MAR1004IV, held by Toll Bros., Inc.
- 2023-03-14: RECONSTRUCTION OF HIGHLAND AVE. AND CHAPMAN ST., Watertown: MAR1004IW, held by Newport Construction Corporation
- 2023-03-14: 0172425.30 AQUA LINE: SHREWSBURY, MA - TOBLIN HILL DR. BRIDGE, Shrewsbury: MAR1004IY, held by Aqua Line Utility, Inc
- 2023-03-15: HARVARD ERC PHASE A - HOTEL BUILDING, Allston: MAR1004IZ, held by Allston Phase A Hotel Owner L.L.C. C/O Breakthrough Properties L.L.C.
- 2023-03-15: INTERSECTION IMPROVEMENTS AND RELATED WORK ROUTE 1 AND ROUTE 1A AT ROUTE 123, Attleboro: MAR1004J2, held by R M Pacella, Inc.
- 2023-03-15: AMHERST COLLEGE STUDENT CENTER, Amherst: MAR1004J4, held by Thomas Munson
- 2023-03-16: STAGE FORT ACCESSIBILITY IMPROVEMENTS, Gloucester: MAR1004J5, held by Edward Paige Corporation
- 2023-03-17: PAULINE'S PATH SUBDIVISION, Lakeville: MAR1004J8, held by L & B Realty Trust
- 2023-03-17: WHITING STREET RESERVOIR DAM IMPROVEMENT PROJECT, Holyoke: MAR1004J9, held by T Ford Company, Inc.
HARVARD ERC PHASE A - RESIDENTIAL BUILDING among its neighbors
384 discharge permits are in the Charles River-Frontal Boston Harbor subwatershed (HUC 010900010704); MAR1004J0 is one.
Other permits in the Charles River-Frontal Boston Harbor subwatershed (HUC 010900010704)
- 100 NORTHERN AVENUE, Boston: MAG912127, minor, term to 2027-08-01
- 101 HAMPDEN STREET, Boston: MAR1003TB, minor, term to 2027-02-16
- 104 MAIN STREET, Watertown: MAG912191, minor, term to 2027-08-01
- 104 MAIN STREET, Watertown: MAR1005BZ, minor, term to 2027-02-16
- 121 - 139 FIRST STREET, Cambridge: MAG070443, minor, term to 2020-05-19
- 127 AMORY ST REDEVELOPMENT PROJECT, Boston: MAR1005O4, minor, term to 2027-02-16
- 127 AMORY STREET, Boston: MAR1005RC, minor, term to 2027-02-16
- 1270 COMMONWEALTH AVE, Allston: MAR1005P0, minor, term to 2027-02-16
- 136 SHAWMUT AVENUE, Boston: MAG070409, minor, term to 2020-05-19
- 14 WEST BROADWAY, Boston: MAG070411, minor, term to 2020-05-19
Identity
| Facility | HARVARD ERC PHASE A - RESIDENTIAL BUILDING |
|---|---|
| Permittee | Allston Phase A Residential Owner L.L.C. C/O Breakthrough Properties L.L.C. |
| NPDES ID | MAR1004J0 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 15, 2023 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Allston, MA 02134 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Charles River-Frontal Boston Harbor (HUC 010900010704) |
NPDES MAR1004J0: effluent limits and exceedances
HARVARD ERC PHASE A - RESIDENTIAL BUILDING (NPDES MAR1004J0): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1004J0: no pollutant row on file.
NPDES MAR1004J0: inspections, violations and enforcement
NPDES MAR1004J0 (HARVARD ERC PHASE A - RESIDENTIAL BUILDING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1004J0
NPDES MAR1004J0: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1004J0
NPDES MAR1004J0: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.