NPDES MAR1005H0 · Clean Water Act
SMITH COLLEGE CENTRAL PHASE ENERGY PLANT AND GEOWELL FIELDS PROJECT, Northampton, MA: NPDES MAR1005H0 discharge permit, effluent exceedances, inspections, penalties
SMITH COLLEGE CENTRAL PHASE ENERGY PLANT AND GEOWELL FIELDS PROJECT, Northampton, Massachusetts: General permit coverage MAR1005H0, held by T&M Equipment Corporation; Construction stormwater; Effective; issued November 21, 2024, term to February 16, 2027, by U.S. EPA.
Massachusetts holds 3,320 Construction stormwater coverages of this permit type in EPA’s file; 2,101 were issued before MAR1005H0. T&M Equipment Corporation holds 12 permits in Massachusetts.
Other permits held by T&M Equipment Corporation
- CITY OF WESTFIELD CLEARWELL AND BACKWASH PUMPING STATION PROJECT, Westfield: MAR1003G7, issued 2021-08-17
- GREENFIELD PUBLIC LIBRARY, Greenfield: MAR1003KV, issued 2021-10-28
- SPRINGFIELD COLLEGE PARKING RELOCATION AND HEALTH SCIENCES CENTER PROJECT, Springfield: MAR1003NC, issued 2021-12-10
- TOWN OF SPENCER WASTEWATER TREATMENT PLANT UPGRADE PROJECT, Spencer: MAR100485, issued 2022-09-08
- SMITH COLLEGE QUADRANGLE DISTRICT CAMPUS UTILITIES, Northampton: MAR1004N8, issued 2023-05-30
- SMITH COLLEGE CENTRAL DISTRICT CAMPUS UTILITIES PROJECT, Northampton: MAR100563, issued 2024-04-24
- UMASS SCHOOL OF PUBLIC HEALTH, Amherst: MAR10057P, issued 2024-05-21
- UMASS AMHERST NORTH ENERGY EXCHANGE CENTER, Amherst: MAR1005HG, issued 2024-11-28
- AGAWAM HIGH SCHOOL, Agawam: MAR1005OZ, issued 2025-04-17
- GIBBS RENOVATION FOR EAGLEBROOK SCHOOL, Deerfield: MAR1006D8, issued 2026-06-18
Coverages issued nearest MAR1005H0
- 2024-11-19: WHISTLE STOP FARM - PHASE II, Westford: MAR1005GV, held by Seal Harbor, LLC
- 2024-11-19: 155 BAY ROAD BELCHERTOWN, Belchertown: MAR1005GW, held by UFP Real Estate LLC
- 2024-11-20: MPMGR, Lancaster: MAR1005GX, held by Manafort Brothers Inc.
- 2024-11-21: MCPHERSON YOUTH CENTER, Beverly: MAR1005GY, held by BC Construction Co.
- 2024-11-21: MASS DEPOT STREET BRIDGE, SUTTON & GRAFTON, Sutton: MAR1005GZ, held by MAS Building & Bridge, Inc.
- 2024-11-21: HERB CHAMBERS TOYOTA OF BOSTON, Medford: MAR1005H1, held by CM&B
- 2024-11-21: CONGREGATION OF MARIAN FATHERS OF THE IMMACULATE CONCEPTION OF THE B.V.M., INC., Stockbridge: MAR1005H2, held by Wm J. Keller & Sons Construction Corp.
- 2024-11-22: 191 CHELMSFORD STREET, Chelmsford: MAR1005H3, held by Nilsson Consultant Services, Inc.
- 2024-11-26: NORTHERN BANK TOWN COMMON, Littleton: MAR1005H6, held by Kenco Development, LLC
- 2024-11-26: 887 WOBURN, Wilmington: MAR1005H8, held by 887 Woburn, LLC
SMITH COLLEGE CENTRAL PHASE ENERGY PLANT AND GEOWELL FIELDS PROJECT among its neighbors
25 discharge permits are in the Mill River subwatershed (HUC 010802010606); MAR1005H0 is one.
Other permits in the Mill River subwatershed (HUC 010802010606)
- #2021 WARNER BROS: NORTHAMPTON, MA - RECLAIM STREET PAVING, Northampton: MAR1003EQ, minor, term to 2022-02-15
- 23 LAUREL STREET, NORTHAMPTON, MA, Northampton: MAR100550, minor, term to 2027-02-16
- 608413-128993 NORTHAMPTON ROCKY HILL GREENWAY, Northampton: MAR1005OU, minor, term to 2027-02-16
- BERKSHIRE ELECTRIC CABLE CO., Leeds: MA0032832
- BI-QEM INC., Northampton: MANOEJ0FE, minor, term to 2030-08-29
- BI-QEM INC., Florence: MAR05J02L, minor, term to 2020-06-03
- C128993 JL CONSTRUCTION CORP: NORTHAMPTON, MA - ROCKY HILL GREENWAY MU TRAIL, Northampton: MAR1005OK, minor, term to 2027-02-16
- CHEMIPLASTICA (BI-QEM), Florence: MAG250960, minor, term to 2013-07-31
- CHEMIPLASTICA, INC., Northampton: MAR053290, minor, term to 2020-06-03
- CUTLERY, Northampton: MAR1003SF, minor, term to 2027-02-16
What stands out
- Its term runs 2 years and 87 days, November 21, 2024 to February 16, 2027.
- No dated event in the 365 days to October 14, 2026.
- It is one of 6,154 discharge permits on the register in Massachusetts; 3,324 of them (54%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SMITH COLLEGE CENTRAL PHASE ENERGY PLANT AND GEOWELL FIELDS PROJECT |
|---|---|
| Permittee | T&M Equipment Corporation |
| NPDES ID | MAR1005H0 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 21, 2024 |
| Expires | February 16, 2027 |
| Agency | U.S. EPA |
| Address | Northampton, MA 01063 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mill River (HUC 010802010606) |
NPDES MAR1005H0: effluent limits and exceedances
SMITH COLLEGE CENTRAL PHASE ENERGY PLANT AND GEOWELL FIELDS PROJECT (NPDES MAR1005H0): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES MAR1005H0: no pollutant row on file.
NPDES MAR1005H0: inspections, violations and enforcement
NPDES MAR1005H0 (SMITH COLLEGE CENTRAL PHASE ENERGY PLANT AND GEOWELL FIELDS PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES MAR1005H0
NPDES MAR1005H0: one email when its EPA record changes — $99/month.
Permits near NPDES MAR1005H0
NPDES MAR1005H0: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.