Velarion Records
Free: one email when NPDES OH0054526 changes. Unsubscribe any time.

NPDES OH0054526 · Clean Water Act

GREEN MEADOWS MHP, London, OH: NPDES OH0054526 discharge permit, effluent exceedances, inspections, penalties

GREEN MEADOWS MHP, London, Ohio: Individual permit OH0054526, held by Moore Enterprises - Green Meadows MHP; Administratively continued; issued February 9, 2021, term to February 28, 2026; discharges to Spring Fork Creek.

6 of the 13 pollutants listed for NPDES OH0054526 have no violation or effluent exceedance.

  • Phosphorus, total [as P]: 4 limits, 110 violations of any kind, 110 effluent exceedances, latest July 31, 2026, largest 339% over the limit.
  • Nitrogen, ammonia total [as N]: 8 limits, 51 violations of any kind, 51 effluent exceedances, latest July 31, 2026, largest 1,408% over the limit.
  • Oxygen, dissolved [DO]: 1 limit, 47 violations of any kind, 47 effluent exceedances, latest August 31, 2025, largest 83% over the limit.
  • Solids, total suspended: 4 limits, 21 violations of any kind, 21 effluent exceedances, latest November 30, 2025, largest 424% over the limit.
  • BOD, carbonaceous [5 day, 20 C]: 4 limits, 18 violations of any kind, 18 effluent exceedances, latest November 30, 2025, largest 248% over the limit.
  • E. coli, MTEC-MF: 2 limits, 13 violations of any kind, 13 effluent exceedances, latest July 31, 2026, largest 99,999% over the limit.
  • pH: 2 limits, 3 violations of any kind, 3 effluent exceedances, latest October 31, 2017.
  • Temperature, water deg. centigrade: 2 limits.
  • Nitrite + Nitrate total [as N]: 2 limits.
  • Turbidity [severity]: 2 limits.
  • Flow, in conduit or thru treatment plant: 2 limits.
  • Biosolids weight indluding admixtures: 2 limits.
  • Sludge waste from secondary clarifiers: 2 limits.
  • April 7, 2021: WW SSO - Improper Operation and Maintenance (ST6).
  • April 7, 2021: Effluent Violations - Unapproved Bypass (ST6).
  • April 7, 2021: Management Practice Violations - Inflow/Infiltration (I/I) (ST6).

GREEN MEADOWS MHP among its neighbors

2 discharge permits are in the Spring Fork subwatershed (HUC 050600012004); OH0054526 is one. Its county: 22, 0 major; OH0054526 is minor permit.

Other permits in the Spring Fork subwatershed (HUC 050600012004)

What stands out

  • Its term runs 5 years and 19 days, February 9, 2021 to February 28, 2026; the term ended 228 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is a single-event violation on April 7, 2021, 2,016 days before EPA's file was loaded.
  • No dated event in the 365 days to October 14, 2026.
  • EPA's file dates 3 events for it, all in 2021.
  • 7 of its 13 pollutants on file have an effluent exceedance (54%); 13 are under a numeric limit; the largest exceedance is E. coli, MTEC-MF at 99,999% over its limit.
  • It is one of 2,882 discharge permits on the register in Ohio; the file names no program for it, and it is a minor discharger.

Identity

FacilityGREEN MEADOWS MHP
PermitteeMoore Enterprises - Green Meadows MHP
NPDES IDOH0054526
StatusAdministratively continued
TypeIndividual permit
ClassMinor
Facility typeNon-POTW
IssuedFebruary 9, 2021
ExpiresFebruary 28, 2026
AddressLondon, OH 43140
Receiving waterSpring Fork Creek
Receiving water impaired303(D) Listed
SubwatershedSpring Fork (HUC 050600012004)
SIC4952 – Sewerage Systems

NPDES OH0054526: effluent limits and exceedances

GREEN MEADOWS MHP (NPDES OH0054526): 13 pollutants on file, 13 limited; 7 with a violation of any kind, 7 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Phosphorus, total [as P]4110110July 31, 2026339% over the limit
Nitrogen, ammonia total [as N]85151July 31, 20261,408% over the limit
Oxygen, dissolved [DO]14747August 31, 202583% over the limit
Solids, total suspended42121November 30, 2025424% over the limit
BOD, carbonaceous [5 day, 20 C]41818November 30, 2025248% over the limit
E. coli, MTEC-MF21313July 31, 202699,999% over the limit
pH233October 31, 2017
Temperature, water deg. centigrade200
Nitrite + Nitrate total [as N]200
Turbidity [severity]200
Flow, in conduit or thru treatment plant200
Biosolids weight indluding admixtures200
Sludge waste from secondary clarifiers200

NPDES OH0054526: inspections, violations and enforcement

NPDES OH0054526: 3 single-event violations

DateWhat EPA recordedAgency
April 7, 2021WW SSO - Improper Operation and MaintenanceST6
April 7, 2021Effluent Violations - Unapproved BypassST6
April 7, 2021Management Practice Violations - Inflow/Infiltration (I/I)ST6

NPDES OH0054526 (GREEN MEADOWS MHP): no inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES OH0054526

NPDES OH0054526: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES OH0054526

NPDES OH0054526: 13 pollutant rows, 3 dated events; ICIS-NPDES download, loaded October 14, 2026.