- June 25, 2026: Other noncompliance related to construction stormwater discharges (ST6).
- June 25, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
- June 25, 2026: Failure to properly operate or maintain construction stormwater controls (ST6).
- June 25, 2026: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
- June 25, 2026: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
- June 25, 2026: Failure to properly conduct construction stormwater inspections (ST6).
- June 25, 2026: Evaluation (S).
- April 24, 2026: Failure to properly conduct construction stormwater inspections (ST6).
- April 10, 2026: Failure to properly operate or maintain construction stormwater controls (ST6).
- April 10, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
- April 10, 2026: Other noncompliance related to construction stormwater discharges (ST6).
- April 10, 2026: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
- April 10, 2026: Evaluation (S).
- March 31, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
- March 27, 2026: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
- March 27, 2026: Failure to properly operate or maintain construction stormwater controls (ST6).
- March 27, 2026: Evaluation (S).
- March 13, 2026: Notice of Noncompliance Issued (State).
- March 10, 2026: Failure to properly operate or maintain construction stormwater controls (ST6).
- March 10, 2026: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
- March 10, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
- March 10, 2026: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
- March 10, 2026: Failure to properly conduct construction stormwater inspections (ST6).
- March 10, 2026: Other noncompliance related to construction stormwater discharges (ST6).
- March 10, 2026: Evaluation (S).
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 8,889 were issued before SCR10ZJ9H.
Coverages issued nearest SCR10ZJ9H
- 2025-09-03: EPIC TECH, Andrews: SCR10ZJ9A, held by Ted Smith
- 2025-09-04: CITY SERVICES PARKING LOT, Myrtle Beach: SCR10ZJ9B, held by Chris Miller
- 2025-09-04: SCARLET GROVE, Lancaster: SCR10ZJ9C, held by Caleb Saruse
- 2025-09-04: TRUCK CONTAINER STORAGE YARD, Wando: SCR10ZJ9E, held by Andrew Dupps
- 2025-09-04: SANDRIDGE POD 3 PHASE 1, North Myrtle Beach: SCR10ZJ9F, held by Earl Bailey
- 2025-09-04: SANDY OAKS, Hilton Head: SCR10ZJ9K, held by Steve Baker
- 2025-09-04: THE PICKLEPORT, Myrtle Beach: SCR10ZJ9M, held by Dwight R. Hunsicker
- 2025-09-04: PRO TRADE SHOPS, Myrtle Beach: SCR10ZJ9N, held by Omar Matfuzaylov
- 2025-09-05: BUCK HALL RECREATION AREA RECONSTRUCTION, Mcclellanville: SCR10ZJ9G, held by Jeremiah Zamora
- 2025-09-05: PANERA - DUNCAN, Duncan: SCR10ZJ9P, held by Mark Wilhoite
FIRST BAPTIST CHURCH NEWBERRY among its neighbors
11 discharge permits are in the Upper Cannons Creek subwatershed (HUC 030501060404); SCR10ZJ9H is one. Its county: 89, 2 major; SCR10ZJ9H is minor permit.
Other permits in the Upper Cannons Creek subwatershed (HUC 030501060404)
- CLELAND TRACT MASS GRADING, Newberry: SCR10ZCKC, minor, term to 2028-03-20
- FARRINGTON SUBDIVISION, Newberry: SCR10ZH7W, minor, term to 2030-03-23
- HERITAGE MINI STORAGE, Newberry: SCR10ZEJ0, minor, term to 2028-12-11
- HERITAGE SHOPPING CENTER, Newberry: SCR10ZETV, minor, term to 2029-03-11
- KISWIRE INC STEEL CORD DIVISION, Newberry: SCRNE1105, minor, term to 2030-04-07
- NEWBERRY TRANSFER STATION, Newberry: SCR006471, minor, term to 2027-06-30
- P038568 S-38 JOLLYSTREET ROAD BRIDGE JACKING, N/A: SCR16Z079, minor, term to 2027-12-21
- PD030898 S-36-44 MT BETHEL GARMANY RD BRIDGE JACKING, N/A: SCR16Z07H, minor, term to 2028-01-23
- ROADWAY IMPROVEMENTS TO MAWSON'S WAY, Newberry: SCR10ZH8F, minor, term to 2030-03-25
- SC HIGHWAY 219 SITE, Newberry: SCR10ZKVC, minor, term to 2031-04-29
What stands out
- Its term runs 4 years and 364 days, September 4, 2025 to September 3, 2030.
- Its newest dated event on file is single-event violation and inspection on June 25, 2026, 82 days before EPA's file was loaded.
- In the 365 days to September 15, 2026, it was dated 20 single-event violations, 4 inspections, 1 informal enforcement action.
- EPA's file dates 25 events for it, all in 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | FIRST BAPTIST CHURCH NEWBERRY |
|---|---|
| Permittee | Ward Braswell |
| NPDES ID | SCR10ZJ9H |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 4, 2025 |
| Expires | September 3, 2030 |
| Agency | State |
| Address | (Unknown City), SC |
| Subwatershed | Upper Cannons Creek (HUC 030501060404) |
NPDES SCR10ZJ9H: effluent limits and exceedances
FIRST BAPTIST CHURCH NEWBERRY (NPDES SCR10ZJ9H): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10ZJ9H: no pollutant row on file.
NPDES SCR10ZJ9H: inspections, violations and enforcement
NPDES SCR10ZJ9H: 20 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| June 25, 2026 | Other noncompliance related to construction stormwater discharges | ST6 |
| June 25, 2026 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
| June 25, 2026 | Failure to properly operate or maintain construction stormwater controls | ST6 |
| June 25, 2026 | Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] | ST6 |
| June 25, 2026 | Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) | ST6 |
| June 25, 2026 | Failure to properly conduct construction stormwater inspections | ST6 |
| April 24, 2026 | Failure to properly conduct construction stormwater inspections | ST6 |
| April 10, 2026 | Failure to properly operate or maintain construction stormwater controls | ST6 |
| April 10, 2026 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
| April 10, 2026 | Other noncompliance related to construction stormwater discharges | ST6 |
| April 10, 2026 | Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) | ST6 |
| March 31, 2026 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
| March 27, 2026 | Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) | ST6 |
| March 27, 2026 | Failure to properly operate or maintain construction stormwater controls | ST6 |
| March 10, 2026 | Failure to properly operate or maintain construction stormwater controls | ST6 |
| March 10, 2026 | Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) | ST6 |
| March 10, 2026 | Failure to properly install, initiate, or fully implement construction stormwater controls | ST6 |
| March 10, 2026 | Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] | ST6 |
| March 10, 2026 | Failure to properly conduct construction stormwater inspections | ST6 |
| March 10, 2026 | Other noncompliance related to construction stormwater discharges | ST6 |
NPDES SCR10ZJ9H: 4 inspections
| Date | What EPA recorded | Agency |
|---|---|---|
| June 25, 2026 | Evaluation | S |
| April 10, 2026 | Evaluation | S |
| March 27, 2026 | Evaluation | S |
| March 10, 2026 | Evaluation | S |
NPDES SCR10ZJ9H: 1 informal enforcement action
| Date | What EPA recorded | Agency |
|---|---|---|
| March 13, 2026 | Notice of Noncompliance Issued | State |
NPDES SCR10ZJ9H (FIRST BAPTIST CHURCH NEWBERRY): no formal enforcement action on file.
Watch NPDES SCR10ZJ9H
NPDES SCR10ZJ9H: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10ZJ9H
NPDES SCR10ZJ9H: 0 pollutant rows, 25 dated events; ICIS-NPDES download, loaded September 15, 2026.