NPDES TXR1502XN · Clean Water Act
UPPER HARRIS BRANCH WASTEWATER INTERCEPTOR, Austin, TX: NPDES TXR1502XN discharge permit, effluent exceedances, inspections, penalties
UPPER HARRIS BRANCH WASTEWATER INTERCEPTOR, Austin, Texas: General permit coverage TXR1502XN, held by S. J. Louis Construction of Texas Ltd.; Construction stormwater; Effective; issued March 4, 2026, term to March 4, 2028; discharges to LAKE WALTER E LONG.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 19,340 were issued before TXR1502XN. S. J. Louis Construction of Texas Ltd. holds 18 permits in Texas.
Other permits held by S. J. Louis Construction of Texas Ltd.
- W-52 CULEBRA CREEK SEWER CAPACITY RELIEF PROJECT, San Antonio: TXR1508SJ, issued 2024-10-07
- SEWER IMPROVEMENTS PLANO PARKWAY PARALLEL INTERCEPTOR, Plano: TXR1512SI, issued 2024-10-03
- MCKAMY & OSAGE BRANCH WASTEWATER INTERCEPTOR RELOCATION, Dallas: TXR1522WJ, issued 2025-11-06
- SECONDARY COLORADO RIVER RAW WATER LINE - PKG3, Austin: TXR1525SZ, issued 2024-12-10
- W-9 UPPER LEON CREEK SEWER CAPACITY STORAGE AND RELIEF, San Antonio: TXR1531RY, issued 2024-08-28
- WATER TRANSMISSION AMERICAN PLAZA TO EXCHANGE PARKWAY, Waco: TXR1536TL, issued 2025-01-29
- SEWER IMPROVEMENTS DALLAS NORTH TRUNK PHASE 2, Plano: TXR1540VE, issued 2025-07-10
- GRAND AVENUE BYPASS, Fort Worth: TXR1544OT, issued 2023-10-20
- PART 14 - CHANNEL SEGMENT C SANITARY SEWER RELOCATIONS, Fort Worth: TXR1545NV, issued 2023-08-02
- 24 TREATED TRANSMISSION WATERLINE PROJECT - PHASE 3, Odem: TXR1554IP, issued 2022-04-01
Coverages issued nearest TXR1502XN
- 2026-03-03: VISTA MHC SUBDIVISION, San Antonio: TXR1595XM, held by Vista Grove Mhc, LLC
- 2026-03-03: ALAMO CITY ESS, San Antonio: TXR1596XM, held by Alamo City Ess LLC
- 2026-03-03: PRAIRIELAND VILLAGE ALL PHASES OF CONSTRUCTION, Cypress: TXR1597XM, held by 3Sbs LLC
- 2026-03-03: GBENJO RESIDENCE, Missouri City: TXR1598XM, held by Community Venture Builders, LLC
- 2026-03-04: KELLERCRAIG RESIDENCE, Willis: TXR1501XN, held by Blackoak Homes LLC
- 2026-03-04: UP ROBINSON YARD PHASE 2 & 3, Dayton: TXR1503XN, held by W.T. Byler Co., LLC
- 2026-03-04: ENGLEWOOD TANK TRACK EXPANSION, Houston: TXR1504XN, held by W.T. Byler Co., LLC
- 2026-03-04: BRUSHY CREEK WASTEWATER INTERCEPTOR PHASE 4, Hutto: TXR1506XN, held by Mckee Utility Contractors, Llc
- 2026-03-04: N OAKRIDGE RD PAVING IMPROVEMENTS, Hudson Oaks: TXR1507XN, held by D D M Construction Corporation
- 2026-03-04: RIVIERA PINES SECTION 4 WS&D, Huffman: TXR1508XN, held by Dimas Bros. Construction, LLC
UPPER HARRIS BRANCH WASTEWATER INTERCEPTOR among its neighbors
154 discharge permits are in the Gilleland Creek subwatershed (HUC 120903010106); TXR1502XN is one. Its county: 1,099, 15 major; TXR1502XN is minor permit.
Other permits in the Gilleland Creek subwatershed (HUC 120903010106)
- 12401 HULSEY RD SELF-STORAGE, Manor: TXR1512XT, minor, term to 2028-03-04
- 12420 TILLGANG PASS BLDG 3, Manor: TXR1506VA, minor, term to 2028-03-04
- 3 MEN MOVERS AUSTIN, Austin: TXR1505SK, minor, term to 2028-03-04
- ABF FREIGHT SYSTEM, Pflugerville: TXRNECE69, minor, term to 2026-08-13
- AMERICAN BOTTLING MANOR, Manor: TXR05GV25, minor, term to 2026-08-13
- AUSTIN FOAM PLASTICS, Pflugerville: TXRNEAY37, minor, term to 2021-08-13
- BAE SYSTEMS, Austin: TXRNECR13, minor, term to 2026-08-13
- BANYAN EVERTON AMENITY CENTER, Pflugerville: TXR1582NX, minor, term to 2028-03-04
- BLACK LOCUST TOWNHOMES, Pflugerville: TXR1518MG, minor, term to 2028-03-04
- BLAKE MANOR - EAST TRAVIS COUNTY WWTP, Manor: TX0147974
What stands out
- Its term runs 2 years, March 4, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | UPPER HARRIS BRANCH WASTEWATER INTERCEPTOR |
|---|---|
| Permittee | S. J. Louis Construction of Texas Ltd. |
| NPDES ID | TXR1502XN |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 4, 2026 |
| Expires | March 4, 2028 |
| Address | Austin, TX 78653 |
| Receiving water | LAKE WALTER E LONG |
| Subwatershed | Gilleland Creek (HUC 120903010106) |
NPDES TXR1502XN: effluent limits and exceedances
UPPER HARRIS BRANCH WASTEWATER INTERCEPTOR (NPDES TXR1502XN): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1502XN: no pollutant row on file.
NPDES TXR1502XN: inspections, violations and enforcement
NPDES TXR1502XN (UPPER HARRIS BRANCH WASTEWATER INTERCEPTOR): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1502XN
NPDES TXR1502XN: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1502XN
NPDES TXR1502XN: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.