Velarion Records
Free: one email when NPDES VAG250129 changes. Unsubscribe any time.

NPDES VAG250129 · Clean Water Act

BRASFIELD HYDROELECTRIC PROJECT, Petersburg, VA: NPDES VAG250129 discharge permit, effluent exceedances, inspections, penalties

BRASFIELD HYDROELECTRIC PROJECT, Petersburg, Virginia: General permit coverage VAG250129, held by Appomattox River Associates LP; Administratively continued; issued March 2, 2018, term to March 1, 2023, by Virginia; discharges to Appomattox River-Oldtown Creek; Hydroelectric Power Generation.

4 of the 5 pollutants listed for NPDES VAG250129 have no violation or effluent exceedance.

  • Copper, total recoverable: 1 limit, 4 violations of any kind, 4 effluent exceedances, latest March 31, 2024, largest 156% over the limit.
  • pH: 2 limits.
  • Temperature, water deg. centigrade: 1 limit.
  • Zinc, total recoverable: 1 limit.
  • Flow, in conduit or thru treatment plant: 1 limit.
  • August 18, 2026: Evaluation (S).

Other permits in Petersburg

Identity

FacilityBRASFIELD HYDROELECTRIC PROJECT
PermitteeAppomattox River Associates LP
NPDES IDVAG250129
StatusAdministratively continued
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
IssuedMarch 2, 2018
ExpiresMarch 1, 2023
AgencyVirginia
AddressPetersburg, VA 23803
Receiving waterAppomattox River-Oldtown Creek
Receiving water impaired303(D) Listed
NAICS221111 – Hydroelectric Power Generation
SIC4911 – Electric Services

NPDES VAG250129: effluent limits and exceedances

BRASFIELD HYDROELECTRIC PROJECT (NPDES VAG250129): 5 pollutants on file, 5 limited; 1 with a violation of any kind, 1 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Copper, total recoverable144March 31, 2024156% over the limit
pH200
Temperature, water deg. centigrade100
Zinc, total recoverable100
Flow, in conduit or thru treatment plant100

NPDES VAG250129: inspections, violations and enforcement

NPDES VAG250129: 1 inspection

DateWhat EPA recordedAgency
August 18, 2026EvaluationS

NPDES VAG250129 (BRASFIELD HYDROELECTRIC PROJECT): no single-event violation, formal enforcement action and informal enforcement action on file.

Watch NPDES VAG250129

NPDES VAG250129: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES VAG250129

NPDES VAG250129: 5 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.