Skilled nursing facility · CMS certification number 155657
HARRISON HEALTHCARE CENTER
CORYDON, Indiana · Medicare and Medicaid
Certified beds, as filed in Care Compare: 92
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 0 · Fines: 0 · Fines, total amount: $0.00 · Payment denials: 0. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for July 1, 2024 to June 30, 2025 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on December 31, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $12,838,015 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,944,390 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,893,625 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,645,891 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $247,734 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $14,512 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $262,246 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $262,246 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 33,580 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 1,956 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 20,207 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 6,703 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 28,866 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 56 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 112 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 122 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 290 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 34.93 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 180.42 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 99.54 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1445825, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2024, ended June 30, 2024
Cost report for December 1, 2023 to June 30, 2024 — a reporting period of 212 days, not a full year, on form CMS-2540-10, settled, processed by CMS on December 31, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $7,826,929 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,072,838 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,754,091 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,609,210 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $144,881 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $48,273 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $193,154 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $193,154 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 17,231 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 180 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 29.82 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 202.33 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 95.73 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1401712, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2023, ended November 30, 2023
Cost report for July 1, 2023 to November 30, 2023 — a reporting period of 152 days, not a full year, on form CMS-2540-10, settled, processed by CMS on August 15, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,120,276 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,545,563 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,574,713 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,696,189 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$121,476 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,363 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$119,113 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$119,113 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 11,763 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 212 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 37.26 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 87.13 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 55.49 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1392247, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2022, ended June 30, 2022
Cost report for July 1, 2021 to June 30, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 20, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,871,787 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,175,925 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $11,695,862 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,770,274 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $925,588 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | −$142,983 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $782,605 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $782,605 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 29,633 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 452 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 35.94 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 195.34 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 65.56 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1340602, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2021, ended June 30, 2021
Cost report for July 1, 2020 to June 30, 2021 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on March 4, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,444,094 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,187,347 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,256,747 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,947,597 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $309,150 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $244,369 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $553,519 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $553,519 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 28,608 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 392 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 30.68 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, all patients, in days | 72.98 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1311332, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2020, ended June 30, 2020
Cost report for July 1, 2019 to June 30, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on January 19, 2021.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,052,048 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,142,990 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,909,058 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,831,681 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $77,377 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $457,088 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $534,465 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $534,465 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 31,283 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 315 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.29 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, all patients, in days | 99.31 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1278593, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2019, ended June 30, 2019
Cost report for July 1, 2018 to June 30, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 30, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,308,534 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,906,008 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,402,526 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $11,145,677 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,743,151 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,680,939 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $937,788 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $937,788 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 32,144 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 396 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 37.28 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, all patients, in days | 81.17 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1250176, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2018, ended June 30, 2018
Cost report for July 1, 2017 to June 30, 2018 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on February 2, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $12,988,260 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $4,250,062 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,738,198 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,811,164 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$2,072,966 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,691,215 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$381,751 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$381,751 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 31,097 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 355 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 29.73 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, all patients, in days | 87.6 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1218843, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2017, ended June 30, 2017
Cost report for July 1, 2016 to June 30, 2017 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 30, 2018.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $12,262,775 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,008,002 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $11,254,773 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,910,262 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $344,511 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $47,539 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $392,050 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $392,050 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 31,540 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 376 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 31.83 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 558.77 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 83.88 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1183005, read from the public cost report file SNF10FY2016.zip.
Fiscal year 2016, ended June 30, 2016
Cost report for July 1, 2015 to June 30, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on December 2, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,543,013 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $731,627 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,811,386 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,208,616 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $602,770 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $44,550 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $647,320 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $647,320 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 28,419 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 383 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.06 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 377.97 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 74.2 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1147453, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2015, ended June 30, 2015
Cost report for July 1, 2014 to June 30, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 20, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,268,878 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $604,638 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,664,240 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,777,073 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $887,167 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $44,139 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $931,306 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $931,306 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 30,070 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 377 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 34.66 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 419.56 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 79.76 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1116972, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2014, ended June 30, 2014
Cost report for January 1, 2014 to June 30, 2014 — a reporting period of 180 days, not a full year, on form CMS-2540-10, settled, processed by CMS on December 18, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,338,528 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $194,873 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,143,655 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,871,251 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $272,404 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $21,754 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $294,158 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $294,158 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 15,823 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 149 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 35.63 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 906.89 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 106.19 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1083133, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2013, ended June 30, 2013
Cost report for July 1, 2012 to June 30, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on February 4, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $10,206,857 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,782,330 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,424,527 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,809,631 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $614,896 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $47,439 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $662,335 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $662,335 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 32,117 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 285 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 40.42 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 890.58 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 112.69 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1085393, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2012, ended June 30, 2012
Cost report for July 1, 2011 to June 30, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on August 29, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $10,249,981 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,493,981 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,756,000 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,027,418 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $728,582 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $50,750 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $779,332 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $779,342 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 32,542 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 333 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.17 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 598.11 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 97.72 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1047533, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2011, ended June 30, 2011
Cost report for July 1, 2010 to June 30, 2011 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on April 17, 2012.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $8,596,879 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,973,186 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $623,693 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $51,439 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $675,132 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,191 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 320 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 37.95 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 451.78 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 100.6 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 427211, read from the public cost report file SNFFY2010.zip.
Fiscal year 2010, ended June 30, 2010
Cost report for July 1, 2009 to June 30, 2010 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on April 20, 2011.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $7,974,644 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,700,877 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $273,767 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $54,962 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $328,729 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,236 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 274 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 43.99 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 647.59 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 117.65 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 397137, read from the public cost report file SNFFY2009.zip.
Fiscal year 2009, ended June 30, 2009
Cost report for July 1, 2008 to June 30, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on April 12, 2010.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $7,986,115 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,387,101 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $599,014 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $54,518 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $653,532 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 31,939 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 274 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 44.14 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 116.57 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 367290, read from the public cost report file SNFFY2008.zip.
Fiscal year 2008, ended June 30, 2008
Cost report for July 1, 2007 to June 30, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on August 14, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $7,239,624 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,048,260 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $191,364 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $52,332 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $243,696 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,651 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 157 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 53.29 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 207.97 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 354695, read from the public cost report file SNFFY2007.zip.
Fiscal year 2007, ended June 30, 2007
Cost report for July 1, 2006 to June 30, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on December 5, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $6,795,000 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,853,225 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$58,225 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $72,533 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $14,308 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,607 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 207 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 50.76 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 157.52 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 297639, read from the public cost report file SNFFY2006.zip.
Fiscal year 2006, ended June 30, 2006
Cost report for July 1, 2005 to June 30, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on January 25, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $7,040,133 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,024,277 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $15,856 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $56,740 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $72,596 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,200 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 190 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 41.28 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 169.47 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 271052, read from the public cost report file SNFFY2005.zip.
Fiscal year 2005, ended June 30, 2005
Cost report for July 1, 2004 to June 30, 2005 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on December 28, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,877,297 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,838,224 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $39,073 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $56,375 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $95,448 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,590 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 141 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 43.32 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 231.13 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 240130, read from the public cost report file SNFFY2004.zip.
Fiscal year 2004, ended June 30, 2004
Cost report for July 1, 2003 to June 30, 2004 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on October 17, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,339,973 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,356,993 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$17,020 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $58,213 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $41,193 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,830 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 131 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 48.14 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 250.61 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 234474, read from the public cost report file SNFFY2003.zip.
Fiscal year 2003, ended June 30, 2003
Cost report for July 1, 2002 to June 30, 2003 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on November 10, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,190,077 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,314,819 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$124,742 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $55,231 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$69,511 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,792 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 113 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 47.88 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 290.19 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 199303, read from the public cost report file SNFFY2002.zip.
Fiscal year 2002, ended June 30, 2002
Cost report for July 1, 2001 to June 30, 2002 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on December 18, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,553,856 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,109,976 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $443,880 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $53,211 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $497,091 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,551 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 192 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 49.16 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 169.54 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 165663, read from the public cost report file SNFFY2001.zip.
Fiscal year 2001, ended June 30, 2001
Cost report for July 1, 2000 to June 30, 2001 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on May 20, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,928,492 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,676,835 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $251,657 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $48,241 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $299,898 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 28,183 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 230 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 41.55 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 122.53 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 145647, read from the public cost report file SNFFY2000.zip.
Fiscal year 2000, ended June 30, 2000
Cost report for July 1, 1999 to June 30, 2000 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on June 19, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,768,632 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,386,443 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$617,811 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $42,290 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$575,521 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 19,880 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 225 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 45.29 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 88.36 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 150428, read from the public cost report file SNFFY1999.zip.
Fiscal year 1999, ended June 30, 1999
Cost report for August 7, 1998 to June 30, 1999 — a reporting period of 327 days, on form CMS-2540-96, as submitted, processed by CMS on April 21, 2000.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $1,926,492 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,111,414 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,184,922 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $22,757 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$1,162,165 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 92 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 8,845 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 170 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 40.55 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 52.03 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 86660, read from the public cost report file SNFFY1998.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| BEECHMONT II MGT CO LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 09/01/2017 |
| BLUE MANAGEMENT SERVICES LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 12/01/2023 |
| FIRST BANK OF BERNE | ADP OF THE SNF | Organization | NOT APPLICABLE | since 12/01/2023 |
| MASROOR, MUHAMMAD | ADP OF THE SNF | Individual | NOT APPLICABLE | since 12/10/2025 |
| OMEGA HEALTHCARE INVESTORS INC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 09/01/2017 |
| OMG IN MSTR LSCO LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 12/10/2025 |
| PACE, SANDI | ADP OF THE SNF | Individual | NOT APPLICABLE | since 11/11/2024 |
| SMITH, SCOTT | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 12/01/2023 |
| SPRUNGER, KYLE | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 12/01/2023 |
| WHEELER, DANE | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 12/01/2023 |
| BORNE-BAUMAN, CANDICE | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 12/01/2023 |
| FLUECKIGER, RUSSELL | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 12/01/2023 |
| LEHMAN, SCOTT | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 12/01/2023 |
| MACKLIN, LARRY | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 12/01/2023 |
| MCINTIRE, DAVID | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 12/01/2023 |
| ADAMS COUNTY MEMORIAL HOSPITAL | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 12/01/2023 |
| BEECHMONT II MGT CO LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 09/01/2017 |
| BORNE-BAUMAN, CANDICE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
| FLUECKIGER, RUSSELL | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
| LEHMAN, SCOTT | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
| MACKLIN, LARRY | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
| MASROOR, MUHAMMAD | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 10/01/2020 |
| MCINTIRE, DAVID | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
| ODENTHAL, RICHARD | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 09/01/2017 |
| PACE, SANDI | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 11/11/2024 |
| SMITH, SCOTT | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
| SPRUNGER, KYLE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
| WHEELER, DANE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/01/2023 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of ADAMS COUNTY MEMORIAL HOSPITAL (enrollment ID O20240105001297).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| ADAMS COUNTY MEMORIAL HOSPITAL | Organization | 5% OR GREATER DIRECT OWNERSHIP INTEREST | 100 | 12/1/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| BEECHMONT II MGT CO LLC | Organization | ADP OF THE SNF | Not stated in the filing | 9/1/2017 | Private equity company: No Real estate investment trust: No Holding company: No |
| BLUE MANAGEMENT SERVICES LLC | Organization | ADP OF THE SNF | Not stated in the filing | 12/1/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| FIRST BANK OF BERNE | Organization | ADP OF THE SNF | Not stated in the filing | 12/1/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| MUHAMMAD I MASROOR | Individual | ADP OF THE SNF | Not stated in the filing | 12/10/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| OMEGA HEALTHCARE INVESTORS INC | Organization | ADP OF THE SNF | Not stated in the filing | 9/1/2017 | Private equity company: No Real estate investment trust: No Holding company: No |
| OMG IN MSTR LSCO LLC | Organization | ADP OF THE SNF | Not stated in the filing | 12/10/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| SANDI PACE | Individual | ADP OF THE SNF | Not stated in the filing | 11/11/2024 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DANE WHEELER | Individual | CORPORATE OFFICER | 100 | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| KYLE SPRUNGER | Individual | CORPORATE OFFICER | 100 | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SCOTT T SMITH | Individual | CORPORATE OFFICER | 100 | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| CANDICE BORNE-BAUMAN | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DAVID MCINTIRE | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| LARRY MACKLIN | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| RUSSELL W FLUECKIGER | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SCOTT E LEHMAN | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ADAMS COUNTY MEMORIAL HOSPITAL | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| BEECHMONT II MGT CO LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 9/1/2017 | Private equity company: No Real estate investment trust: No Holding company: No |
| CANDICE BORNE-BAUMAN | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DANE WHEELER | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DAVID MCINTIRE | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| KYLE SPRUNGER | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| LARRY MACKLIN | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MUHAMMAD I MASROOR | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 10/1/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| RICHARD ODENTHAL | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 9/1/2017 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| RUSSELL W FLUECKIGER | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SANDI PACE | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 11/11/2024 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SCOTT E LEHMAN | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SCOTT T SMITH | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
Changes in ownership
- February 1, 2026: SCOTT T SMITH no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: KYLE SPRUNGER no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DANE E WHEELER no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SANDI PACE (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since November 11, 2024. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SANDI PACE (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since November 11, 2024. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: RICHARD ODENTHAL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SCOTT T SMITH (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BEECHMONT II MGT CO LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BEECHMONT II MGT CO LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: KYLE SPRUNGER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BLUE MANAGEMENT SERVICES LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CANDICE BORNE-BAUMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CANDICE BORNE-BAUMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MUHAMMAD I MASROOR (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 10, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MUHAMMAD I MASROOR (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since October 1, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DAVID MCINTIRE (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DAVID MCINTIRE (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: RUSSELL W FLUECKIGER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: RUSSELL W FLUECKIGER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DANE E WHEELER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LARRY MACKLIN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LARRY MACKLIN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: OMEGA HEALTHCARE INVESTORS INC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SCOTT E LEHMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SCOTT E LEHMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: OMG IN MSTR LSCO LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 10, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: ADAMS COUNTY MEMORIAL HOSPITAL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: FIRST BANK OF BERNE (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- May 1, 2024: CHARLES STOLTZ no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: JAMES D BICKEL no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: RICHARD ODENTHAL no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: BEECHMONT II MGT CO LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: COLUMBUS REGIONAL HOSPITAL no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: ETHAN PEAK no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: JENNIFER CAMPBELL no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: SCOTT T SMITH (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: SCOTT T SMITH (OFFICER) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: KYLE SPRUNGER (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: KYLE SPRUNGER (OFFICER) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: DANE E WHEELER (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: DANE E WHEELER (OFFICER) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: ADAMS COUNTY MEMORIAL HOSPITAL (5% OR GREATER DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
Recent changes on this record
- February 1, 2026: SCOTT T SMITH no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: KYLE SPRUNGER no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DANE E WHEELER no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SANDI PACE (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since November 11, 2024. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SANDI PACE (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since November 11, 2024. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: RICHARD ODENTHAL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SCOTT T SMITH (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BEECHMONT II MGT CO LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BEECHMONT II MGT CO LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: KYLE SPRUNGER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BLUE MANAGEMENT SERVICES LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CANDICE BORNE-BAUMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CANDICE BORNE-BAUMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MUHAMMAD I MASROOR (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 10, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MUHAMMAD I MASROOR (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since October 1, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DAVID MCINTIRE (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DAVID MCINTIRE (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: RUSSELL W FLUECKIGER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: RUSSELL W FLUECKIGER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: DANE E WHEELER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LARRY MACKLIN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LARRY MACKLIN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: OMEGA HEALTHCARE INVESTORS INC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since September 1, 2017. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SCOTT E LEHMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SCOTT E LEHMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: OMG IN MSTR LSCO LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 10, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: ADAMS COUNTY MEMORIAL HOSPITAL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: FIRST BANK OF BERNE (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- December 31, 2025: A cost report was filed for fiscal year 2025, on form CMS-2540-10. SNF10FY2024.zip
- December 31, 2024: A cost report was filed for fiscal year 2024, on form CMS-2540-10. SNF10FY2024.zip
- August 15, 2024: A cost report was filed for fiscal year 2023, on form CMS-2540-10. SNF10FY2023.zip
- May 1, 2024: CHARLES STOLTZ no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: JAMES D BICKEL no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: RICHARD ODENTHAL no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: BEECHMONT II MGT CO LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: COLUMBUS REGIONAL HOSPITAL no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: ETHAN PEAK no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: JENNIFER CAMPBELL no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: SCOTT T SMITH (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
- May 1, 2024: SCOTT T SMITH (OFFICER) first listed in CMS’s Medicare enrollment ownership file on May 1, 2024; associated with this enrollment since December 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-05-01.csv
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | January 29, 2026 | January 29, 2026 | 2 | 3 |
| 2 | December 18, 2024 | December 18, 2024 | 10 | 7 |
| 3 | November 8, 2023 | November 8, 2023 | 19 | 12 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
31 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| January 29, 2026 | Health | F 0690 | Quality of Life and Care Deficiencies | Provide appropriate care for residents who are continent or incontinent of bowel/bladder, appropriate catheter care, and appropriate care to prevent urinary tract infections. | D | No | Deficient, Provider has date of correction | February 16, 2026 |
| January 29, 2026 | Health | F 0755 | Pharmacy Service Deficiencies | Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist. | D | Yes | Deficient, Provider has date of correction | February 16, 2026 |
| August 6, 2025 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | Yes | Deficient, Provider has date of correction | September 2, 2025 |
| August 6, 2025 | Health | F 0690 | Quality of Life and Care Deficiencies | Provide appropriate care for residents who are continent or incontinent of bowel/bladder, appropriate catheter care, and appropriate care to prevent urinary tract infections. | D | Yes | Deficient, Provider has date of correction | September 2, 2025 |
| August 6, 2025 | Health | F 0695 | Quality of Life and Care Deficiencies | Provide safe and appropriate respiratory care for a resident when needed. | D | Yes | Deficient, Provider has date of correction | September 2, 2025 |
| August 6, 2025 | Health | F 0842 | Resident Assessment and Care Planning Deficiencies | Safeguard resident-identifiable information and/or maintain medical records on each resident that are in accordance with accepted professional standards. | D | Yes | Deficient, Provider has date of correction | September 2, 2025 |
| December 18, 2024 | Health | F 0550 | Resident Rights Deficiencies | Honor the resident's right to a dignified existence, self-determination, communication, and to exercise his or her rights. | D | No | Deficient, Provider has date of correction | January 20, 2025 |
| December 18, 2024 | Health | F 0694 | Quality of Life and Care Deficiencies | Provide for the safe, appropriate administration of IV fluids for a resident when needed. | D | No | Deficient, Provider has date of correction | January 20, 2025 |
| December 18, 2024 | Health | F 0695 | Quality of Life and Care Deficiencies | Provide safe and appropriate respiratory care for a resident when needed. | E | No | Deficient, Provider has date of correction | January 20, 2025 |
| December 18, 2024 | Health | F 0757 | Pharmacy Service Deficiencies | Ensure each resident’s drug regimen must be free from unnecessary drugs. | D | No | Deficient, Provider has date of correction | January 20, 2025 |
| December 18, 2024 | Health | F 0770 | Administration Deficiencies | Provide timely, quality laboratory services/tests to meet the needs of residents. | D | No | Deficient, Provider has date of correction | January 20, 2025 |
| October 18, 2024 | Health | F 0921 | Environmental Deficiencies | Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public. | E | Yes | Deficient, Provider has date of correction | November 8, 2024 |
| June 10, 2024 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | E | Yes | Deficient, Provider has date of correction | July 9, 2024 |
| June 10, 2024 | Health | F 0695 | Quality of Life and Care Deficiencies | Provide safe and appropriate respiratory care for a resident when needed. | D | Yes | Deficient, Provider has date of correction | July 9, 2024 |
| June 10, 2024 | Health | F 0921 | Environmental Deficiencies | Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public. | E | Yes | Deficient, Provider has date of correction | July 9, 2024 |
| November 8, 2023 | Health | F 0554 | Resident Rights Deficiencies | Allow residents to self-administer drugs if determined clinically appropriate. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0657 | Resident Assessment and Care Planning Deficiencies | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0690 | Quality of Life and Care Deficiencies | Provide appropriate care for residents who are continent or incontinent of bowel/bladder, appropriate catheter care, and appropriate care to prevent urinary tract infections. | D | Yes | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0691 | Quality of Life and Care Deficiencies | Provide appropriate colostomy, urostomy, or ileostomy care/services for a resident who requires such services. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0695 | Quality of Life and Care Deficiencies | Provide safe and appropriate respiratory care for a resident when needed. | D | Yes | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0727 | Nursing and Physician Services Deficiencies | Have a registered nurse on duty 8 hours a day; and select a registered nurse to be the director of nurses on a full time basis. | E | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0745 | Quality of Life and Care Deficiencies | Provide medically-related social services to help each resident achieve the highest possible quality of life. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0755 | Pharmacy Service Deficiencies | Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0883 | Infection Control Deficiencies | Develop and implement policies and procedures for flu and pneumonia vaccinations. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| November 8, 2023 | Health | F 0908 | Environmental Deficiencies | Keep all essential equipment working safely. | D | No | Deficient, Provider has date of correction | December 4, 2023 |
| September 19, 2023 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | G | Yes | Deficient, Provider has date of correction | September 25, 2023 |
| September 6, 2023 | Health | F 0580 | Resident Rights Deficiencies | Immediately tell the resident, the resident's doctor, and a family member of situations (injury/decline/room, etc.) that affect the resident. | D | Yes | Deficient, Provider has date of correction | September 7, 2023 |
| September 6, 2023 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | Yes | Deficient, Provider has date of correction | September 7, 2023 |
From the Care Compare health citations file NH_HealthCitations_Sep2026_2.csv, processed on September 1, 2026.
Penalties
No penalty on file for this facility in CMS’s Care Compare penalties data.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | Non profit - Corporation |
| Legal Business Name | ADAMS COUNTY MEMORIAL HOSPITAL |
| Date First Approved to Provide Medicare and Medicaid Services | 1998-08-07 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | N |
| Urban | Y |
| County/Parish | Harrison |
| Telephone Number | 8127380550 |
| Chain Name | COMMUNICARE HEALTH |
| Chain ID | 153 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | Resident |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 92 |
| Average Number of Residents per Day | 74.8 |
| Overall Rating | 4 |
| Health Inspection Rating | 3 |
| QM Rating | 5 |
| Long-Stay QM Rating | 5 |
| Short-Stay QM Rating | 4 |
| Processing Date | 2026-09-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Sep2026_3.csv, processed on September 1, 2026.
Get an email when this record changes
One email a day naming what moved on HARRISON HEALTHCARE CENTER: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On December 31, 2025: A cost report was filed for fiscal year 2025, on form CMS-2540-10. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for HARRISON HEALTHCARE CENTER
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in Indiana at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in Indiana
- AQUATIC WEED CONTROL-NUISANCE PLANT, FLINT Water discharge permit
- THE DALTON'S INC-NUISANCE PLANT, NORTH WEBSTER Water discharge permit
- AQUATIC CONTROL INC., SEYMOUR Water discharge permit
- INDIANAPOLIS DEPT. OF PUBLIC WORKS, INDIANAPOLIS Water discharge permit
- MEUTH CONSTRUCTION SUPPLY, EVANSVILLE Water discharge permit
- UNITED TRANSFER & RECYCLING, LLC, FORT WAYNE Water discharge permit
- BPI MINERALS INCORPORATED, MICHIGAN CITY Water discharge permit
- MEUTH CONSTRUCTION SUPPLY AND CONCRETE NEWBURGH, NEWBURGH Water discharge permit
- RIETH RILEY CONSTRUCTION COMPANY INCORPORATED, TIPTON Air emission source
- LAP WOOD PRODUCTS, MONTEREY Air emission source
- CALCAR QUARRY, PAOLI Air emission source
- E & B PAVING, LLC, NOBLESVILLE Air emission source
- JENSTAR ASPHALT LLC, GARY Air emission source
- DAVIESS COUNTY MUNICIPAL HIGHWAY DEPARTMENT, MONTGOMERY Air emission source
- RIETH-RILEY CONSTRUCTION COMPANY INCORPORATED, FREMONT Air emission source
- JH RUDOLPH & COMPANY INCORPORATED PETERSBURG, DALE Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 155657.