Skilled nursing facility · CMS certification number 295075
PAHRUMP HEALTH AND REHABILITATION
PAHRUMP, Nevada · Medicare and Medicaid
Certified beds, as filed in Care Compare: 120
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 2 · Fines: 2 · Fines, total amount: $40,427.00 · Payment denials: 0. The most recent penalty on file: October 11, 2024, Fine, $26,800. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for January 1, 2024 to December 31, 2024 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on August 29, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $16,363,804 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $4,070,119 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $12,293,685 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $12,947,881 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$654,196 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $107 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$654,089 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$654,090 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 43,920 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 4,589 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 22,829 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 4,097 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 31,515 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 100 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 70 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 90 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 260 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 45.89 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 326.13 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 121.21 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1437352, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2023, ended December 31, 2023
Cost report for August 31, 2023 to December 31, 2023 — a reporting period of 122 days, not a full year, on form CMS-2540-10, settled, processed by CMS on October 21, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,419,929 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,773,847 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,646,082 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,186,932 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$540,850 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $160 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$540,690 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$540,690 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 10,428 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 81 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 63.25 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 278.92 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 128.74 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1397627, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2022, ended December 31, 2022
Cost report for January 1, 2022 to December 31, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 19, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $16,313,356 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $4,560,188 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $11,753,168 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,663,332 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $1,089,836 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $269,149 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $1,358,985 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $1,358,985 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 30,918 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 254 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 56.2 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 394.08 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 121.72 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1372285, read from the public cost report file SNF10FY2022.zip.
Fiscal year 2021, ended December 31, 2021
Cost report for January 1, 2021 to December 31, 2021 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on August 30, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,668,385 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,734,850 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,933,535 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,151,986 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $781,549 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $846,263 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $1,627,812 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $1,627,812 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 25,030 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 96 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 62.08 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 8,242 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 260.73 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1330882, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2020, ended December 31, 2020
Cost report for January 1, 2020 to December 31, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on April 21, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $15,276,470 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $4,424,235 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,852,235 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,557,212 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $2,295,023 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $761,645 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $3,056,668 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $3,056,668 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 27,301 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 251 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 44.69 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 364.26 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 108.77 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1314512, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2019, ended December 31, 2019
Cost report for January 1, 2019 to December 31, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 24, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $15,171,248 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $5,823,296 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,347,952 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,150,149 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $1,197,803 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,562 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $1,199,365 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $1,199,366 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 29,562 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 352 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.01 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 236.8 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 83.98 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1261423, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2018, ended December 31, 2018
Cost report for January 1, 2018 to December 31, 2018 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on August 2, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,798,590 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $5,493,771 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,304,819 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,573,120 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $731,699 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,440 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $733,139 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $733,139 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 25,923 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 378 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.57 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 155.43 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 68.58 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1239315, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2017, ended December 31, 2017
Cost report for January 1, 2017 to December 31, 2017 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on August 21, 2018.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,857,825 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $4,896,840 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,960,985 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,048,240 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$87,255 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $163,082 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $75,827 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $75,830 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 22,463 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 344 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 34.42 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 215.16 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 65.3 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1209844, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2016, ended December 31, 2016
Cost report for January 1, 2016 to December 31, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on August 4, 2017.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,591,319 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $493,832 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,097,487 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,980,613 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$883,126 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $200,409 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$682,717 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$682,717 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 18,891 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 179 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 30.24 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 326.57 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 105.54 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1172087, read from the public cost report file SNF10FY2016.zip.
Fiscal year 2015, ended December 31, 2015
Cost report for January 1, 2015 to December 31, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 25, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,758,801 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $501,853 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,256,948 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,799,935 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$542,987 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $193,876 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$349,111 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$349,111 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 19,500 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 214 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 30.66 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 255.39 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 91.12 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1134615, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2014, ended December 31, 2014
Cost report for January 1, 2014 to December 31, 2014 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 25, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,613,359 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $698,972 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,914,387 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,373,847 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,459,460 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,029 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,458,431 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,458,431 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 20,568 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 300 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 30.11 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 263.6 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 68.56 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1104073, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2013, ended December 31, 2013
Cost report for January 1, 2013 to December 31, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 23, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,144,327 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $403,954 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,740,373 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,586,577 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$846,204 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,231 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$844,973 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$844,973 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 17,646 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 258 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 29.48 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 259.04 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 68.4 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1072680, read from the public cost report file SNF10FY2013.zip.
Fiscal year 2012, ended December 31, 2012
Cost report for January 1, 2012 to December 31, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on July 26, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,227,792 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $90,943 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,136,849 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,438,189 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$301,340 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $582 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$300,758 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$300,758 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 19,910 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 270 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 40.39 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 211.19 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 73.74 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1043958, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2011, ended December 31, 2011
Cost report for January 1, 2011 to December 31, 2011 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on April 19, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $4,573,962 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $85,728 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,488,234 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,719,785 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$231,551 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $761 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$230,790 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$230,790 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 17,483 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 278 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 33.37 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 128.52 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 62.89 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1027704, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2010, ended December 31, 2010
Cost report for January 1, 2010 to December 31, 2010 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on April 26, 2012.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,855,072 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,782,718 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $72,354 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $2,607 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $74,961 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 19,367 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 241 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 33.47 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 187.93 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 80.36 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 428244, read from the public cost report file SNFFY2010.zip.
Fiscal year 2009, ended December 31, 2009
Cost report for January 1, 2009 to December 31, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on May 11, 2011.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,393,014 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,059,775 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $333,239 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $806 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $334,045 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 22,258 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 207 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 56.53 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 169.3 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 107.53 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 399159, read from the public cost report file SNFFY2009.zip.
Fiscal year 2008, ended December 31, 2008
Cost report for January 1, 2008 to December 31, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on September 10, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,297,905 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,445,293 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$147,388 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $804 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$146,584 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 24,163 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 215 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 38.31 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 252.44 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 112.39 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 356442, read from the public cost report file SNFFY2008.zip.
Fiscal year 2007, ended December 31, 2007
Cost report for January 1, 2007 to December 31, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on August 15, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,245,735 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,365,493 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$119,758 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $1,058 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$118,700 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 25,724 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 202 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 38.75 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 242.88 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 127.35 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 324098, read from the public cost report file SNFFY2007.zip.
Fiscal year 2006, ended December 31, 2006
Cost report for January 1, 2006 to December 31, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on August 14, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,945,824 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,149,029 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$203,205 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $1,366 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$201,839 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 26,070 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 143 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 35.67 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 461.17 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 182.31 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 291860, read from the public cost report file SNFFY2006.zip.
Fiscal year 2005, ended December 31, 2005
Cost report for January 1, 2005 to December 31, 2005 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on August 11, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,828,595 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,510,368 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $318,227 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $1,440 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $319,667 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 26,236 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 136 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 33.8 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 325.15 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 192.91 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 260980, read from the public cost report file SNFFY2005.zip.
Fiscal year 2004, ended December 31, 2004
Cost report for January 1, 2004 to December 31, 2004 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on August 18, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,682,607 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,447,321 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $235,286 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $953 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $236,239 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 25,625 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 110 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 36.89 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 661.45 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 232.95 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 231010, read from the public cost report file SNFFY2004.zip.
Fiscal year 2003, ended December 31, 2003
Cost report for January 1, 2003 to December 31, 2003 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on August 4, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,354,189 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,556,229 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$202,040 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $2,131 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$199,909 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 25,273 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 134 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 54.36 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 293.95 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 188.6 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 189331, read from the public cost report file SNFFY2003.zip.
Fiscal year 2002, ended December 31, 2002
Cost report for December 1, 2001 to December 31, 2002 — a reporting period of 395 days, on form CMS-2540-96, settled, processed by CMS on November 23, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,582,964 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,588,996 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$6,032 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $46,947 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $40,915 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 28,825 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 193 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 37.35 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 334.05 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 149.35 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 200445, read from the public cost report file SNFFY2002.zip.
Fiscal year 2001, ended November 30, 2001
Cost report for January 1, 2001 to November 30, 2001 — a reporting period of 333 days, on form CMS-2540-96, settled with audit, processed by CMS on September 25, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,837,582 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,921,582 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,084,000 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $964 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$1,083,036 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 21,263 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 106 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 27.43 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 377.28 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 200.59 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 160798, read from the public cost report file SNFFY2001.zip.
Fiscal year 2000, ended December 31, 2000
Cost report for February 15, 2000 to December 31, 2000 — a reporting period of 320 days, on form CMS-2540-96, settled, processed by CMS on March 19, 2002.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $1,780,055 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,196,374 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,416,319 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $4,294 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$1,412,025 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 120 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 13,444 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 91 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 33.08 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 147.74 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 91842, read from the public cost report file SNFFY2000.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| CH PACIFIC NORTHWEST HOLDINGS LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 08/31/2023 |
| COUVE FINANCIAL SERVICES LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/08/2025 |
| COUVE HEALTHCARE CONSULTING LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/08/2025 |
| EARL, STEVEN | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| HERZKA, YISROEL | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| JORGENSON, CRAIG | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| MORTILLARO, CATHY | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| NEVADA SNF CONSULTING LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/08/2025 |
| PACIFIC NORTHWEST OPCO MANAGEMENT LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/08/2025 |
| PAHRUMP SNF OPERATIONS, LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 06/27/2025 |
| PAHRUMP SNF REALTY LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/08/2025 |
| RIKER, MICHELLE | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| SPIELMAN, SHIMON | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| THAYER, INEZ | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| WITZCORP GLOBAL LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 08/31/2023 |
| YENOWITZ, YITZCHOK | ADP OF THE SNF | Individual | NOT APPLICABLE | since 08/31/2023 |
| PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS (NV) LLC | DIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 08/31/2023 |
| CH PACIFIC NORTHWEST HOLDINGS LLC | INDIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 08/31/2023 |
| HERZKA, YISROEL | INDIRECT OWNERSHIP INTEREST | Individual | NOT APPLICABLE | since 08/31/2023 |
| PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS LLC | INDIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 08/31/2023 |
| WITZCORP GLOBAL LLC | INDIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 08/31/2023 |
| YENOWITZ, YITZCHOK | INDIRECT OWNERSHIP INTEREST | Individual | NOT APPLICABLE | since 08/31/2023 |
| YENOWITZ, YITZCHOK | INDIVIDUAL IS AN OWNER, PARTNER OR TRUSTEE OF ANY ADP OF THE SNF | Individual | NOT APPLICABLE | since 07/02/2025 |
| EARL, STEVEN | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 08/31/2023 |
| RIKER, MICHELLE | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 08/31/2023 |
| COUVE FINANCIAL SERVICES LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 08/31/2023 |
| COUVE HEALTHCARE CONSULTING LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 08/31/2023 |
| EARL, STEVEN | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 08/31/2023 |
| JORGENSON, CRAIG | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 08/31/2023 |
| MORTILLARO, CATHY | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 08/31/2023 |
| NEVADA SNF CONSULTING LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 08/31/2023 |
| PACIFIC NORTHWEST OPCO MANAGEMENT LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 08/31/2023 |
| PAHRUMP SNF OPERATIONS, LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 08/31/2023 |
| RIKER, MICHELLE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 08/31/2023 |
| SPIELMAN, SHIMON | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 08/31/2023 |
| THAYER, INEZ | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 08/31/2023 |
| YENOWITZ, YITZCHOK | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 08/31/2023 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of PAHRUMP SNF OPERATIONS, LLC (enrollment ID O20231127001258).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| CH PACIFIC NORTHWEST HOLDINGS LLC | Organization | 5% OR GREATER INDIRECT OWNERSHIP INTEREST | 66.5 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| WITZCORP GLOBAL LLC | Organization | 5% OR GREATER INDIRECT OWNERSHIP INTEREST | 25 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| CATHY MORTILLARO | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| CH PACIFIC NORTHWEST HOLDINGS LLC | Organization | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| COUVE FINANCIAL SERVICES LLC | Organization | ADP OF THE SNF | Not stated in the filing | 5/8/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| COUVE HEALTHCARE CONSULTING LLC | Organization | ADP OF THE SNF | Not stated in the filing | 5/8/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| CRAIG M JORGENSON | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| INEZ THAYER | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHELLE RIKER | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| NEVADA SNF CONSULTING LLC | Organization | ADP OF THE SNF | Not stated in the filing | 5/8/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| PACIFIC NORTHWEST OPCO MANAGEMENT LLC | Organization | ADP OF THE SNF | Not stated in the filing | 5/8/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| PAHRUMP SNF OPERATIONS, LLC | Organization | ADP OF THE SNF | Not stated in the filing | 6/27/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| PAHRUMP SNF REALTY LLC | Organization | ADP OF THE SNF | Not stated in the filing | 5/8/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| SHIMON SPIELMAN | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| STEVEN EARL | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| WITZCORP GLOBAL LLC | Organization | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| YISROEL E HERZKA | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| YITZCHOK YENOWITZ | Individual | ADP OF THE SNF | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS (NV) LLC | Organization | DIRECT OWNERSHIP INTEREST | 100 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| CH PACIFIC NORTHWEST HOLDINGS LLC | Organization | INDIRECT OWNERSHIP INTEREST | 66.5 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS LLC | Organization | INDIRECT OWNERSHIP INTEREST | 100 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| WITZCORP GLOBAL LLC | Organization | INDIRECT OWNERSHIP INTEREST | 25 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| YISROEL E HERZKA | Individual | INDIRECT OWNERSHIP INTEREST | 66.5 | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| YITZCHOK YENOWITZ | Individual | INDIRECT OWNERSHIP INTEREST | 25 | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| No owner named in the filing | Individual | INDIRECT OWNERSHIP INTEREST | 3 | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| No owner named in the filing | Organization | INDIRECT OWNERSHIP INTEREST | 2.25 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| No owner named in the filing | Organization | INDIRECT OWNERSHIP INTEREST | 2.25 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| No owner named in the filing | Organization | INDIRECT OWNERSHIP INTEREST | 1 | 8/31/2023 | Private equity company: Yes Real estate investment trust: No Holding company: No |
| No owner named in the filing | Individual | INDIRECT OWNERSHIP INTEREST | 1 | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| No owner named in the filing | Organization | INDIRECT OWNERSHIP INTEREST | 3 | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| MICHELLE RIKER | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| STEVEN EARL | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| CATHY MORTILLARO | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| COUVE FINANCIAL SERVICES LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| COUVE HEALTHCARE CONSULTING LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| CRAIG M JORGENSON | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| INEZ THAYER | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHELLE RIKER | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| NEVADA SNF CONSULTING LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| PACIFIC NORTHWEST OPCO MANAGEMENT LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| PAHRUMP SNF OPERATIONS, LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| SHIMON SPIELMAN | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| STEVEN EARL | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| YITZCHOK YENOWITZ | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 8/31/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
Changes in ownership
- April 1, 2026: HAROLD PERLMAN no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: HAROLD PERLMAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- August 1, 2025: SHIMON SPIELMAN no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YISROEL E HERZKA no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS (NV) LLC no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: LEO SATRIAWAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: LEO SATRIAWAN no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS, LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CRAIG M JORGENSON (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CRAIG M JORGENSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHELLE RIKER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHELLE RIKER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHELLE RIKER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CH PACIFIC NORTHWEST HOLDINGS LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CH PACIFIC NORTHWEST HOLDINGS LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SHIMON SPIELMAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CATHY MORTILLARO (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CATHY MORTILLARO (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: NEVADA SNF CONSULTING LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: NEVADA SNF CONSULTING LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YISROEL E HERZKA (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YISROEL E HERZKA (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PAHRUMP SNF REALTY LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEVEN EARL (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEVEN EARL (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEVEN EARL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST OPCO MANAGEMENT LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS (NV) LLC (DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: COUVE FINANCIAL SERVICES LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HAROLD PERLMAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since March 3, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HAROLD PERLMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since March 3, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PAHRUMP SNF OPERATIONS, LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since June 27, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PAHRUMP SNF OPERATIONS, LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: INEZ THAYER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: INEZ THAYER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: COUVE HEALTHCARE CONSULTING LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: COUVE HEALTHCARE CONSULTING LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS, LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: WITZCORP GLOBAL LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: WITZCORP GLOBAL LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: A listing under INDIRECT OWNERSHIP INTEREST, with no owner named, first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- September 1, 2024: EMPRES HEALTHCARE GROUP, INC. EMPLOYEE STOCK OWNERSHIP TRUST no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: MICHAEL J MILLER no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: MICHAEL J MILLER no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: MARTY DAVIS no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: EMPRES NEVADA HEALTHCARE, LLC no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: BRENT WEIL no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: EMPRES FINANCIAL SERVICES LLC no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: EMPRES FINANCIAL SERVICES LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: MIDCAP FINANCIAL TRUST no longer appears as 5% OR GREATER SECURITY INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: GREATBANC TRUST COMPANY no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: CATHY MORTILLARO no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: THOMAS P CARDEN no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: ANNE SWANKE no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: EMPRES HEALTHCARE MANAGEMENT LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: EMPRES HEALTHCARE GROUP INC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: CH PACIFIC NORTHWEST HOLDINGS, LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: SHIMON SPIELMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: SHIMON SPIELMAN (OFFICER) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: YISROEL E HERZKA (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: YITZCHOK YENOWITZ (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: YITZCHOK YENOWITZ (OFFICER) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: YITZCHOK YENOWITZ (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: PACIFIC NORTHWEST OPCO MANAGEMENT, LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS (NV) LLC (5% OR GREATER DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: COUVE FINANCIAL SERVICES LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: LEO SATRIAWAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: LEO SATRIAWAN (OFFICER) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS, LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- September 1, 2024: WITZCORP GLOBAL LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2024; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
Recent changes on this record
- April 1, 2026: HAROLD PERLMAN no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: HAROLD PERLMAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- August 29, 2025: A cost report was filed for fiscal year 2024, on form CMS-2540-10. SNF10FY2024.zip
- August 1, 2025: SHIMON SPIELMAN no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YISROEL E HERZKA no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS (NV) LLC no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: LEO SATRIAWAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: LEO SATRIAWAN no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS, LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CRAIG M JORGENSON (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CRAIG M JORGENSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHELLE RIKER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHELLE RIKER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHELLE RIKER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CH PACIFIC NORTHWEST HOLDINGS LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CH PACIFIC NORTHWEST HOLDINGS LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SHIMON SPIELMAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CATHY MORTILLARO (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CATHY MORTILLARO (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: NEVADA SNF CONSULTING LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: NEVADA SNF CONSULTING LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YISROEL E HERZKA (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YISROEL E HERZKA (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: YITZCHOK YENOWITZ (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PAHRUMP SNF REALTY LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEVEN EARL (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEVEN EARL (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEVEN EARL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST OPCO MANAGEMENT LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PACIFIC NORTHWEST SNF OPERATIONS HOLDINGS (NV) LLC (DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: COUVE FINANCIAL SERVICES LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 8, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HAROLD PERLMAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since March 3, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HAROLD PERLMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since March 3, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PAHRUMP SNF OPERATIONS, LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since June 27, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: PAHRUMP SNF OPERATIONS, LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: INEZ THAYER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: INEZ THAYER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since August 31, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | December 19, 2025 | December 19, 2025 | 5 | 5 |
| 2 | October 11, 2024 | October 11, 2024 | 7 | 7 |
| 3 | November 30, 2023 | November 30, 2023 | 11 | 4 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
23 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| December 19, 2025 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | No | Deficient, Provider has date of correction | January 30, 2026 |
| December 19, 2025 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | No | Deficient, Provider has date of correction | January 30, 2026 |
| December 19, 2025 | Health | F 0698 | Quality of Life and Care Deficiencies | Provide safe, appropriate dialysis care/services for a resident who requires such services. | D | No | Deficient, Provider has date of correction | January 30, 2026 |
| December 19, 2025 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | D | No | Deficient, Provider has date of correction | January 30, 2026 |
| December 19, 2025 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | January 30, 2026 |
| October 11, 2024 | Health | F 0565 | Resident Rights Deficiencies | Honor the resident's right to organize and participate in resident/family groups in the facility. | E | No | Deficient, Provider has date of correction | November 1, 2024 |
| October 11, 2024 | Health | F 0655 | Resident Assessment and Care Planning Deficiencies | Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted | D | No | Deficient, Provider has date of correction | November 1, 2024 |
| October 11, 2024 | Health | F 0688 | Quality of Life and Care Deficiencies | Provide appropriate care for a resident to maintain and/or improve range of motion (ROM), limited ROM and/or mobility, unless a decline is for a medical reason. | G | No | Deficient, Provider has date of correction | November 1, 2024 |
| October 11, 2024 | Health | F 0758 | Pharmacy Service Deficiencies | Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited. | D | No | Deficient, Provider has date of correction | November 1, 2024 |
| October 11, 2024 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | D | No | Deficient, Provider has date of correction | November 1, 2024 |
| October 11, 2024 | Health | F 0812 | Nutrition and Dietary Deficiencies | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | E | No | Deficient, Provider has date of correction | November 1, 2024 |
| October 11, 2024 | Health | F 0849 | Administration Deficiencies | Arrange for the provision of hospice services or assist the resident in transferring to a facility that will arrange for the provision of hospice services. | D | No | Deficient, Provider has date of correction | November 1, 2024 |
| April 9, 2024 | Health | F 0678 | Quality of Life and Care Deficiencies | Provide basic life support, including CPR, prior to the arrival of emergency medical personnel , subject to physician orders and the resident’s advance directives. | J | Yes | Past Non-Compliance | April 4, 2024 |
| April 9, 2024 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | Yes | Deficient, Provider has date of correction | April 30, 2024 |
| April 9, 2024 | Health | F 0940 | Administration Deficiencies | Develop, implement, and/or maintain an effective training program for all new and existing staff members. | E | Yes | Deficient, Provider has date of correction | April 26, 2024 |
| November 30, 2023 | Health | F 0584 | Resident Rights Deficiencies | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
| November 30, 2023 | Health | F 0641 | Resident Assessment and Care Planning Deficiencies | Ensure each resident receives an accurate assessment. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
| November 30, 2023 | Health | F 0656 | Resident Assessment and Care Planning Deficiencies | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
| November 30, 2023 | Health | F 0677 | Quality of Life and Care Deficiencies | Provide care and assistance to perform activities of daily living for any resident who is unable. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
| November 30, 2023 | Health | F 0679 | Quality of Life and Care Deficiencies | Provide activities to meet all resident's needs. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
| November 30, 2023 | Health | F 0686 | Quality of Life and Care Deficiencies | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
| November 30, 2023 | Health | F 0695 | Quality of Life and Care Deficiencies | Provide safe and appropriate respiratory care for a resident when needed. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
| November 30, 2023 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | January 18, 2024 |
From the Care Compare health citations file NH_HealthCitations_Sep2026_2.csv, processed on September 1, 2026.
Penalties
| Penalty date | Type | Fine amount | Payment denial began | Payment denial, days | Fine ID |
|---|---|---|---|---|---|
| October 11, 2024 | Fine | $26,800 | 133782 | ||
| April 9, 2024 | Fine | $13,627 | 133772 |
From the Care Compare penalties file NH_Penalties_Sep2026_2.csv, processed on September 1, 2026.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | For profit - Corporation |
| Legal Business Name | PAHRUMP SNF OPERATIONS, LLC |
| Date First Approved to Provide Medicare and Medicaid Services | 2000-02-15 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | N |
| Urban | N |
| County/Parish | Nye |
| Telephone Number | 7757516600 |
| Chain Name | EVERGREEN HEALTHCARE GROUP |
| Chain ID | 846 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | Resident |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 120 |
| Average Number of Residents per Day | 101.8 |
| Overall Rating | 3 |
| Health Inspection Rating | 3 |
| QM Rating | 3 |
| Long-Stay QM Rating | 3 |
| Short-Stay QM Rating | 2 |
| Processing Date | 2026-08-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Aug2026.csv, processed on August 1, 2026.
Get an email when this record changes
One email a day naming what moved on PAHRUMP HEALTH AND REHABILITATION: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On August 29, 2025: A cost report was filed for fiscal year 2024, on form CMS-2540-10. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for PAHRUMP HEALTH AND REHABILITATION
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in Nevada at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in Nevada
- BRENTSVILLE DISTRICT HIGH SCHOOLS ADDITION AND REN, NOKESVILLE Water discharge permit
- CITY OF RENO, CITY OF SPARKS AND WASHOE COUNTY MS4, SPARKS Water discharge permit
- BIGHORN SOLAR PROJECT I, MOAPA Water discharge permit
- BIGHORN SOLAR PROJECT II, MOAPA Water discharge permit
- SOUTHERN BIGHORN SOLAR II PROJECT, MOAPA Water discharge permit
- SOUTHERN BIGHORN SOLAR I PROJECT, MOAPA Water discharge permit
- SUMMIT LAKE INDIAN RESERVATION, SUMMIT LAKE Water discharge permit
- NVE: MERCURY NORTHWEST 138- KV TRANSMISSION LINE RELOCATION AND REMOVAL PROJECT, NORTH LAS VEGAS Water discharge permit
- LHOIST NORTH AMERICA OF ARIZONA - APEX PLANT, LAS VEGAS Air emission source
- CERTAINTEED GYPSUM MANUFACTURING, INC., LAS VEGAS Air emission source
- CHEMICAL LIME CO- HENDERSON, HENDERSON Air emission source
- CLARK GENERATING STATION, LAS VEGAS Air emission source
- PABCO GYPSUM, LAS VEGAS Air emission source
- WELLS CARGO INC, LAS VEGAS Air emission source
- CALNEV PIPE LINE, LLC, LAS VEGAS Air emission source
- TITANIUM METALS CORPORATION HENDERSON FACILITY, HENDERSON Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 295075.