Skilled nursing facility · CMS certification number 305093
SULLIVAN COUNTY HEALTH CARE
UNITY, New Hampshire · Medicare and Medicaid
Certified beds, as filed in Care Compare: 156
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 2 · Fines: 1 · Fines, total amount: $16,153.00 · Payment denials: 1. The most recent penalty on file: June 6, 2025, Fine, $16,153. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for July 1, 2024 to June 30, 2025 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on December 19, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $15,070,139 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,371 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $15,068,768 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $18,977,530 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$3,908,762 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $5,126,452 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $1,217,690 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $1,217,690 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 56,940 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 1,467 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 34,755 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 10,166 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 46,388 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 15 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 57 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 31 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 103 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 97.8 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 609.74 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 450.37 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1445131, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2024, ended June 30, 2024
Cost report for July 1, 2023 to June 30, 2024 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on December 12, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,429,216 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | −$7,739 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $14,436,955 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $17,878,154 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$3,441,199 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $4,263,143 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $821,944 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $821,944 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 46,269 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 121 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 62.36 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 593.09 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 382.39 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1400830, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2023, ended June 30, 2023
Cost report for July 1, 2022 to June 30, 2023 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 18, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,786,317 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $849,237 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $13,937,080 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $18,036,802 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$4,099,722 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $3,019,275 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,080,447 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,080,447 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 44,073 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 139 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 103.35 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 463.02 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 317.07 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1372198, read from the public cost report file SNF10FY2022.zip.
Fiscal year 2022, ended June 30, 2022
Cost report for July 1, 2021 to June 30, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on February 3, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,605,571 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $145,421 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $13,460,150 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $15,321,914 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,861,764 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,749,835 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $888,071 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $380,429 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 43,130 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 112 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 65.09 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 584.43 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 385.09 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1341720, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2021, ended June 30, 2021
Cost report for July 1, 2020 to June 30, 2021 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 13, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,568,228 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $248,594 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $13,319,634 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $15,652,977 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$2,333,343 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,896,562 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $563,219 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $282,742 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 44,684 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 103 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 80.75 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 676.34 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 433.83 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1308846, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2020, ended June 30, 2020
Cost report for July 1, 2019 to June 30, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on January 19, 2021.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,609,299 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $105,919 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $14,503,380 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $15,073,787 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$570,407 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $3,363,682 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $2,793,275 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $2,150,344 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 50,026 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 129 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 97.83 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 602.04 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 387.8 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1278616, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2019, ended June 30, 2019
Cost report for July 1, 2018 to June 30, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 21, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,879,344 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $61,914 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $14,817,430 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $14,429,645 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $387,785 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $4,188,691 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $4,576,476 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $4,576,476 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 48,783 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 130 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 59.05 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 596.31 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 375.25 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1249623, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2018, ended June 30, 2018
Cost report for July 1, 2017 to June 30, 2018 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 24, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $15,351,401 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | −$12,501 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $15,363,902 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $14,048,284 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $1,315,618 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,487,975 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $3,803,593 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $3,226,346 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 49,255 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 155 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 59.17 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 649.37 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 317.77 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1217463, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2017, ended June 30, 2017
Cost report for July 1, 2016 to June 30, 2017 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 18, 2018.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $12,360,573 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | −$4,598 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $12,365,171 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $13,729,216 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,364,045 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,348,558 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $984,513 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $1,225,300 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 48,561 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 151 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 72.98 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 488.9 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 321.6 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1182050, read from the public cost report file SNF10FY2016.zip.
Fiscal year 2016, ended June 30, 2016
Cost report for July 1, 2015 to June 30, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on February 21, 2017.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,953,345 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | −$12,086 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $11,965,431 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $12,796,479 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$831,048 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,560,139 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $1,729,091 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $801,563 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 48,624 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 151 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 83.89 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 458.39 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 322.01 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1153200, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2015, ended June 30, 2015
Cost report for July 1, 2014 to June 30, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on December 22, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $12,209,721 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $55,342 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $12,154,379 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $13,213,047 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,058,668 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $3,670,392 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $2,611,724 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $1,675,943 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 50,859 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 124 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 60.92 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 664.48 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 410.15 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1116024, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2014, ended June 30, 2014
Cost report for July 1, 2013 to June 30, 2014 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 23, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,451,179 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $193,957 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $11,257,222 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $13,543,985 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$2,286,763 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $4,453,176 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $2,166,413 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $1,601,379 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 49,020 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 96 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 44.38 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 1,045.07 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 510.63 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1084823, read from the public cost report file SNF10FY2013.zip.
Fiscal year 2013, ended June 30, 2013
Cost report for July 1, 2012 to June 30, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on November 17, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,731,925 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $37,500 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $11,694,425 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $13,982,259 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$2,287,834 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $3,735,525 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $1,447,691 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $876,381 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 49,888 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 168 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 42.16 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 505.72 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 296.95 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1080337, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2012, ended June 30, 2012
Cost report for July 1, 2011 to June 30, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on June 20, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,435,795 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Net patient revenue | $11,435,795 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $13,949,429 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$2,513,634 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $3,879,904 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $1,366,270 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $988,863 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 49,666 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 116 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 72.63 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 660.68 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 428.16 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1036892, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2011, ended June 30, 2011
Cost report for July 1, 2010 to June 30, 2011 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on November 5, 2012.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $10,938,316 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $14,428,199 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$3,489,883 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $2,377,984 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$1,111,899 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 51,304 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 110 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 82.91 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 649.27 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 466.4 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 433591, read from the public cost report file SNFFY2010.zip.
Fiscal year 2010, ended June 30, 2010
Cost report for July 1, 2009 to June 30, 2010 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on February 11, 2011.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $11,791,276 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $13,074,756 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,283,480 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $462,715 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $4,644 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$825,409 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 51,367 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 145 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 50.98 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 551.15 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 354.26 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 393832, read from the public cost report file SNFFY2009.zip.
Fiscal year 2009, ended June 30, 2009
Cost report for July 1, 2008 to June 30, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on January 20, 2010.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $11,452,323 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $13,263,297 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,810,974 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $827,255 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$983,719 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 49,901 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 152 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 67.91 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 546.68 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 328.3 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 362662, read from the public cost report file SNFFY2008.zip.
Fiscal year 2008, ended June 30, 2008
Cost report for July 1, 2007 to June 30, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on April 22, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $10,810,170 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $12,004,267 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,194,097 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $471,575 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$722,522 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 48,419 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 151 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 88.73 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 481.7 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 320.66 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 337599, read from the public cost report file SNFFY2007.zip.
Fiscal year 2007, ended June 30, 2007
Cost report for July 1, 2006 to June 30, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on January 24, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $11,039,816 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $12,108,260 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,068,444 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $288,544 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $59 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$779,959 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 54,091 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 178 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 60.38 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 590.06 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 303.88 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 301074, read from the public cost report file SNFFY2006.zip.
Fiscal year 2006, ended June 30, 2006
Cost report for July 1, 2005 to June 30, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on July 31, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $9,937,690 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $11,031,432 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,093,742 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $289,691 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$804,051 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 51,704 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 77.68 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 621.33 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 382.99 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 290580, read from the public cost report file SNFFY2005.zip.
Fiscal year 2005, ended June 30, 2005
Cost report for July 1, 2004 to June 30, 2005 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on December 1, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $8,944,742 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,926,652 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,981,910 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $60,174 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$1,921,736 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 49,485 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 104 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 47.15 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 830.73 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 475.82 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 267407, read from the public cost report file SNFFY2004.zip.
Fiscal year 2004, ended June 30, 2004
Cost report for July 1, 2003 to June 30, 2004 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on October 31, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $9,120,738 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,732,419 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$611,681 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $60,174 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$551,507 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 52,592 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 85 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 121.67 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 974.28 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 618.73 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 235753, read from the public cost report file SNFFY2003.zip.
Fiscal year 2003, ended June 30, 2003
Cost report for July 1, 2002 to June 30, 2003 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on December 15, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $6,890,051 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,921,527 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$3,031,476 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $965,096 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$2,066,380 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 156 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 50,874 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 87 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 31.81 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 980.85 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 584.76 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 202519, read from the public cost report file SNFFY2002.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| LAGOS, MATTHEW | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 12/19/2022 |
| LAGOS, MATTHEW | W-2 MANAGING EMPLOYEE | Individual | NOT APPLICABLE | since 12/19/2022 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of SULLIVAN COUNTY COMMISSIONERS (enrollment ID O20060109000529).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| MATTHEW LAGOS | Individual | CORPORATE DIRECTOR | Not stated in the filing | 12/19/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SULLIVAN COUNTY COMMISSIONERS | Organization | OTHER | 100 | 9/15/2002 | Private equity company: No Real estate investment trust: No Holding company: No |
| MATTHEW LAGOS | Individual | W-2 MANAGING EMPLOYEE | Not stated in the filing | 12/19/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
Changes in ownership
- November 1, 2023: TED PURDY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
- November 1, 2023: TED PURDY no longer appears as DIRECTOR in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
- November 1, 2023: MATTHEW LAGOS (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on November 1, 2023; associated with this enrollment since December 19, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
- November 1, 2023: MATTHEW LAGOS (DIRECTOR) first listed in CMS’s Medicare enrollment ownership file on November 1, 2023; associated with this enrollment since December 19, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
Recent changes on this record
- December 19, 2025: A cost report was filed for fiscal year 2025, on form CMS-2540-10. SNF10FY2024.zip
- December 12, 2024: A cost report was filed for fiscal year 2024, on form CMS-2540-10. SNF10FY2023.zip
- January 18, 2024: A cost report was filed for fiscal year 2023, on form CMS-2540-10. SNF10FY2022.zip
- November 1, 2023: TED PURDY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
- November 1, 2023: TED PURDY no longer appears as DIRECTOR in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
- November 1, 2023: MATTHEW LAGOS (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on November 1, 2023; associated with this enrollment since December 19, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
- November 1, 2023: MATTHEW LAGOS (DIRECTOR) first listed in CMS’s Medicare enrollment ownership file on November 1, 2023; associated with this enrollment since December 19, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-11-01.csv
- February 3, 2023: A cost report was filed for fiscal year 2022, on form CMS-2540-10. SNF10FY2021.zip
- January 13, 2022: A cost report was filed for fiscal year 2021, on form CMS-2540-10. SNF10FY2020.zip
- January 19, 2021: A cost report was filed for fiscal year 2020, on form CMS-2540-10. SNF10FY2019.zip
- January 21, 2020: A cost report was filed for fiscal year 2019, on form CMS-2540-10. SNF10FY2018.zip
- January 24, 2019: A cost report was filed for fiscal year 2018, on form CMS-2540-10. SNF10FY2017.zip
- January 18, 2018: A cost report was filed for fiscal year 2017, on form CMS-2540-10. SNF10FY2016.zip
- February 21, 2017: A cost report was filed for fiscal year 2016, on form CMS-2540-10. SNF10FY2015.zip
- December 22, 2015: A cost report was filed for fiscal year 2015, on form CMS-2540-10. SNF10FY2014.zip
- January 23, 2015: A cost report was filed for fiscal year 2014, on form CMS-2540-10. SNF10FY2013.zip
- November 17, 2014: A cost report was filed for fiscal year 2013, on form CMS-2540-10. SNF10FY2012.zip
- June 20, 2013: A cost report was filed for fiscal year 2012, on form CMS-2540-10. SNF10FY2011.zip
- November 5, 2012: A cost report was filed for fiscal year 2011, on form CMS-2540-96. SNFFY2010.zip
- February 11, 2011: A cost report was filed for fiscal year 2010, on form CMS-2540-96. SNFFY2009.zip
- January 20, 2010: A cost report was filed for fiscal year 2009, on form CMS-2540-96. SNFFY2008.zip
- April 22, 2009: A cost report was filed for fiscal year 2008, on form CMS-2540-96. SNFFY2007.zip
- January 24, 2008: A cost report was filed for fiscal year 2007, on form CMS-2540-96. SNFFY2006.zip
- July 31, 2007: A cost report was filed for fiscal year 2006, on form CMS-2540-96. SNFFY2005.zip
- December 1, 2006: A cost report was filed for fiscal year 2005, on form CMS-2540-96. SNFFY2004.zip
- October 31, 2005: A cost report was filed for fiscal year 2004, on form CMS-2540-96. SNFFY2003.zip
- December 15, 2004: A cost report was filed for fiscal year 2003, on form CMS-2540-96. SNFFY2002.zip
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | December 11, 2025 | December 11, 2025 | 2 | 1 |
| 2 | October 16, 2024 | October 16, 2024 | 3 | 0 |
| 3 | October 19, 2023 | October 19, 2023 | 5 | 0 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
10 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| December 11, 2025 | Health | F 0657 | Resident Assessment and Care Planning Deficiencies | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | D | No | Deficient, Provider has date of correction | February 9, 2026 |
| December 11, 2025 | Health | F 0677 | Quality of Life and Care Deficiencies | Provide care and assistance to perform activities of daily living for any resident who is unable. | D | No | Deficient, Provider has date of correction | February 9, 2026 |
| June 6, 2025 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | J | Yes | Past Non-Compliance | June 4, 2025 |
| October 16, 2024 | Health | F 0641 | Resident Assessment and Care Planning Deficiencies | Ensure each resident receives an accurate assessment. | B | No | Deficient, Provider has date of correction | November 5, 2024 |
| October 16, 2024 | Health | F 0658 | Resident Assessment and Care Planning Deficiencies | Ensure services provided by the nursing facility meet professional standards of quality. | D | No | Deficient, Provider has date of correction | November 25, 2024 |
| January 4, 2024 | Health | F 0600 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Protect each resident from all types of abuse such as physical, mental, sexual abuse, physical punishment, and neglect by anybody. | D | Yes | Deficient, Provider has date of correction | January 31, 2024 |
| January 4, 2024 | Health | F 0609 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Timely report suspected abuse, neglect, or theft and report the results of the investigation to proper authorities. | D | Yes | Deficient, Provider has date of correction | January 31, 2024 |
| October 19, 2023 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | Yes | Deficient, Provider has date of correction | November 3, 2023 |
| October 19, 2023 | Health | F 0712 | Nursing and Physician Services Deficiencies | Ensure that the resident and his/her doctor meet face-to-face at all required visits. | E | No | Deficient, Provider has date of correction | February 23, 2024 |
| October 19, 2023 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | D | Yes | Deficient, Provider has date of correction | November 3, 2023 |
From the Care Compare health citations file NH_HealthCitations_Sep2026_2.csv, processed on September 1, 2026.
Penalties
| Penalty date | Type | Fine amount | Payment denial began | Payment denial, days | Fine ID |
|---|---|---|---|---|---|
| June 6, 2025 | Fine | $16,153 | 133828 | ||
| October 19, 2023 | Payment Denial | January 19, 2024 | 35 |
From the Care Compare penalties file NH_Penalties_Sep2026_2.csv, processed on September 1, 2026.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | Government - County |
| Legal Business Name | SULLIVAN COUNTY COMMISSIONERS |
| Date First Approved to Provide Medicare and Medicaid Services | 2002-09-15 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | N |
| Urban | N |
| County/Parish | Sullivan |
| Telephone Number | 6035429511 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | Resident |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 156 |
| Average Number of Residents per Day | 114.1 |
| Overall Rating | 4 |
| Health Inspection Rating | 4 |
| QM Rating | 2 |
| Long-Stay QM Rating | 3 |
| Short-Stay QM Rating | 1 |
| Processing Date | 2026-08-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Aug2026.csv, processed on August 1, 2026.
Get an email when this record changes
One email a day naming what moved on SULLIVAN COUNTY HEALTH CARE: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On December 19, 2025: A cost report was filed for fiscal year 2025, on form CMS-2540-10. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for SULLIVAN COUNTY HEALTH CARE
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in New Hampshire at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in New Hampshire
- HUDSON SAND & GRAVEL, LONDONDERRY Water discharge permit
- COAST TRANSPORTATION, DOVER Water discharge permit
- JAMES RIVER CORPORATION, BERLIN Water discharge permit
- K. W. THOMPSON TOOL CO., INC., ROCHESTER Water discharge permit
- BRIGHTON DRIVE SUBDIVISION, HAMPSTEAD Water discharge permit
- ALLENSTOWN AGGREGATES LLC, ALLENSTOWN Water discharge permit
- BRAEMOOR RIDGE, SALEM Water discharge permit
- ROUTE 16 RECONSTRUCTION, NEWINGTON Water discharge permit
- GLOBAL CONSTRUCTION CORP., GILFORD Air emission source
- CARBON FELT INC., CLAREMONT Air emission source
- NEWPORT SAND & GRAVEL CO., INC., NEWPORT Air emission source
- CROWN POINT CABINETRY, CLAREMONT Air emission source
- KENNEBEC LUMBER COMPANY - SPRINGFIELD, SPRINGFIELD Air emission source
- CANAM BRIDGES US INC., CLAREMONT Air emission source
- NEWPORT WASTEWATER TREATMENT FACILITY, NEWPORT Air emission source
- FRESENIUS KIDNEY CARE - CLAREMONT NH (#101190), CLAREMONT Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 305093.