Skilled nursing facility · CMS certification number 396074
ALLIED SERVICES SKILLED NURSING CENTER
SCRANTON, Pennsylvania · Medicare and Medicaid
Certified beds, as filed in Care Compare: 327
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 0 · Fines: 0 · Fines, total amount: $0.00 · Payment denials: 0. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for July 1, 2024 to June 30, 2025 — a reporting period of 364 days, on form CMS-2540-10, as submitted, processed by CMS on November 24, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $46,118,361 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $9,348,350 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $36,770,011 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $38,481,154 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,711,143 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,401,592 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $690,449 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $260,279 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 327 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 119,355 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 10,481 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 68,733 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 24,222 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 103,436 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 425 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 175 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 405 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 1,005 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 24.66 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 392.76 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 102.92 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1442881, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2024, ended June 30, 2024
Cost report for July 1, 2023 to June 30, 2024 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on February 4, 2026.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $40,713,026 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $6,182,488 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $34,530,538 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $34,378,024 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $152,514 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $621,023 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $773,537 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $443,049 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 327 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 92,866 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 890 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 23.23 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 418.99 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 104.34 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1447360, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2023, ended June 30, 2023
Cost report for July 1, 2022 to June 30, 2023 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on April 8, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $39,514,644 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $7,362,203 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $32,152,441 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $34,022,570 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,870,129 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,488,468 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $618,339 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $293,339 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 369 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 93,067 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 785 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 21.6 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 467.58 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 118.56 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1420844, read from the public cost report file SNF10FY2022.zip.
Fiscal year 2022, ended June 30, 2022
Cost report for July 1, 2021 to June 30, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on October 12, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $37,647,605 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $8,290,774 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $29,356,831 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $32,313,445 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$2,956,614 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $7,588,022 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $4,631,408 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $4,338,793 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 369 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 93,952 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 672 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 24.6 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 581.04 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 139.81 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1366643, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2021, ended June 30, 2021
Cost report for July 1, 2020 to June 30, 2021 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on October 17, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $34,638,227 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $7,003,332 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $27,634,895 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $31,118,208 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$3,483,313 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $4,292,373 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $809,060 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $159,060 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 369 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 88,545 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 651 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 32.19 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 502.46 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 136.01 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1335058, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2020, ended June 30, 2020
Cost report for July 1, 2019 to June 30, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on December 6, 2021.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $46,152,341 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $9,639,644 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $36,512,697 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $37,975,507 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,462,810 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,420,073 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $957,263 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $384,643 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 111,873 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 874 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 33.3 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 438.03 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 128 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1306397, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2019, ended June 30, 2019
Cost report for July 1, 2018 to June 30, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on September 14, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $51,723,932 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $13,344,722 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $38,379,210 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $38,004,798 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $374,412 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $347,399 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $721,811 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,303,824 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 121,101 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 979 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 32.4 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 468.84 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 123.7 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1267456, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2018, ended June 30, 2018
Cost report for July 1, 2017 to June 30, 2018 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on April 15, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $50,892,466 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $13,359,395 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $37,533,071 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $37,430,475 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $102,596 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $256,192 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $358,788 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $358,788 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 124,874 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 890 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 40.35 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 505.5 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 140.31 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1253736, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2017, ended June 30, 2017
Cost report for July 1, 2016 to June 30, 2017 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on June 19, 2018.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $50,661,385 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $13,620,550 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $37,040,835 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $37,733,267 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$692,432 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,679,880 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $987,448 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $987,448 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 125,061 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 830 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.86 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 594.47 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 150.68 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1194052, read from the public cost report file SNF10FY2016.zip.
Fiscal year 2016, ended June 30, 2016
Cost report for July 1, 2015 to June 30, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on October 17, 2017.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $50,325,185 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $14,180,049 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $36,145,136 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $37,392,789 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,247,653 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $389,792 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$857,861 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$994,357 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 122,678 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 682 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 43.61 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 1,718.91 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 179.88 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1176828, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2015, ended June 30, 2015
Cost report for July 1, 2014 to June 30, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on March 7, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $49,204,165 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $14,861,329 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $34,342,836 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $35,631,797 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,288,961 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $401,510 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$887,451 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$987,771 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 120,471 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 503 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 78.33 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 687.32 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 239.5 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1120005, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2014, ended June 30, 2014
Cost report for July 1, 2013 to June 30, 2014 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on October 16, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $49,918,963 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $15,165,025 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $34,753,938 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $35,298,630 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$544,692 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $418,457 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$126,235 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$126,235 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 120,023 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 561 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 65.39 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 784.63 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 213.94 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1111680, read from the public cost report file SNF10FY2013.zip.
Fiscal year 2013, ended June 30, 2013
Cost report for July 1, 2012 to June 30, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on August 28, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $50,012,393 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $15,289,652 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $34,722,741 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $34,731,264 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$8,523 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $269,397 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $260,874 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $260,874 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 120,842 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 648 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 57.45 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 526.11 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 186.48 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1077248, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2012, ended June 30, 2012
Cost report for July 1, 2011 to June 30, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on November 5, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $50,576,276 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $15,821,185 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $34,755,091 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $34,587,380 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $167,711 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $269,501 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $437,212 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $437,212 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 120,820 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 648 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 62.69 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 512.32 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 186.45 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1049680, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2011, ended June 30, 2011
Cost report for July 1, 2010 to June 30, 2011 — a reporting period of 364 days, on form CMS-2540-96, settled with audit, processed by CMS on February 22, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $34,283,226 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $32,885,313 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $1,397,913 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $270,640 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $1,668,553 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 120,921 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 737 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 45.06 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 480.59 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 164.07 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 434206, read from the public cost report file SNFFY2010.zip.
Fiscal year 2010, ended June 30, 2010
Cost report for July 1, 2009 to June 30, 2010 — a reporting period of 364 days, on form CMS-2540-96, reopened, processed by CMS on April 23, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $32,017,988 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $31,358,679 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $659,309 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $239,807 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $84,179 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: $814,937 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 122,215 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 705 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 50.56 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 513.77 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 173.35 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 434535, read from the public cost report file SNFFY2009.zip.
Fiscal year 2009, ended June 30, 2009
Cost report for July 1, 2008 to June 30, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on August 11, 2010.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $30,581,790 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $32,215,204 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,633,414 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $647,841 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $252,809 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$1,238,382 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 126,153 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 556 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 59.62 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 627.46 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 226.89 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 385116, read from the public cost report file SNFFY2008.zip.
Fiscal year 2008, ended June 30, 2008
Cost report for July 1, 2007 to June 30, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on September 29, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $30,854,179 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $31,624,580 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$770,401 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | −$360,623 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$1,131,024 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 371 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 127,162 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 641 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 48 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 518.32 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 198.38 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 357251, read from the public cost report file SNFFY2007.zip.
Fiscal year 2007, ended June 30, 2007
Cost report for July 1, 2006 to June 30, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on August 15, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $29,220,878 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $29,300,475 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$79,597 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $656,022 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $617,464 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$41,039 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 376 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 122,744 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 645 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 43.72 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 586.41 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 190.3 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 324145, read from the public cost report file SNFFY2006.zip.
Fiscal year 2006, ended June 30, 2006
Cost report for July 1, 2005 to June 30, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled with audit, processed by CMS on May 1, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $27,680,458 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $29,068,044 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$1,387,586 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $153,797 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $361,655 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$1,595,444 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 376 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 123,497 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 524 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 44 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 711.63 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 235.68 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 277598, read from the public cost report file SNFFY2005.zip.
Fiscal year 2005, ended June 30, 2005
Cost report for July 1, 2004 to June 30, 2005 — a reporting period of 364 days, on form CMS-2540-96, settled with audit, processed by CMS on July 12, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $29,971,535 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $30,327,742 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$356,207 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $115,283 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $200,148 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$441,072 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 376 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 123,182 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 524 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 45.11 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 711.63 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 235.08 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 257459, read from the public cost report file SNFFY2004.zip.
Fiscal year 2004, ended June 30, 2004
Cost report for July 1, 2003 to June 30, 2004 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on November 10, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $23,676,255 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $26,643,422 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$2,967,167 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $117,954 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $54,808 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$2,904,021 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 376 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 122,680 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 514 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 44.73 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 795.81 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 238.68 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 236561, read from the public cost report file SNFFY2003.zip.
Fiscal year 2003, ended June 30, 2003
Cost report for July 1, 2002 to June 30, 2003 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on March 19, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $19,897,027 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $24,489,171 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$4,592,144 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $176,770 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $200,652 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$4,616,026 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 376 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 118,467 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 499 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 37.01 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 685.31 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 237.41 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 171284, read from the public cost report file SNFFY2002.zip.
Fiscal year 2002, ended June 30, 2002
Cost report for July 1, 2001 to June 30, 2002 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on October 28, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $18,238,863 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $23,053,659 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$4,814,796 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $236,599 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $31,910 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$4,610,107 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 376 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 106,453 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 373 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 58.49 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 699.7 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 285.4 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 161998, read from the public cost report file SNFFY2001.zip.
Fiscal year 2001, ended June 30, 2001
Cost report for February 15, 2001 to June 30, 2001 — a reporting period of 135 days, not a full year, on form CMS-2540-96, settled, processed by CMS on February 13, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,909,304 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,960,636 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$2,051,332 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $21,448 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $70,952 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$2,100,836 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 376 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 36,175 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 99.33 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 1,329.91 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 602.92 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 128295, read from the public cost report file SNFFY2001.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| ALLIED SERVICES SKILLED NURSING CENTER | 5% OR GREATER DIRECT OWNERSHIP INTEREST | Organization | 100% | since 06/01/1994 |
| BOYLE, DOUGLAS | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2013 |
| CONABOY, WILLIAM | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2009 |
| DENAPLES, LOUIS | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2022 |
| FRANCESKI, GERALD | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2011 |
| KROGULSKI, KENNETH | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2011 |
| MELONE, THOMAS | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2013 |
| MUELLER, CHRISTINA | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2022 |
| MURRAY, JILL | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2022 |
| SCRANTON, WILLIAM | CORPORATE DIRECTOR | Individual | NOT APPLICABLE | since 01/01/2011 |
| AVVISATO, MICHAEL | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 01/01/2002 |
| CONABOY, WILLIAM | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 01/01/2009 |
| ALLIED HEALTH CARE SERVICES | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 06/01/1994 |
| ALLIED SERVICES FOUNDATION | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 06/01/1994 |
| ALLIED SERVICES SKILLED NURSING CENTER | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 06/01/1994 |
| AVVISATO, MICHAEL | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 01/01/2002 |
| CONABOY, WILLIAM | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 01/01/2009 |
| COONEY, JAMES | W-2 MANAGING EMPLOYEE | Individual | NOT APPLICABLE | since 09/01/2018 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of ALLIED SERVICES SKILLED NURSING CENTER (enrollment ID O20080325000132).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| ALLIED SERVICES FOUNDATION | Organization | 5% OR GREATER DIRECT OWNERSHIP INTEREST | 10 | 6/1/1994 | Private equity company: No Real estate investment trust: No Holding company: No |
| ALLIED SERVICES SKILLED NURSING CENTER | Organization | 5% OR GREATER DIRECT OWNERSHIP INTEREST | 100 | 6/1/1994 | Private equity company: No Real estate investment trust: No Holding company: No |
| CHRISTINA MUELLER | Individual | CORPORATE DIRECTOR | 10 | 1/1/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DOUGLAS BOYLE | Individual | CORPORATE DIRECTOR | Not stated in the filing | 1/1/2013 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| GERALD B FRANCESKI | Individual | CORPORATE DIRECTOR | Not stated in the filing | 1/1/2011 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JILL MURRAY | Individual | CORPORATE DIRECTOR | 10 | 1/1/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| KENNETH J KROGULSKI | Individual | CORPORATE DIRECTOR | Not stated in the filing | 1/1/2011 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| LOUIS DENAPLES | Individual | CORPORATE DIRECTOR | 10 | 1/1/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| THOMAS J MELONE | Individual | CORPORATE DIRECTOR | Not stated in the filing | 1/1/2013 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| WILLIAM P CONABOY | Individual | CORPORATE DIRECTOR | Not stated in the filing | 1/1/2009 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| WILLIAM W SCRANTON | Individual | CORPORATE DIRECTOR | Not stated in the filing | 1/1/2011 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHAEL E AVVISATO | Individual | CORPORATE OFFICER | Not stated in the filing | 1/1/2002 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| WILLIAM P CONABOY | Individual | CORPORATE OFFICER | Not stated in the filing | 1/1/2009 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ALLIED HEALTH CARE SERVICES | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 6/1/1994 | Private equity company: No Real estate investment trust: No Holding company: No |
| ALLIED SERVICES FOUNDATION | Organization | OPERATIONAL/MANAGERIAL CONTROL | 10 | 6/1/1994 | Private equity company: No Real estate investment trust: No Holding company: No |
| ALLIED SERVICES SKILLED NURSING CENTER | Organization | OPERATIONAL/MANAGERIAL CONTROL | 100 | 6/1/1994 | Private equity company: No Real estate investment trust: No Holding company: No |
| MICHAEL E AVVISATO | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 1/1/2002 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| WILLIAM P CONABOY | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 1/1/2009 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JAMES COONEY | Individual | W-2 MANAGING EMPLOYEE | 100 | 9/1/2018 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
Changes in ownership
- September 1, 2024: BILL F MCCABE no longer appears as DIRECTOR in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
Recent changes on this record
- July 28, 2026: A deficiency was cited under tag F 0554, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- February 4, 2026: A cost report was filed for fiscal year 2024, on form CMS-2540-10. SNF10FY2023.zip
- November 24, 2025: A cost report was filed for fiscal year 2025, on form CMS-2540-10. SNF10FY2024.zip
- April 8, 2025: A cost report was filed for fiscal year 2023, on form CMS-2540-10. SNF10FY2022.zip
- September 1, 2024: BILL F MCCABE no longer appears as DIRECTOR in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2024-09-01.csv
- October 12, 2023: A cost report was filed for fiscal year 2022, on form CMS-2540-10. SNF10FY2021.zip
- October 17, 2022: A cost report was filed for fiscal year 2021, on form CMS-2540-10. SNF10FY2020.zip
- December 6, 2021: A cost report was filed for fiscal year 2020, on form CMS-2540-10. SNF10FY2019.zip
- September 14, 2020: A cost report was filed for fiscal year 2019, on form CMS-2540-10. SNF10FY2018.zip
- April 15, 2020: A cost report was filed for fiscal year 2018, on form CMS-2540-10. SNF10FY2017.zip
- June 19, 2018: A cost report was filed for fiscal year 2017, on form CMS-2540-10. SNF10FY2016.zip
- October 17, 2017: A cost report was filed for fiscal year 2016, on form CMS-2540-10. SNF10FY2015.zip
- March 7, 2016: A cost report was filed for fiscal year 2015, on form CMS-2540-10. SNF10FY2014.zip
- October 16, 2015: A cost report was filed for fiscal year 2014, on form CMS-2540-10. SNF10FY2013.zip
- August 28, 2014: A cost report was filed for fiscal year 2013, on form CMS-2540-10. SNF10FY2012.zip
- November 5, 2013: A cost report was filed for fiscal year 2012, on form CMS-2540-10. SNF10FY2011.zip
- April 23, 2013: A cost report was filed for fiscal year 2010, on form CMS-2540-96. SNFFY2009.zip
- February 22, 2013: A cost report was filed for fiscal year 2011, on form CMS-2540-96. SNFFY2010.zip
- August 11, 2010: A cost report was filed for fiscal year 2009, on form CMS-2540-96. SNFFY2008.zip
- September 29, 2009: A cost report was filed for fiscal year 2008, on form CMS-2540-96. SNFFY2007.zip
- August 15, 2008: A cost report was filed for fiscal year 2007, on form CMS-2540-96. SNFFY2006.zip
- May 1, 2007: A cost report was filed for fiscal year 2006, on form CMS-2540-96. SNFFY2005.zip
- July 12, 2006: A cost report was filed for fiscal year 2005, on form CMS-2540-96. SNFFY2004.zip
- November 10, 2005: A cost report was filed for fiscal year 2004, on form CMS-2540-96. SNFFY2003.zip
- March 19, 2004: A cost report was filed for fiscal year 2003, on form CMS-2540-96. SNFFY2002.zip
- October 28, 2003: A cost report was filed for fiscal year 2002, on form CMS-2540-96. SNFFY2001.zip
- February 13, 2003: A cost report was filed for fiscal year 2001, on form CMS-2540-96. SNFFY2001.zip
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | May 1, 2026 | May 1, 2026 | 9 | 4 |
| 2 | July 18, 2025 | July 18, 2025 | 5 | 5 |
| 3 | September 20, 2024 | September 20, 2024 | 10 | 2 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
24 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| July 28, 2026 | Health | F 0554 | Resident Rights Deficiencies | Allow residents to self-administer drugs if determined clinically appropriate. | D | Yes | Deficient, Provider has no plan of correction | |
| May 1, 2026 | Health | F 0641 | Resident Assessment and Care Planning Deficiencies | Ensure each resident receives an accurate assessment. | D | No | Deficient, Provider has date of correction | May 27, 2026 |
| May 1, 2026 | Health | F 0656 | Resident Assessment and Care Planning Deficiencies | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | D | No | Deficient, Provider has date of correction | May 27, 2026 |
| May 1, 2026 | Health | F 0657 | Resident Assessment and Care Planning Deficiencies | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | D | No | Deficient, Provider has date of correction | May 27, 2026 |
| May 1, 2026 | Health | F 0658 | Resident Assessment and Care Planning Deficiencies | Ensure services provided by the nursing facility meet professional standards of quality. | D | No | Deficient, Provider has date of correction | May 27, 2026 |
| May 1, 2026 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | No | Deficient, Provider has date of correction | May 27, 2026 |
| May 1, 2026 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | E | No | Deficient, Provider has date of correction | May 27, 2026 |
| May 1, 2026 | Health | F 0940 | Administration Deficiencies | Develop, implement, and/or maintain an effective training program for all new and existing staff members. | D | No | Deficient, Provider has date of correction | May 27, 2026 |
| March 11, 2026 | Health | F 0686 | Quality of Life and Care Deficiencies | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | D | Yes | Deficient, Provider has date of correction | May 27, 2026 |
| July 18, 2025 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | Yes | Deficient, Provider has date of correction | September 2, 2025 |
| July 18, 2025 | Health | F 0690 | Quality of Life and Care Deficiencies | Provide appropriate care for residents who are continent or incontinent of bowel/bladder, appropriate catheter care, and appropriate care to prevent urinary tract infections. | D | No | Deficient, Provider has date of correction | September 2, 2025 |
| July 18, 2025 | Health | F 0692 | Quality of Life and Care Deficiencies | Provide enough food/fluids to maintain a resident's health. | D | No | Deficient, Provider has date of correction | September 2, 2025 |
| July 18, 2025 | Health | F 0697 | Quality of Life and Care Deficiencies | Provide safe, appropriate pain management for a resident who requires such services. | D | No | Deficient, Provider has date of correction | September 2, 2025 |
| July 18, 2025 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | September 2, 2025 |
| September 20, 2024 | Health | F 0656 | Resident Assessment and Care Planning Deficiencies | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | E | No | Deficient, Provider has date of correction | November 5, 2024 |
| September 20, 2024 | Health | F 0658 | Resident Assessment and Care Planning Deficiencies | Ensure services provided by the nursing facility meet professional standards of quality. | E | No | Deficient, Provider has date of correction | November 5, 2024 |
| September 20, 2024 | Health | F 0660 | Resident Assessment and Care Planning Deficiencies | Plan the resident's discharge to meet the resident's goals and needs. | D | No | Deficient, Provider has date of correction | November 5, 2024 |
| September 20, 2024 | Health | F 0694 | Quality of Life and Care Deficiencies | Provide for the safe, appropriate administration of IV fluids for a resident when needed. | E | No | Deficient, Provider has date of correction | November 5, 2024 |
| September 20, 2024 | Health | F 0695 | Quality of Life and Care Deficiencies | Provide safe and appropriate respiratory care for a resident when needed. | D | No | Deficient, Provider has date of correction | November 5, 2024 |
| September 20, 2024 | Health | F 0699 | Quality of Life and Care Deficiencies | Provide care or services that was trauma informed and/or culturally competent. | D | No | Deficient, Provider has date of correction | November 5, 2024 |
| September 20, 2024 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | E | No | Deficient, Provider has date of correction | November 5, 2024 |
| September 20, 2024 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | November 5, 2024 |
| April 30, 2024 | Health | F 0656 | Resident Assessment and Care Planning Deficiencies | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | D | Yes | Deficient, Provider has date of correction | June 4, 2024 |
| April 30, 2024 | Health | F 0755 | Pharmacy Service Deficiencies | Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist. | E | Yes | Deficient, Provider has date of correction | June 4, 2024 |
From the Care Compare health citations file NH_HealthCitations_Sep2026_2.csv, processed on September 1, 2026.
Penalties
No penalty on file for this facility in CMS’s Care Compare penalties data.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | Non profit - Corporation |
| Legal Business Name | ALLIED SERVICES SKILLED NURSING CENTER |
| Date First Approved to Provide Medicare and Medicaid Services | 2001-02-15 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | Y |
| Urban | Y |
| County/Parish | Lackawanna |
| Telephone Number | 5703481424 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | Resident |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 327 |
| Average Number of Residents per Day | 288.7 |
| Overall Rating | 3 |
| Health Inspection Rating | 3 |
| QM Rating | 4 |
| Long-Stay QM Rating | 5 |
| Short-Stay QM Rating | 3 |
| Processing Date | 2026-09-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Sep2026_3.csv, processed on September 1, 2026.
Get an email when this record changes
One email a day naming what moved on ALLIED SERVICES SKILLED NURSING CENTER: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On July 28, 2026: A deficiency was cited under tag F 0554, scope and severity D. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for ALLIED SERVICES SKILLED NURSING CENTER
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in Pennsylvania at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in Pennsylvania
- HENKELS & MCCOY BLUE BELL FAC, BLUE BELL Water discharge permit
- JOHNSON MATTHEY WAYNE PLT, WAYNE Water discharge permit
- FLUID ENERGY PROC & EQUIP HATFIELD FAC, HATFIELD Water discharge permit
- SCHRAMM WEST CHESTER FACILITY, WEST CHESTER Water discharge permit
- JOHN MEDERNACH & CO INC, WHITEHALL Water discharge permit
- GENTEX CORPORATION, SIMPSON Water discharge permit
- HAZLETON PUMPS, HAZLETON Water discharge permit
- KOEHLER BRIGHT STAR INC, WILKES BARRE Water discharge permit
- NORTHEAST PAVING COMPANY / BRIDGEVILLE ASPHALT PLANT, BRIDGEVILLE Air emission source
- UNIVERSAL STAINLESS & ALLOY PROD/BRIDGEV, BRIDGEVILLE Air emission source
- THE DAILY NEWS PUBLISHING CO., MCKEESPORT, CITY OF Air emission source
- UNIV OF PGH/PGH CAMPUS, PITTSBURGH Air emission source
- BASIC CARBIDE CORP/BUENA VISTA, BUENA VISTA Air emission source
- NEVILLE CHEM CO/PGH, PITTSBURGH Air emission source
- VERIZON PA/DOWNTOWN 1C BLDG, PITTSBURGH Air emission source
- TRIUMPH INTERIORS, INC., OAKDALE Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 396074.