Skilled nursing facility · CMS certification number 465059
Mission at Richfield Nursing and Rehabilitation
Richfield, Utah · Medicare and Medicaid
Certified beds, as filed in Care Compare: 98
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 1 · Fines: 1 · Fines, total amount: $8,148.00 · Payment denials: 0. The most recent penalty on file: February 7, 2024, Fine, $8,148. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for July 1, 2024 to June 30, 2025 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on February 20, 2026.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $4,205,019 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $333,014 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,872,005 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,590,547 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$718,542 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $353,435 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$365,107 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$365,107 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 35,770 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 451 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 8,506 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 2,937 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 11,894 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 8 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 31 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 67 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 106 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 56.38 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 274.39 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 112.21 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1448016, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2024, ended June 30, 2024
Cost report for July 1, 2023 to June 30, 2024 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on September 23, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $4,418,293 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $50,434 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,367,859 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,881,762 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$513,903 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $61,331 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$452,572 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$452,572 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 12,874 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 112 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 47.59 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 243.49 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 114.95 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1440019, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2023, ended June 30, 2023
Cost report for July 1, 2022 to June 30, 2023 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on February 23, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $6,544,798 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,597,109 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,947,689 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,317,774 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$370,085 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $75,873 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$294,212 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$294,212 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 14,109 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 118 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 43.32 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 241.91 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 119.57 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1373791, read from the public cost report file SNF10FY2022.zip.
Fiscal year 2022, ended June 30, 2022
Cost report for July 1, 2021 to June 30, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on April 19, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $6,193,431 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,211,495 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,981,936 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,133,065 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$151,129 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $132,836 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$18,293 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$18,293 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 15,133 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 109 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 41.61 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 246.13 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 138.83 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1376600, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2021, ended June 30, 2021
Cost report for July 1, 2020 to June 30, 2021 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on May 19, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,620,692 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $815,243 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,805,449 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,734,593 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $70,856 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $249,483 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $320,339 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $320,339 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 14,966 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 92 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 33.74 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 305.84 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 162.67 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1347817, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2020, ended June 30, 2020
Cost report for July 1, 2019 to June 30, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on February 28, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,214,184 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $853,577 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,360,607 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,197,802 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $162,805 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $152,623 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $315,428 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $315,428 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 16,692 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 86 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 56.96 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 348.55 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 194.09 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1311021, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2019, ended June 30, 2019
Cost report for July 1, 2018 to June 30, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on April 21, 2021.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $4,636,983 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $453,523 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,183,460 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,136,550 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $46,910 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $71,436 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $118,346 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $118,346 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 16,692 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 114 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 52.97 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 267.29 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 146.42 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1282700, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2018, ended June 30, 2018
Cost report for July 1, 2017 to June 30, 2018 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on February 11, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $4,020,474 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $313,101 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,707,373 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,883,039 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$175,666 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $71,189 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$104,477 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$104,477 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 16,077 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 129 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 54.48 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 169.08 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 124.63 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1219427, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2017, ended June 30, 2017
Cost report for July 1, 2016 to June 30, 2017 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on June 11, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $3,719,738 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | −$36,737 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,756,475 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,840,828 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$84,353 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $91,322 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $6,969 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $6,969 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient days, all components | 16,348 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 102 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 55.21 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 306.15 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 160.27 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1227919, read from the public cost report file SNF10FY2016.zip.
Fiscal year 2016, ended June 30, 2016
Cost report for July 1, 2015 to June 30, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on April 26, 2017.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $4,002,931 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $32,181 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,970,750 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,923,866 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $46,884 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $37,349 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $84,233 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $84,233 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 15,843 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 126 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 52.47 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 310.29 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 125.74 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1156405, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2015, ended June 30, 2015
Cost report for July 1, 2014 to June 30, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on August 26, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $3,827,647 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $24,422 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,803,225 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,694,842 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $108,383 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $61,365 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $169,748 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $169,748 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 14,505 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 138 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 51.33 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 223 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 105.11 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1142652, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2014, ended June 30, 2014
Cost report for July 1, 2013 to June 30, 2014 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 30, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $4,006,153 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $103,985 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,902,168 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,944,978 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$42,810 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $127,111 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $84,301 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $84,301 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 16,475 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 133 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 46.16 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 301.31 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 123.87 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1106166, read from the public cost report file SNF10FY2013.zip.
Fiscal year 2013, ended June 30, 2013
Cost report for July 1, 2012 to June 30, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on May 28, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $3,679,294 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $13,122 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,666,172 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,960,524 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$294,352 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $44,545 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$249,807 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$249,807 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 16,732 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 127 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 45.79 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 378.4 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 131.75 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1092000, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2012, ended June 30, 2012
Cost report for July 1, 2011 to June 30, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on May 16, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $3,890,022 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $86,192 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,803,830 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,084,399 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$280,569 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $70,523 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$210,046 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$210,046 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 19,042 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 53 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 55.68 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 3,771.25 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 359.28 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1060005, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2011, ended June 30, 2011
Cost report for July 1, 2010 to June 30, 2011 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on November 8, 2012.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,941,479 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,226,184 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$284,705 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $49,930 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$234,775 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 17,513 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 106 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 72.45 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 401.2 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 165.22 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 433630, read from the public cost report file SNFFY2010.zip.
Fiscal year 2010, ended June 30, 2010
Cost report for July 1, 2009 to June 30, 2010 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on September 30, 2011.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,506,391 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,527,394 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$21,003 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $74,122 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $53,119 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 19,378 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 143 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 58.99 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 404.53 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 135.51 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 418721, read from the public cost report file SNFFY2009.zip.
Fiscal year 2009, ended June 30, 2009
Cost report for July 1, 2008 to June 30, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on October 18, 2010.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,467,878 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,118,951 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $348,927 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $98,420 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $447,347 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 21,143 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 132 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 51.77 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 421.41 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 160.17 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 388636, read from the public cost report file SNFFY2008.zip.
Fiscal year 2008, ended June 30, 2008
Cost report for July 1, 2007 to June 30, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on February 13, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,469,890 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,983,214 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $486,676 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $68,307 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $554,983 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 22,744 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 152 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 42.37 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 388.28 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 149.63 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 333567, read from the public cost report file SNFFY2007.zip.
Fiscal year 2007, ended June 30, 2007
Cost report for July 1, 2006 to June 30, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on February 15, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,812,285 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,328,412 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $483,873 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $4,833 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $488,706 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 26,985 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 187 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 43.78 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 355.06 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 144.3 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 302324, read from the public cost report file SNFFY2006.zip.
Fiscal year 2006, ended June 30, 2006
Cost report for July 1, 2005 to June 30, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on November 20, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,217,374 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,120,252 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $1,097,122 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $6,969 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $1,104,091 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 29,386 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 243 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 43.83 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 249.86 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 120.93 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 296702, read from the public cost report file SNFFY2005.zip.
Fiscal year 2005, ended June 30, 2005
Cost report for January 1, 2005 to June 30, 2005 — a reporting period of 180 days, not a full year, on form CMS-2540-96, as submitted, processed by CMS on February 3, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,336,597 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $1,921,653 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $414,944 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $10,409 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $425,353 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 13,832 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 94 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 39.53 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 287.91 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 147.15 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 242336, read from the public cost report file SNFFY2005.zip.
Fiscal year 2004, ended December 31, 2004
Cost report for January 1, 2004 to December 31, 2004 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on March 31, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,377,711 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,734,709 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $643,002 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $18,137 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $661,139 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 27,817 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 188 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 53.15 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 322.79 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 147.96 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 246498, read from the public cost report file SNFFY2004.zip.
Fiscal year 2003, ended September 21, 2003
Cost report for January 1, 2003 to September 21, 2003 — a reporting period of 263 days, not a full year, on form CMS-2540-96, settled, processed by CMS on October 17, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,684,170 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,580,308 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $103,862 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $4,646 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $482 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: $108,026 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 21,602 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 118 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 33.13 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 540 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 183.07 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 234451, read from the public cost report file SNFFY2003.zip.
Fiscal year 2002, ended December 31, 2002
Cost report for January 1, 2002 to December 31, 2002 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on March 5, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,880,780 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,582,320 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $298,460 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $6,875 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $825 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: $304,510 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,726 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 173 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 40.48 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 503.76 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 189.17 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 170299, read from the public cost report file SNFFY2002.zip.
Fiscal year 2000, ended December 31, 2000
Cost report for January 1, 2000 to December 31, 2000 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on February 8, 2002.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,556,012 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,216,932 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $1,339,080 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $7,078 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $188 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: $1,345,970 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 33,458 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 212 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 45.66 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 285.74 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 157.82 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 52077, read from the public cost report file SNFFY2000.zip.
Fiscal year 1999, ended December 31, 1999
Cost report for January 1, 1999 to December 31, 1999 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on October 26, 2000.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,190,972 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,329,179 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $861,793 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $11,516 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $1,030 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: $872,279 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 33,648 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 266 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 44.5 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 182.92 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 126.5 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 66435, read from the public cost report file SNFFY1999.zip.
Fiscal year 1998, ended December 31, 1998
Cost report for January 1, 1998 to December 31, 1998 — a reporting period of 364 days, on form CMS-2540-96, reopened, processed by CMS on February 11, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,985,096 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,397,742 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $587,354 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $19,520 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $606,874 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 33,523 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 242 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 37.92 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 254.54 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 138.52 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 114362, read from the public cost report file SNFFY1998.zip.
Fiscal year 1997, ended December 31, 1997
Cost report for January 1, 1997 to December 31, 1997 — a reporting period of 364 days, on form CMS-2540-96, reopened, processed by CMS on November 21, 2000.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $4,213,640 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,148,533 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $1,065,107 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $12,426 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $1,205 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: $1,076,328 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,923 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 191 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 55.6 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 414.75 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 172.37 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 66430, read from the public cost report file SNFFY1997.zip.
Fiscal year 1996, ended December 31, 1996
Cost report for January 1, 1996 to December 31, 1996 — a reporting period of 365 days, on form CMS-2540-96, reopened, processed by CMS on March 22, 2000.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,779,956 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,029,788 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $750,168 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $9,088 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $759,256 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 98 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,502 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 218 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 47.37 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 244.96 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 149.09 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 66428, read from the public cost report file SNFFY1996.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| BARTHOLOMEW, CHASE | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| GUNNISON VALLEY HOSPITAL | ADP OF THE SNF | Organization | NOT APPLICABLE | since 04/14/2025 |
| KEELE, EDDIE | ADP OF THE SNF | Individual | NOT APPLICABLE | since 06/11/2025 |
| MISSION HEALTH SERVICES | ADP OF THE SNF | Organization | NOT APPLICABLE | since 06/11/2025 |
| OVERLY, DALLAS | ADP OF THE SNF | Individual | NOT APPLICABLE | since 06/11/2025 |
| SHAW, KATHY | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| ZIMBELMAN, MICHELLE | ADP OF THE SNF | Individual | NOT APPLICABLE | since 06/11/2025 |
| KEELE, EDDIE | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 06/11/2025 |
| MURRAY, BRIAN | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 07/01/2020 |
| ZIMBELMAN, MICHELLE | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 06/11/2025 |
| GUNNISON VALLEY HOSPITAL | DIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 07/01/2020 |
| BARTHOLOMEW, CHASE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| GUNNISON VALLEY HOSPITAL | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 07/01/2020 |
| KEELE, EDDIE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 06/11/2025 |
| MISSION HEALTH SERVICES | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 06/11/2025 |
| OVERLY, DALLAS | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 10/01/2025 |
| SHAW, KATHY | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| ZIMBELMAN, MICHELLE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 06/11/2025 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of GUNNISON VALLEY HOSPITAL (enrollment ID O20200706001479).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| CHASE C BARTHOLOMEW | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DALLAS C OVERLY | Individual | ADP OF THE SNF | Not stated in the filing | 6/11/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| EDDIE KEELE | Individual | ADP OF THE SNF | Not stated in the filing | 6/11/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| GUNNISON VALLEY HOSPITAL | Organization | ADP OF THE SNF | Not stated in the filing | 4/14/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| KATHY SHAW | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHELLE ZIMBELMAN | Individual | ADP OF THE SNF | Not stated in the filing | 6/11/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MISSION HEALTH SERVICES | Organization | ADP OF THE SNF | Not stated in the filing | 6/11/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| No owner named in the filing | Organization | ADP OF THE SNF | Not stated in the filing | 6/11/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| No owner named in the filing | Organization | ADP OF THE SNF | Not stated in the filing | 9/11/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| BRIAN C MURRAY | Individual | CORPORATE OFFICER | Not stated in the filing | 7/1/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| EDDIE KEELE | Individual | CORPORATE OFFICER | 100 | 6/11/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHELLE ZIMBELMAN | Individual | CORPORATE OFFICER | Not stated in the filing | 6/11/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| GUNNISON VALLEY HOSPITAL | Organization | DIRECT OWNERSHIP INTEREST | 100 | 7/1/2020 | Private equity company: No Real estate investment trust: No Holding company: No |
| CHASE C BARTHOLOMEW | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DALLAS C OVERLY | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 10/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| EDDIE KEELE | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 6/11/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| GUNNISON VALLEY HOSPITAL | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 7/1/2020 | Private equity company: No Real estate investment trust: No Holding company: No |
| KATHY SHAW | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHELLE ZIMBELMAN | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 6/11/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MISSION HEALTH SERVICES | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 6/11/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
Changes in ownership
- April 1, 2026: JOSHUA PEEKS no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: JOSHUA PEEKS no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: DALLAS C OVERLY (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on April 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: DALLAS C OVERLY (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on April 1, 2026; associated with this enrollment since October 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- February 1, 2026: HEALTH GROUP MANAGEMENT LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: HEALTH GROUP MANAGEMENT LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: TRAVIS CLAWSON no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: TRAVIS CLAWSON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BRETT P ROBERTSON no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BRETT P ROBERTSON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LINDSAY FRAGOSO no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LINDSAY FRAGOSO no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT REAL ESTATE SOUTH SALT LAKE LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT REAL ESTATE SOUTH SALT LAKE LLC no longer appears as 5% OR GREATER MORTGAGE INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: JASON J SEASTRAND no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: JASON J SEASTRAND no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHEN BLAKE MARRIOTT no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHEN BLAKE MARRIOTT no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH PROPERTIES LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH PROPERTIES LLC no longer appears as 5% OR GREATER MORTGAGE INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHANIE ESPINOSA no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHANIE ESPINOSA no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH GROUP LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH GROUP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SPENCER R SAMUELIAN no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SPENCER R SAMUELIAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CHRISTIAN R WEST no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CHRISTIAN R WEST no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MISSION HEALTH SERVICES (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MISSION HEALTH SERVICES (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MICHELLE ZIMBELMAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MICHELLE ZIMBELMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MICHELLE ZIMBELMAN (CORPORATE OFFICER) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: A listing under ADP OF THE SNF, with no owner named, first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: EDDIE KEELE (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: EDDIE KEELE (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: EDDIE KEELE (CORPORATE OFFICER) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- September 1, 2025: SANDSTONE UT HOLDCO OP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: SANDSTONE HEALTHCARE GROUP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: BRIAN C MURRAY no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: BRIAN C MURRAY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: DOUGLAS B TAYLOR no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: RICHFIELD NURSING & REHAB LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: JENNIFER SPECTOR no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: JENNIFER SPECTOR no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: JENNIFER SPECTOR no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: HEALTH GROUP MANAGEMENT LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since April 14, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: HEALTH GROUP MANAGEMENT LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: TRAVIS CLAWSON (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: TRAVIS CLAWSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: BRETT P ROBERTSON (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: BRETT P ROBERTSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: CHASE C BARTHOLOMEW (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: CHASE C BARTHOLOMEW (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: LINDSAY FREGOSO (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: LINDSAY FREGOSO (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: MONUMENT REAL ESTATE SOUTH SALT LAKE LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: MONUMENT REAL ESTATE SOUTH SALT LAKE LLC (5% OR GREATER MORTGAGE INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: JASON J SEASTRAND (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: JASON J SEASTRAND (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: KATHY SHAW (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: KATHY SHAW (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: STEPHEN BLAKE MARRIOTT (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: STEPHEN BLAKE MARRIOTT (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: MONUMENT HEALTH PROPERTIES LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: MONUMENT HEALTH PROPERTIES LLC (5% OR GREATER MORTGAGE INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: JOSHUA PEEKS (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: JOSHUA PEEKS (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: STEPHANIE ESPINOSA (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: STEPHANIE ESPINOSA (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: MONUMENT HEALTH GROUP LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since April 14, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: MONUMENT HEALTH GROUP LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: SPENCER R SAMUELIAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: SPENCER R SAMUELIAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: GUNNISON VALLEY HOSPITAL (DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since July 1, 2020. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: GUNNISON VALLEY HOSPITAL (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since April 14, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: CHRISTIAN R WEST (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- September 1, 2025: CHRISTIAN R WEST (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on September 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
- July 17, 2023: ANNE H STUART no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: ANNE H STUART no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: AVALON HOLDING, INC. no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: MARK FREDERICK DALLEY no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: MARK FREDERICK DALLEY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: MARK FREDERICK DALLEY no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: AVALON CARE LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: RICHFIELD CARE CENTER, LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: HEATHER A HUTCHINGS no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: HEATHER A HUTCHINGS no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: CHARLES R KIRTON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: CHARLES R KIRTON no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: SANDSTONE UT HOLDCO OP LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on July 17, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: SANDSTONE HEALTHCARE GROUP LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on July 17, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: DOUGLAS B TAYLOR (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on July 17, 2023; associated with this enrollment since October 25, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: RICHFIELD NURSING & REHAB LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on July 17, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: JENNIFER SPECTOR (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on July 17, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: JENNIFER SPECTOR (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on July 17, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
- July 17, 2023: JENNIFER SPECTOR (CONTRACTED MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on July 17, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-07-17.csv
Recent changes on this record
- April 1, 2026: JOSHUA PEEKS no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: JOSHUA PEEKS no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: DALLAS C OVERLY (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on April 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- April 1, 2026: DALLAS C OVERLY (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on April 1, 2026; associated with this enrollment since October 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-04-01.csv
- February 20, 2026: A cost report was filed for fiscal year 2025, on form CMS-2540-10. SNF10FY2024.zip
- February 1, 2026: HEALTH GROUP MANAGEMENT LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: HEALTH GROUP MANAGEMENT LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: TRAVIS CLAWSON no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: TRAVIS CLAWSON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BRETT P ROBERTSON no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: BRETT P ROBERTSON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LINDSAY FRAGOSO no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: LINDSAY FRAGOSO no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT REAL ESTATE SOUTH SALT LAKE LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT REAL ESTATE SOUTH SALT LAKE LLC no longer appears as 5% OR GREATER MORTGAGE INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: JASON J SEASTRAND no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: JASON J SEASTRAND no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHEN BLAKE MARRIOTT no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHEN BLAKE MARRIOTT no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH PROPERTIES LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH PROPERTIES LLC no longer appears as 5% OR GREATER MORTGAGE INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHANIE ESPINOSA no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: STEPHANIE ESPINOSA no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH GROUP LLC no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MONUMENT HEALTH GROUP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SPENCER R SAMUELIAN no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: SPENCER R SAMUELIAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CHRISTIAN R WEST no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: CHRISTIAN R WEST no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MISSION HEALTH SERVICES (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MISSION HEALTH SERVICES (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MICHELLE ZIMBELMAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MICHELLE ZIMBELMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: MICHELLE ZIMBELMAN (CORPORATE OFFICER) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: A listing under ADP OF THE SNF, with no owner named, first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: EDDIE KEELE (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: EDDIE KEELE (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- February 1, 2026: EDDIE KEELE (CORPORATE OFFICER) first listed in CMS’s Medicare enrollment ownership file on February 1, 2026; associated with this enrollment since June 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-02-01.csv
- September 23, 2025: A cost report was filed for fiscal year 2024, on form CMS-2540-10. SNF10FY2023.zip
- September 1, 2025: SANDSTONE UT HOLDCO OP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-09-01.csv
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | February 7, 2024 | February 7, 2024 | 5 | 2 |
| 2 | June 15, 2022 | June 15, 2022 | 2 | 0 |
| 3 | January 9, 2020 | January 9, 2020 | 12 | 0 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
20 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| June 11, 2026 | Health | F 0600 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Protect each resident from all types of abuse such as physical, mental, sexual abuse, physical punishment, and neglect by anybody. | G | Yes | Deficient, Provider has no plan of correction | |
| June 11, 2026 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | Yes | Deficient, Provider has no plan of correction | |
| June 11, 2026 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | Yes | Deficient, Provider has no plan of correction | |
| February 7, 2024 | Health | F 0609 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Timely report suspected abuse, neglect, or theft and report the results of the investigation to proper authorities. | D | No | Deficient, Provider has date of correction | March 5, 2024 |
| February 7, 2024 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | G | Yes | Deficient, Provider has date of correction | March 5, 2024 |
| February 7, 2024 | Health | F 0881 | Infection Control Deficiencies | Implement a program that monitors antibiotic use. | D | No | Deficient, Provider has date of correction | March 5, 2024 |
| June 15, 2022 | Health | F 0550 | Resident Rights Deficiencies | Honor the resident's right to a dignified existence, self-determination, communication, and to exercise his or her rights. | D | No | Deficient, Provider has date of correction | July 6, 2022 |
| June 15, 2022 | Health | F 0558 | Resident Rights Deficiencies | Reasonably accommodate the needs and preferences of each resident. | D | No | Deficient, Provider has date of correction | July 6, 2022 |
| January 9, 2020 | Health | F 0554 | Resident Rights Deficiencies | Allow residents to self-administer drugs if determined clinically appropriate. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0584 | Resident Rights Deficiencies | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0656 | Resident Assessment and Care Planning Deficiencies | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | E | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0676 | Quality of Life and Care Deficiencies | Ensure residents do not lose the ability to perform activities of daily living unless there is a medical reason. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0686 | Quality of Life and Care Deficiencies | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | G | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0693 | Quality of Life and Care Deficiencies | Ensure that feeding tubes are not used unless there is a medical reason and the resident agrees; and provide appropriate care for a resident with a feeding tube. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0695 | Quality of Life and Care Deficiencies | Provide safe and appropriate respiratory care for a resident when needed. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0756 | Pharmacy Service Deficiencies | Ensure a licensed pharmacist perform a monthly drug regimen review, including the medical chart, following irregularity reporting guidelines in developed policies and procedures. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0758 | Pharmacy Service Deficiencies | Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited. | D | No | Deficient, Provider has date of correction | February 14, 2020 |
| January 9, 2020 | Health | F 0812 | Nutrition and Dietary Deficiencies | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | E | No | Deficient, Provider has date of correction | February 14, 2020 |
From the Care Compare health citations file NH_HealthCitations_Aug2026.csv, processed on August 1, 2026.
Penalties
| Penalty date | Type | Fine amount | Payment denial began | Payment denial, days | Fine ID |
|---|---|---|---|---|---|
| February 7, 2024 | Fine | $8,148 | 117213 |
From the Care Compare penalties file NH_Penalties_Sep2026_2.csv, processed on September 1, 2026.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | For profit - Corporation |
| Legal Business Name | GUNNISON VALLEY HOSPITAL |
| Date First Approved to Provide Medicare and Medicaid Services | 1976-01-26 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | N |
| Urban | N |
| County/Parish | Sevier |
| Telephone Number | 4358968211 |
| Chain Name | MISSION HEALTH SERVICES |
| Chain ID | 355 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | Resident |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 98 |
| Average Number of Residents per Day | 36.7 |
| Overall Rating | 4 |
| Health Inspection Rating | 4 |
| QM Rating | 5 |
| Long-Stay QM Rating | 5 |
| Processing Date | 2026-09-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Sep2026_3.csv, processed on September 1, 2026.
Get an email when this record changes
One email a day naming what moved on Mission at Richfield Nursing and Rehabilitation: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On February 20, 2026: A cost report was filed for fiscal year 2025, on form CMS-2540-10. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for Mission at Richfield Nursing and Rehabilitation
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in Utah at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in Utah
- SAVAGE INDUSTRIES-SAVAGE COAL TERMINAL, WELLINGTON Water discharge permit
- BEAR CANYON MINING, HUNTINGTON Water discharge permit
- OPERATOR WILD WEST--WILDCAT LOADOUT, PRICE Water discharge permit
- HUNTER PREP PLANT, LLC-HUNTER PREP PLANT, CASTLE DALE Water discharge permit
- PRICE RIVER TERMINAL, LLC, WELLINGTON Water discharge permit
- PLATEAU MINING CORP, HELPER Water discharge permit
- STAR POINT REFUSE PILE, WATTIS Water discharge permit
- UTAH LAND RESOURCES, INC., TOWER MINES, PRICE Water discharge permit
- CENTRAL WEBER SEWER, OGDEN Air emission source
- CEREAL FOOD PROCESSORS, OGDEN Air emission source
- THE SCOULAR COMPANY, OGDEN Air emission source
- HEBER LIGHT AND POWER COMPANY, HEBER CITY Air emission source
- WHITEWATER WHIRLPOOL BATHS & SYSTEMS, LINDON Air emission source
- PACIFICORP LAKESIDE (SUMMIT VINEYARD), VINEYARD Air emission source
- SOUTH UTAH VALLEY SOLID/BAYVIEW LANDFILL, ELBERTA Air emission source
- TEXAS INSTRUMENTS, LEHI Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 465059.