Skilled nursing facility · CMS certification number 465156
Monument Healthcare Stonecreek
Bountiful, Utah · Medicare and Medicaid
Certified beds, as filed in Care Compare: 122
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 0 · Fines: 0 · Fines, total amount: $0.00 · Payment denials: 0. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for July 1, 2024 to June 30, 2025 — a reporting period of 364 days, on form CMS-2540-10, as submitted, processed by CMS on December 12, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $12,515,431 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,458,472 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,056,959 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,654,323 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $402,636 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $102,498 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $505,134 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $505,134 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 44,530 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 1,761 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 12,461 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 8,791 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 23,013 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 65 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 70 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 259 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 394 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 27.09 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 178.01 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 58.41 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1444497, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2024, ended June 30, 2024
Cost report for July 1, 2023 to June 30, 2024 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on December 9, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,649,152 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,182,302 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,466,850 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,321,035 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $145,815 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $79,952 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $225,767 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $225,767 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 20,451 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 367 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 34.14 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 185.73 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 55.72 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1444162, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2023, ended June 30, 2023
Cost report for July 1, 2022 to June 30, 2023 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on March 2, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,607,649 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $6,459,386 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,148,263 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,331,988 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,183,725 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $114,140 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,069,585 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,069,585 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 20,611 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 318 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 35.64 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 272.86 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 64.81 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1374232, read from the public cost report file SNF10FY2022.zip.
Fiscal year 2022, ended June 30, 2022
Cost report for July 1, 2021 to June 30, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on March 8, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,854,643 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $5,424,097 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,430,546 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,964,498 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$533,952 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $311,295 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$222,657 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$222,657 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 21,916 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 346 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.27 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 273.96 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 63.34 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1344018, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2021, ended June 30, 2021
Cost report for July 1, 2020 to June 30, 2021 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on May 26, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $10,975,374 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,839,270 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $7,136,104 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,566,573 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$430,469 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $198,079 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$232,390 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$232,390 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 20,509 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 315 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 33.17 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 173.97 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 65.11 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1348652, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2020, ended June 30, 2020
Cost report for July 1, 2019 to June 30, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on February 2, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $10,982,332 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,653,113 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $7,329,219 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,015,392 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$686,173 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $249,578 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$436,595 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$436,595 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 25,095 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 351 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 31.72 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 288.63 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 71.5 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1309826, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2019, ended June 30, 2019
Cost report for July 1, 2018 to June 30, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on June 11, 2021.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $9,238,577 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $2,312,973 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,925,604 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,776,434 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$850,830 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $117,015 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$733,815 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$733,815 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 26,591 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 298 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 38.04 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 313.62 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 89.23 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1286067, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2018, ended June 30, 2018
Cost report for July 1, 2017 to June 30, 2018 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on May 13, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $8,675,153 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $2,083,020 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,592,133 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,255,503 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$663,370 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $87,846 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$575,524 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$575,524 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 26,144 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 266 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 45.54 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 261.08 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 98.29 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1255385, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2017, ended June 30, 2017
Cost report for July 1, 2016 to June 30, 2017 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on June 11, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $7,618,120 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,809,389 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,808,731 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,329,693 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$520,962 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $138,710 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$382,252 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$382,252 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 23,835 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 205 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 39.45 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 293.49 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 116.27 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1227924, read from the public cost report file SNF10FY2016.zip.
Fiscal year 2016, ended June 30, 2016
Cost report for July 1, 2015 to June 30, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on August 21, 2017.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $6,790,674 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $896,446 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,894,228 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,104,174 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$209,946 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $62,359 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$147,587 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$147,587 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 23,162 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 259 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.71 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 216.19 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 89.43 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1174272, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2015, ended June 30, 2015
Cost report for July 1, 2014 to June 30, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on September 30, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $6,828,912 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $872,398 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,956,514 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,859,279 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $97,235 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $64,967 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $162,202 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $162,202 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 23,806 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 287 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 46.95 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 177.82 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 82.95 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1143180, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2014, ended June 30, 2014
Cost report for July 1, 2013 to June 30, 2014 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on May 21, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $6,972,309 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $953,214 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,019,095 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,171,876 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$152,781 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $47,620 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$105,161 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$105,161 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 24,039 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 302 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 52.87 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 210.57 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 79.6 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1091218, read from the public cost report file SNF10FY2013.zip.
Fiscal year 2013, ended June 30, 2013
Cost report for July 1, 2012 to June 30, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on November 19, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $7,309,659 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $799,549 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,510,110 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,302,756 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $207,354 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $33,301 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $240,655 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $240,655 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 25,115 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 333 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 45.77 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 252.69 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 75.42 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1080474, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2012, ended June 30, 2012
Cost report for July 1, 2011 to June 30, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on November 5, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $6,842,851 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $970,444 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,872,407 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,401,715 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$529,308 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $92,614 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$436,694 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$436,694 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 22,203 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 156 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 45.4 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 1,267.86 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 142.33 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1050177, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2011, ended June 30, 2011
Cost report for July 1, 2010 to June 30, 2011 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on March 22, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,543,484 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,896,843 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$353,359 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $19,101 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$334,258 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 19,024 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 268 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 40.74 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 304.37 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 70.99 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 434329, read from the public cost report file SNFFY2010.zip.
Fiscal year 2010, ended June 30, 2010
Cost report for July 1, 2009 to June 30, 2010 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on October 21, 2011.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,991,838 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,242,962 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$251,124 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $144,921 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$106,203 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 22,650 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 264 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 41.3 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 468.12 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 85.8 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 419366, read from the public cost report file SNFFY2009.zip.
Fiscal year 2009, ended June 30, 2009
Cost report for July 1, 2008 to June 30, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on October 14, 2010.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $6,312,084 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,134,416 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $177,668 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $91,403 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $269,071 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 25,045 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 278 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 39.89 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 511.06 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 90.09 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 388525, read from the public cost report file SNFFY2008.zip.
Fiscal year 2008, ended June 30, 2008
Cost report for July 1, 2007 to June 30, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on January 20, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,801,340 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,701,863 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $99,477 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $88,205 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $187,682 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 24,649 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 304 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 37.4 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 264.19 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 81.08 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 332243, read from the public cost report file SNFFY2007.zip.
Fiscal year 2007, ended June 30, 2007
Cost report for July 1, 2006 to June 30, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on February 15, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,900,865 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,767,204 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $133,661 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $22,234 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $155,895 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 27,357 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 282 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 42.72 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 378.24 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 97.01 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 302356, read from the public cost report file SNFFY2006.zip.
Fiscal year 2006, ended June 30, 2006
Cost report for July 1, 2005 to June 30, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on November 6, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,385,415 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,068,654 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $316,761 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $18,192 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $334,953 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 26,326 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 566 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 18.93 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 186.96 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 46.51 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 295901, read from the public cost report file SNFFY2005.zip.
Fiscal year 2005, ended June 30, 2005
Cost report for January 1, 2005 to June 30, 2005 — a reporting period of 180 days, not a full year, on form CMS-2540-96, as submitted, processed by CMS on February 3, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,284,906 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,169,369 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $115,537 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $8,756 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $124,293 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 10,889 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 138 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 29.53 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 508.25 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 78.91 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 242354, read from the public cost report file SNFFY2005.zip.
Fiscal year 2004, ended December 31, 2004
Cost report for July 16, 2004 to December 31, 2004 — a reporting period of 168 days, not a full year, on form CMS-2540-96, settled, processed by CMS on March 3, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $1,643,914 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $1,798,421 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$154,507 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $4,950 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$149,557 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 122 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 6,990 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 90 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 56.13 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 214 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 77.67 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 244294, read from the public cost report file SNFFY2004.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| CLAWSON, TRAVIS | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| FRAGOSO, LINDSAY | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| GALINDO, MICHAEL | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| GUNNISON VALLEY HOSPITAL | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/28/2025 |
| HEALTH GROUP MANAGEMENT LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/28/2025 |
| MARRIOTT, STEPHEN | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| MERKLEY, DAVID | ADP OF THE SNF | Individual | NOT APPLICABLE | since 06/16/2026 |
| MONUMENT HEALTH GROUP LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 05/28/2025 |
| MONUMENT HEALTH PROPERTIES LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 02/07/2025 |
| MONUMENT REAL ESTATE NORTH BOUNTIFUL LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 02/07/2025 |
| MURRAY, BRIAN | ADP OF THE SNF | Individual | NOT APPLICABLE | since 07/01/2020 |
| ROBERTSON, BRETT | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| SAMUELIAN, SPENCER | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| SANTIBANEZ, JORGE | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| SEASTRAND, JASON | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| WEST, CHRISTIAN | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| WEST, SHAY | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/07/2025 |
| MURRAY, BRIAN | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 07/01/2020 |
| CLAWSON, TRAVIS | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| FRAGOSO, LINDSAY | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| GALINDO, MICHAEL | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| GUNNISON VALLEY HOSPITAL | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 07/01/2018 |
| HEALTH GROUP MANAGEMENT LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 02/07/2025 |
| MARRIOTT, STEPHEN | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| MERKLEY, DAVID | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 06/16/2026 |
| MONUMENT HEALTH GROUP LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 02/07/2025 |
| MURRAY, BRIAN | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 07/01/2020 |
| ROBERTSON, BRETT | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| SAMUELIAN, SPENCER | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| SANTIBANEZ, JORGE | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| SEASTRAND, JASON | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| WEST, CHRISTIAN | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
| WEST, SHAY | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 02/07/2025 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of GUNNISON VALLEY HOSPITAL (enrollment ID O20200818003685).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| GUNNISON VALLEY HOSPITAL | Organization | 5% OR GREATER DIRECT OWNERSHIP INTEREST | 100 | 7/1/2018 | Private equity company: No Real estate investment trust: No Holding company: No |
| BRETT P ROBERTSON | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| BRIAN C MURRAY | Individual | ADP OF THE SNF | Not stated in the filing | 7/1/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| CHRISTIAN R WEST | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DAVID MERKLEY | Individual | ADP OF THE SNF | Not stated in the filing | 6/16/2026 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| GUNNISON VALLEY HOSPITAL | Organization | ADP OF THE SNF | Not stated in the filing | 5/28/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| HEALTH GROUP MANAGEMENT LLC | Organization | ADP OF THE SNF | Not stated in the filing | 5/28/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| JASON J SEASTRAND | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JORGE SANTIBANEZ | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| LINDSAY FRAGOSO | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHAEL SEBASTIAN GALINDO | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MONUMENT HEALTH GROUP LLC | Organization | ADP OF THE SNF | Not stated in the filing | 5/28/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| MONUMENT HEALTH PROPERTIES LLC | Organization | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| MONUMENT REAL ESTATE NORTH BOUNTIFUL LLC | Organization | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| SHAY WEST | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SPENCER R SAMUELIAN | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| STEPHEN BLAKE MARRIOTT | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| TRAVIS CLAWSON | Individual | ADP OF THE SNF | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| BRIAN C MURRAY | Individual | CORPORATE OFFICER | Not stated in the filing | 7/1/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| BRETT P ROBERTSON | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| BRIAN C MURRAY | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 7/1/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| CHRISTIAN R WEST | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DAVID MERKLEY | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 6/16/2026 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| GUNNISON VALLEY HOSPITAL | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 7/1/2018 | Private equity company: No Real estate investment trust: No Holding company: No |
| HEALTH GROUP MANAGEMENT LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| JASON J SEASTRAND | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JORGE SANTIBANEZ | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| LINDSAY FRAGOSO | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MICHAEL SEBASTIAN GALINDO | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MONUMENT HEALTH GROUP LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| SHAY WEST | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| SPENCER R SAMUELIAN | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| STEPHEN BLAKE MARRIOTT | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| TRAVIS CLAWSON | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 2/7/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
Changes in ownership
- August 1, 2026: STEPHANIE ESPINOSA no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: STEPHANIE ESPINOSA no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: MARK WILLIAMS no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: MARK WILLIAMS no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: DAVID MERKLEY (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2026; associated with this enrollment since June 16, 2026. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: DAVID MERKLEY (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2026; associated with this enrollment since June 16, 2026. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2025: JENNIFER HENNESSY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SANDSTONE UT HOLDCO OP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SANDSTONE HEALTHCARE GROUP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: BRIAN C MURRAY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: BOUNTIFUL NURSING & REHAB LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JENNIFER SPECTOR no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JENNIFER SPECTOR no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HEALTH GROUP MANAGEMENT LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 28, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HEALTH GROUP MANAGEMENT LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JORGE SANTIBANEZ (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JORGE SANTIBANEZ (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: TRAVIS CLAWSON (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: TRAVIS CLAWSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: BRETT P ROBERTSON (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: BRETT P ROBERTSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: LINDSAY FREGOSO (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: LINDSAY FREGOSO (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JASON J SEASTRAND (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JASON J SEASTRAND (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SHAY WEST (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SHAY WEST (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: BRIAN C MURRAY (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since July 1, 2020. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEPHEN BLAKE MARRIOTT (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEPHEN BLAKE MARRIOTT (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MONUMENT HEALTH PROPERTIES LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEPHANIE ESPINOSA (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: STEPHANIE ESPINOSA (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MARK WILLIAMS (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MARK WILLIAMS (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MONUMENT HEALTH GROUP LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 28, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MONUMENT HEALTH GROUP LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SPENCER R SAMUELIAN (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SPENCER R SAMUELIAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MONUMENT REAL ESTATE NORTH BOUNTIFUL LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: GUNNISON VALLEY HOSPITAL (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 28, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: GUNNISON VALLEY HOSPITAL (5% OR GREATER DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since July 1, 2018. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHAEL SEBASTIAN GALINDO (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: MICHAEL SEBASTIAN GALINDO (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CHRISTIAN R WEST (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: CHRISTIAN R WEST (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- June 15, 2023: ANNE H STUART no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: ANNE H STUART no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: AVALON HOLDING, INC. no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: MARK FREDERICK DALLEY no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: MARK FREDERICK DALLEY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: MARK FREDERICK DALLEY no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: AVALON CARE LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: BOUNTIFUL CARE CENTER, LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: ROBERT T GRAMSE no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: ROBERT T GRAMSE no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: AVALON OF UTAH, LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: CHARLES R KIRTON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: CHARLES R KIRTON no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: JENNIFER HENNESSY (W-2 MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on June 15, 2023; associated with this enrollment since April 3, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: SANDSTONE UT HOLDCO OP LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 15, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: SANDSTONE HEALTHCARE GROUP LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 15, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: BOUNTIFUL NURSING & REHAB LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 15, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: JENNIFER SPECTOR (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 15, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
- June 15, 2023: JENNIFER SPECTOR (CONTRACTED MANAGING EMPLOYEE) first listed in CMS’s Medicare enrollment ownership file on June 15, 2023; associated with this enrollment since March 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-06-15.csv
Recent changes on this record
- September 1, 2026: ownership_type: Government - Hospital district → For profit - Limited Liability company. NH_ProviderInfo_Sep2026_3.csv
- August 1, 2026: STEPHANIE ESPINOSA no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: STEPHANIE ESPINOSA no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: MARK WILLIAMS no longer appears as ADP OF THE SNF in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: MARK WILLIAMS no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: DAVID MERKLEY (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2026; associated with this enrollment since June 16, 2026. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- August 1, 2026: DAVID MERKLEY (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2026; associated with this enrollment since June 16, 2026. Skilled_Nursing_Facility_All_Owners_:_2026-08-01.csv
- June 25, 2026: A deficiency was cited under tag F 0880, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0842, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0779, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0761, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0760, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0698, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0697, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0677, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0658, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0628, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0607, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0605, scope and severity D. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0812, scope and severity E. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0775, scope and severity E. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0690, scope and severity E. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0554, scope and severity E. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: A deficiency was cited under tag F 0686, scope and severity G. NH_HealthCitations_Sep2026_2.csv
- June 25, 2026: An inspection was recorded in inspection cycle 1. NH_SurveySummary_Sep2026_2.csv
- December 12, 2025: A cost report was filed for fiscal year 2025, on form CMS-2540-10. SNF10FY2024.zip
- December 9, 2025: A cost report was filed for fiscal year 2024, on form CMS-2540-10. SNF10FY2023.zip
- August 1, 2025: JENNIFER HENNESSY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SANDSTONE UT HOLDCO OP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: SANDSTONE HEALTHCARE GROUP LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: BRIAN C MURRAY no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: BOUNTIFUL NURSING & REHAB LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JENNIFER SPECTOR no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JENNIFER SPECTOR no longer appears as CONTRACTED MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HEALTH GROUP MANAGEMENT LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since May 28, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: HEALTH GROUP MANAGEMENT LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JORGE SANTIBANEZ (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: JORGE SANTIBANEZ (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: TRAVIS CLAWSON (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
- August 1, 2025: TRAVIS CLAWSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on August 1, 2025; associated with this enrollment since February 7, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-08-01.csv
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | June 25, 2026 | June 25, 2026 | 21 | 1 |
| 2 | April 29, 2024 | April 29, 2024 | 4 | 8 |
| 3 | July 11, 2022 | July 11, 2022 | 2 | 4 |
| 3 | February 20, 2020 | February 20, 2020 | 8 | 2 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
33 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| June 25, 2026 | Health | F 0554 | Resident Rights Deficiencies | Allow residents to self-administer drugs if determined clinically appropriate. | E | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0605 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Prevent the use of unnecessary psychotropic medications or use medications that may restrain a resident's ability to function. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0607 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Develop and implement policies and procedures to prevent abuse, neglect, and theft. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0628 | Resident Rights Deficiencies | Provide the required documentation or notification related to the resident's needs, appeal rights, or bed-hold policies. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0658 | Resident Assessment and Care Planning Deficiencies | Ensure services provided by the nursing facility meet professional standards of quality. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0677 | Quality of Life and Care Deficiencies | Provide care and assistance to perform activities of daily living for any resident who is unable. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0686 | Quality of Life and Care Deficiencies | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | G | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | Yes | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0690 | Quality of Life and Care Deficiencies | Provide appropriate care for residents who are continent or incontinent of bowel/bladder, appropriate catheter care, and appropriate care to prevent urinary tract infections. | E | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0697 | Quality of Life and Care Deficiencies | Provide safe, appropriate pain management for a resident who requires such services. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0698 | Quality of Life and Care Deficiencies | Provide safe, appropriate dialysis care/services for a resident who requires such services. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0760 | Pharmacy Service Deficiencies | Ensure that residents are free from significant medication errors. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0775 | Administration Deficiencies | Keep complete, dated laboratory records in the resident's record. | E | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0779 | Administration Deficiencies | Keep signed and dated reports of x-rays and other diagnostic services in the residents record. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0812 | Nutrition and Dietary Deficiencies | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | E | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0842 | Resident Assessment and Care Planning Deficiencies | Safeguard resident-identifiable information and/or maintain medical records on each resident that are in accordance with accepted professional standards. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| June 25, 2026 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | July 17, 2026 |
| January 5, 2026 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | Yes | Deficient, Provider has date of correction | February 3, 2026 |
| January 5, 2026 | Health | F 0755 | Pharmacy Service Deficiencies | Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist. | D | Yes | Deficient, Provider has date of correction | February 3, 2026 |
| January 5, 2026 | Health | F 0760 | Pharmacy Service Deficiencies | Ensure that residents are free from significant medication errors. | D | Yes | Deficient, Provider has date of correction | February 3, 2026 |
| April 29, 2024 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | No | Deficient, Provider has date of correction | May 14, 2024 |
| April 29, 2024 | Health | F 0697 | Quality of Life and Care Deficiencies | Provide safe, appropriate pain management for a resident who requires such services. | D | No | Deficient, Provider has date of correction | May 14, 2024 |
| April 29, 2024 | Health | F 0740 | Quality of Life and Care Deficiencies | Ensure each resident must receive and the facility must provide necessary behavioral health care and services. | D | No | Deficient, Provider has date of correction | May 14, 2024 |
| April 29, 2024 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | E | No | Deficient, Provider has date of correction | May 14, 2024 |
| January 3, 2024 | Health | F 0580 | Resident Rights Deficiencies | Immediately tell the resident, the resident's doctor, and a family member of situations (injury/decline/room, etc.) that affect the resident. | D | Yes | Deficient, Provider has date of correction | February 1, 2024 |
| January 3, 2024 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | G | Yes | Deficient, Provider has date of correction | February 1, 2024 |
| February 20, 2020 | Health | F 0550 | Resident Rights Deficiencies | Honor the resident's right to a dignified existence, self-determination, communication, and to exercise his or her rights. | D | No | Deficient, Provider has date of correction | March 20, 2020 |
| February 20, 2020 | Health | F 0600 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Protect each resident from all types of abuse such as physical, mental, sexual abuse, physical punishment, and neglect by anybody. | G | No | Past Non-Compliance | January 8, 2020 |
| February 20, 2020 | Health | F 0609 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Timely report suspected abuse, neglect, or theft and report the results of the investigation to proper authorities. | D | No | Deficient, Provider has date of correction | March 20, 2020 |
| February 20, 2020 | Health | F 0641 | Resident Assessment and Care Planning Deficiencies | Ensure each resident receives an accurate assessment. | D | No | Deficient, Provider has date of correction | March 20, 2020 |
| February 20, 2020 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | March 20, 2020 |
| February 20, 2020 | Health | F 0921 | Environmental Deficiencies | Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public. | D | No | Deficient, Provider has date of correction | March 20, 2020 |
From the Care Compare health citations file NH_HealthCitations_Sep2026_2.csv, processed on September 1, 2026.
Penalties
No penalty on file for this facility in CMS’s Care Compare penalties data.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | For profit - Limited Liability company |
| Legal Business Name | GUNNISON VALLEY HOSPITAL |
| Date First Approved to Provide Medicare and Medicaid Services | 2004-07-16 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | N |
| Urban | Y |
| County/Parish | Davis |
| Telephone Number | 8019512273 |
| Chain Name | MONUMENT HEALTH GROUP |
| Chain ID | 770 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | Resident |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 122 |
| Average Number of Residents per Day | 77.1 |
| Overall Rating | 2 |
| Health Inspection Rating | 2 |
| QM Rating | 4 |
| Long-Stay QM Rating | 5 |
| Short-Stay QM Rating | 2 |
| Processing Date | 2026-09-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Sep2026_3.csv, processed on September 1, 2026.
Get an email when this record changes
One email a day naming what moved on Monument Healthcare Stonecreek: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On September 1, 2026: ownership_type: Government - Hospital district → For profit - Limited Liability company. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for Monument Healthcare Stonecreek
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in Utah at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in Utah
- AMAZON. COM DED, LLC-DUT1, WEST VALLEY CITY Water discharge permit
- DELUXE CORPORATION, SALT LAKE CITY Water discharge permit
- DAIRY FARMERS OF AMERICA, INC., BEAVER Water discharge permit
- BEAVER CITY AIRPORT, BEAVER Water discharge permit
- OCEAN BEAUTY, SALT LAKE CITY Water discharge permit
- GREAT SALT LAKE BRINE SHRIMP COOPERATIVE INC, OGDEN Water discharge permit
- ASSOCIATED FIXTURE MANUFACTURING, MAGNA Water discharge permit
- OGDEN MUNICIPAL HINKLEY AIRPORT, OGDEN Water discharge permit
- CENTRAL WEBER SEWER, OGDEN Air emission source
- CEREAL FOOD PROCESSORS, OGDEN Air emission source
- THE SCOULAR COMPANY, OGDEN Air emission source
- HEBER LIGHT AND POWER COMPANY, HEBER CITY Air emission source
- WHITEWATER WHIRLPOOL BATHS & SYSTEMS, LINDON Air emission source
- PACIFICORP LAKESIDE (SUMMIT VINEYARD), VINEYARD Air emission source
- SOUTH UTAH VALLEY SOLID/BAYVIEW LANDFILL, ELBERTA Air emission source
- TEXAS INSTRUMENTS, LEHI Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 465156.