Skilled nursing facility · CMS certification number 505202
VALLEY VIEW SKILLED NURSING AND REHABILITATION
RENTON, Washington · Medicare and Medicaid
Certified beds, as filed in Care Compare: 136
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 0 · Fines: 0 · Fines, total amount: $0.00 · Payment denials: 0. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for January 1, 2024 to December 31, 2024 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on August 29, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $19,161,696 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,158,798 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $16,002,898 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $15,282,387 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $720,511 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $6,315 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $726,826 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $726,826 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 49,776 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 1,763 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 23,707 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 8,467 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 33,937 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 32 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 47 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 49 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 128 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 55.09 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 504.4 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 265.13 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1438126, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2023, ended December 31, 2023
Cost report for September 1, 2023 to December 31, 2023 — a reporting period of 121 days, not a full year, on form CMS-2540-10, settled, processed by CMS on August 14, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,785,965 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $810,185 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,975,780 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,740,877 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $234,903 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,635 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $236,538 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $236,538 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 106 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 11,672 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 95 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 67.3 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 159.52 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 122.86 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1392195, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2022, ended December 31, 2022
Cost report for January 1, 2022 to December 31, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on October 11, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $13,979,493 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $736,981 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $13,242,512 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $14,362,787 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,120,275 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $271,913 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$848,362 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$848,362 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 34,395 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 314 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 45.89 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 192.2 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 109.54 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1366143, read from the public cost report file SNF10FY2022.zip.
Fiscal year 2021, ended December 31, 2021
Cost report for March 19, 2021 to December 31, 2021 — a reporting period of 287 days, not a full year, on form CMS-2540-10, settled, processed by CMS on September 23, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $8,843,268 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $469,798 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,373,470 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,914,668 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,541,198 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $33,072 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,508,126 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,508,126 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 23,036 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 199 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 39.33 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 272.05 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 115.76 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1333888, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2020, ended December 31, 2020
Cost report for January 1, 2020 to December 31, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on September 30, 2021.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $12,371,433 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $2,523,536 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,847,897 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $11,953,007 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$2,105,110 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $112,724 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,992,386 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,992,386 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 29,434 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 209 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 143.17 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 140.46 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 140.83 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1301540, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2019, ended December 31, 2019
Cost report for January 1, 2019 to December 31, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on September 17, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,162,528 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,547,826 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,614,702 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,733,141 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,118,439 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $12,378 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,106,061 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,106,061 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 31,842 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 296 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 18.93 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 551.42 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 107.57 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1268563, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2018, ended December 31, 2018
Cost report for May 14, 2018 to December 31, 2018 — a reporting period of 231 days, not a full year, on form CMS-2540-10, settled, processed by CMS on August 12, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $6,443,643 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,130,959 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,312,684 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,770,589 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,457,905 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,070 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,456,835 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,456,835 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 19,084 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 296 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 15.79 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 327.53 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 64.47 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1240484, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2017, ended December 31, 2017
Cost report for January 1, 2017 to December 31, 2017 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on August 22, 2018.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $14,465,182 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $5,051,401 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,413,781 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,579,653 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,165,872 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $555 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,165,317 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,165,316 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 32,020 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 447 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 31.63 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 179.18 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 71.63 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1210123, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2016, ended December 31, 2016
Cost report for January 1, 2016 to December 31, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on July 27, 2017.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $9,108,257 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $825,959 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $8,282,298 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,634,045 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,351,747 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,178 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$1,349,569 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$1,349,571 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 29,691 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 432 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 32.02 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 168.09 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 68.73 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1170988, read from the public cost report file SNF10FY2016.zip.
Fiscal year 2015, ended December 31, 2015
Cost report for January 1, 2015 to December 31, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 26, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,291,430 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,204,664 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,086,766 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,614,921 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$528,155 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,756 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$525,399 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$525,399 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 33,203 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 561 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 32.06 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 143.53 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 59.19 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1138202, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2014, ended December 31, 2014
Cost report for January 1, 2014 to December 31, 2014 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 24, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $11,829,210 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,040,803 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $10,788,407 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $10,360,236 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $428,171 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $1,397 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $429,568 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $429,568 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 33,866 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 699 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 34.17 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 145.73 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 48.45 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1102649, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2013, ended December 31, 2013
Cost report for January 1, 2013 to December 31, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on July 23, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $10,086,915 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $706,450 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,380,465 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,249,806 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $130,659 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $945 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $131,604 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $131,604 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 30,635 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 586 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 34.34 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 167.4 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 52.28 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1072692, read from the public cost report file SNF10FY2013.zip.
Fiscal year 2012, ended December 31, 2012
Cost report for January 1, 2012 to December 31, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on March 28, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $10,077,764 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $784,540 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,293,224 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,717,025 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$423,801 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $3,309 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$420,492 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$420,492 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 30,979 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 544 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 32.24 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 132.13 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 56.95 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1057701, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2011, ended December 31, 2011
Cost report for January 1, 2011 to December 31, 2011 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on September 9, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $9,122,567 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | −$234,899 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $9,357,466 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,383,495 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$26,029 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $3,377 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$22,652 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$22,652 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 30,427 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 655 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 34.32 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 97.54 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 46.45 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1047826, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2010, ended December 31, 2010
Cost report for January 1, 2010 to December 31, 2010 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on April 24, 2012.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $8,960,973 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,122,009 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$161,036 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $6,365 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$154,671 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 31,428 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 648 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 32.08 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 102.86 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 48.5 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 428131, read from the public cost report file SNFFY2010.zip.
Fiscal year 2009, ended December 31, 2009
Cost report for January 1, 2009 to December 31, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on May 19, 2011.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $9,409,285 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,712,808 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$303,523 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $2,187 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$301,336 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 32,109 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 621 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 30.36 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 117.02 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 51.71 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 399815, read from the public cost report file SNFFY2009.zip.
Fiscal year 2008, ended December 31, 2008
Cost report for January 1, 2008 to December 31, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled with audit, processed by CMS on February 16, 2010.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $10,059,351 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,482,558 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $576,793 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $59 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $576,852 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 136 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 36,634 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 683 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 36.31 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 102.17 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 53.64 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 363978, read from the public cost report file SNFFY2008.zip.
Fiscal year 2007, ended December 31, 2007
Cost report for January 1, 2007 to December 31, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on May 28, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $10,627,980 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $9,203,134 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $1,424,846 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $247 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $1,425,093 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 38,717 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 821 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 28.95 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 134.6 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 47.16 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 340601, read from the public cost report file SNFFY2007.zip.
Fiscal year 2006, ended December 31, 2006
Cost report for January 1, 2006 to December 31, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on June 4, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $10,566,711 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,912,641 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $2,654,070 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $1,106 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $2,655,176 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 41,162 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 679 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 29.83 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 441.86 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 60.62 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 311381, read from the public cost report file SNFFY2006.zip.
Fiscal year 2005, ended December 31, 2005
Cost report for January 1, 2005 to December 31, 2005 — a reporting period of 364 days, on form CMS-2540-96, settled with audit, processed by CMS on May 17, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $10,087,692 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,593,660 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $1,494,032 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $1,449 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $1,495,481 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 41,986 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 633 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 32.79 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 277.91 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 66.33 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 278861, read from the public cost report file SNFFY2005.zip.
Fiscal year 2004, ended December 31, 2004
Cost report for January 1, 2004 to December 31, 2004 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on August 18, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $9,753,628 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,474,901 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $2,278,727 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $1,731 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $2,280,458 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 166 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 42,197 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 567 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 30.54 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 469.65 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 74.42 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 231013, read from the public cost report file SNFFY2004.zip.
Fiscal year 2003, ended December 31, 2003
Cost report for January 1, 2003 to December 31, 2003 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on January 21, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $5,573,724 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,346,279 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $227,445 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $21,370 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $248,815 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 30,172 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 276 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 30.75 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 384.05 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 109.32 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 205055, read from the public cost report file SNFFY2003.zip.
Fiscal year 2002, ended December 31, 2002
Cost report for January 1, 2002 to December 31, 2002 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on December 13, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $6,259,932 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,344,191 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $915,741 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $396 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $916,137 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 35,246 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 364 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 30.47 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 235.01 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 96.83 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 202154, read from the public cost report file SNFFY2002.zip.
Fiscal year 2001, ended December 31, 2001
Cost report for January 1, 2001 to December 31, 2001 — a reporting period of 364 days, on form CMS-2540-96, reopened, processed by CMS on October 23, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $6,074,506 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,640,776 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $433,730 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $121 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $433,851 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 37,226 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 349 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 28.49 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 280.87 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 106.66 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 265034, read from the public cost report file SNFFY2001.zip.
Fiscal year 2000, ended December 31, 2000
Cost report for September 1, 2000 to December 31, 2000 — a reporting period of 121 days, not a full year, on form CMS-2540-96, settled, processed by CMS on March 15, 2002.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,225,114 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,037,764 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $187,350 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $30,503 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $217,853 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 13,628 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 142 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 26.48 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 265.88 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 95.97 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 96320, read from the public cost report file SNFFY2000.zip.
Fiscal year 1998, ended June 30, 1998
Cost report for January 1, 1998 to June 30, 1998 — a reporting period of 180 days, not a full year, on form CMS-2540-96, as submitted, processed by CMS on February 1, 1999.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,817,834 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,078,993 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$261,159 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $5,620 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$255,539 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 164 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 23,304 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 303 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 25.52 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 76.91 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 96318, read from the public cost report file SNFFY1998.zip.
Fiscal year 1997, ended December 31, 1997
Cost report for January 1, 1997 to December 31, 1997 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on September 30, 1999.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $7,954,655 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $8,166,745 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$212,090 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $19,945 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$192,145 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 164 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 49,267 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 488 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 32.36 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 100.96 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 96316, read from the public cost report file SNFFY1997.zip.
Fiscal year 1996, ended December 31, 1996
Cost report for January 1, 1996 to December 31, 1996 — a reporting period of 365 days, on form CMS-2540-96, as submitted, processed by CMS on June 23, 1997.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $7,723,440 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $7,710,103 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | $13,337 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $33,005 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $46,342 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 164 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 51,848 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 402 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 45.52 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, all patients, in days | 128.98 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 96315, read from the public cost report file SNFFY1996.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| CHHEDA, NEEL | ADP OF THE SNF | Individual | NOT APPLICABLE | since 04/09/2025 |
| KAUR, JASMEEN | ADP OF THE SNF | Individual | NOT APPLICABLE | since 04/23/2025 |
| TALBOT RD S I CONSULTING LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 03/19/2025 |
| VHS WA OPCO HOLDINGS LLC | DIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 09/01/2023 |
| MILLER, WILLIAM | INDIRECT OWNERSHIP INTEREST | Individual | NOT APPLICABLE | since 09/01/2023 |
| VERTICAL HEALTH SERVICES LLC | INDIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 09/01/2023 |
| VHS HOLDCO LLC | INDIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 09/01/2023 |
| VHS ULTIMATE PARENT LLC | INDIRECT OWNERSHIP INTEREST | Organization | NOT APPLICABLE | since 09/01/2023 |
| CHHEDA, NEEL | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/05/2023 |
| KAUR, JASMEEN | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 12/16/2024 |
| MILLER, WILLIAM | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 09/01/2023 |
| TALBOT RD S I CONSULTING LLC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 09/01/2023 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of TALBOT RD S I HEALTHCARE LLC (enrollment ID O20231117001707).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| JASMEEN KAUR | Individual | ADP OF THE SNF | Not stated in the filing | 4/23/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| NEEL RAMESH CHHEDA | Individual | ADP OF THE SNF | Not stated in the filing | 4/9/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| TALBOT RD S I CONSULTING LLC | Organization | ADP OF THE SNF | Not stated in the filing | 3/19/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| VHS WA OPCO HOLDINGS LLC | Organization | DIRECT OWNERSHIP INTEREST | 100 | 9/1/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| VERTICAL HEALTH SERVICES LLC | Organization | INDIRECT OWNERSHIP INTEREST | 100 | 9/1/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| VHS HOLDCO LLC | Organization | INDIRECT OWNERSHIP INTEREST | 100 | 9/1/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| VHS ULTIMATE PARENT LLC | Organization | INDIRECT OWNERSHIP INTEREST | 100 | 9/1/2023 | Private equity company: No Real estate investment trust: No Holding company: Yes |
| WILLIAM MILLER | Individual | INDIRECT OWNERSHIP INTEREST | 100 | 9/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JASMEEN KAUR | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/16/2024 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| NEEL RAMESH CHHEDA | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 12/5/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| TALBOT RD S I CONSULTING LLC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 9/1/2023 | Private equity company: No Real estate investment trust: No Holding company: No |
| WILLIAM MILLER | Individual | OPERATIONAL/MANAGERIAL CONTROL | 100 | 9/1/2023 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
Changes in ownership
- June 1, 2025: VHS HOLDCO LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS WA OPCO HOLDINGS LLC no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VERTICAL HEALTH SERVICES LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS ULTIMATE PARENT LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: WILLIAM MILLER no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: WILLIAM MILLER no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS HOLDCO LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: TALBOT RD S I CONSULTING LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since March 19, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: TALBOT RD S I CONSULTING LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS WA OPCO HOLDINGS LLC (DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VERTICAL HEALTH SERVICES LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS ULTIMATE PARENT LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: JASMEEN KAUR (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since April 23, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: JASMEEN KAUR (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since December 16, 2024. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: WILLIAM MILLER (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: NEEL RAMESH CHHEDA (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since April 9, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: NEEL RAMESH CHHEDA (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since December 5, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- December 1, 2023: SAMUEL GOLDNER no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: SAMUEL GOLDNER no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: SUSAN GOLDNER no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: GOLDNER CAPITAL MANAGEMENT LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WASH THREE MGMT HOLDINGS LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WASH THREE OP HOLDINGS LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WASH THREE OP HOLDINGS LLC no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: GOLDNER FAMILY TRUST no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: GCM MANAGER LLC no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VHS HOLDCO LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VHS WA OPCO HOLDINGS LLC (5% OR GREATER DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VERTICAL HEALTH SERVICES LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VHS ULTIMATE PARENT LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER (OFFICER) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
Recent changes on this record
- August 29, 2025: A cost report was filed for fiscal year 2024, on form CMS-2540-10. SNF10FY2024.zip
- June 1, 2025: VHS HOLDCO LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS WA OPCO HOLDINGS LLC no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VERTICAL HEALTH SERVICES LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS ULTIMATE PARENT LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: WILLIAM MILLER no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: WILLIAM MILLER no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS HOLDCO LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: TALBOT RD S I CONSULTING LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since March 19, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: TALBOT RD S I CONSULTING LLC (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS WA OPCO HOLDINGS LLC (DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VERTICAL HEALTH SERVICES LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: VHS ULTIMATE PARENT LLC (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: JASMEEN KAUR (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since April 23, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: JASMEEN KAUR (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since December 16, 2024. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: WILLIAM MILLER (INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since September 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: NEEL RAMESH CHHEDA (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since April 9, 2025. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- June 1, 2025: NEEL RAMESH CHHEDA (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on June 1, 2025; associated with this enrollment since December 5, 2023. Skilled_Nursing_Facility_All_Owners_:_2025-06-01.csv
- August 14, 2024: A cost report was filed for fiscal year 2023, on form CMS-2540-10. SNF10FY2023.zip
- April 11, 2024: A cost report was filed for fiscal year 2023, on form CMS-2540-10. SNF10FY2023.zip
- December 1, 2023: SAMUEL GOLDNER no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: SAMUEL GOLDNER no longer appears as OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: SUSAN GOLDNER no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: GOLDNER CAPITAL MANAGEMENT LLC no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WASH THREE MGMT HOLDINGS LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WASH THREE OP HOLDINGS LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WASH THREE OP HOLDINGS LLC no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: GOLDNER FAMILY TRUST no longer appears as 5% OR GREATER INDIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: GCM MANAGER LLC no longer appears as OTHER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VHS HOLDCO LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VHS WA OPCO HOLDINGS LLC (5% OR GREATER DIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VERTICAL HEALTH SERVICES LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: VHS ULTIMATE PARENT LLC (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER (OFFICER) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- December 1, 2023: WILLIAM MILLER (5% OR GREATER INDIRECT OWNERSHIP INTEREST) first listed in CMS’s Medicare enrollment ownership file on December 1, 2023; associated with this enrollment since June 1, 2023. Skilled_Nursing_Facility_All_Owners_:_2023-12-01.csv
- October 11, 2023: A cost report was filed for fiscal year 2022, on form CMS-2540-10. SNF10FY2022.zip
- September 23, 2022: A cost report was filed for fiscal year 2021, on form CMS-2540-10. SNF10FY2021.zip
- December 3, 2021: A cost report was filed for fiscal year 2021, on form CMS-2540-10. SNF10FY2021.zip
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | March 24, 2026 | March 24, 2026 | 13 | 9 |
| 2 | December 13, 2024 | December 13, 2024 | 25 | 22 |
| 3 | August 25, 2023 | August 25, 2023 | 21 | 16 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
59 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| May 28, 2026 | Health | F 0908 | Environmental Deficiencies | Keep all essential equipment working safely. | E | Yes | Deficient, Provider has date of correction | June 11, 2026 |
| March 24, 2026 | Health | F 0552 | Resident Rights Deficiencies | Ensure that residents are fully informed and understand their health status, care and treatments. | D | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0584 | Resident Rights Deficiencies | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | E | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0628 | Resident Rights Deficiencies | Provide the required documentation or notification related to the resident's needs, appeal rights, or bed-hold policies. | E | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0645 | Resident Assessment and Care Planning Deficiencies | PASARR screening for Mental disorders or Intellectual Disabilities | E | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0656 | Resident Assessment and Care Planning Deficiencies | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | D | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0658 | Resident Assessment and Care Planning Deficiencies | Ensure services provided by the nursing facility meet professional standards of quality. | D | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0698 | Quality of Life and Care Deficiencies | Provide safe, appropriate dialysis care/services for a resident who requires such services. | E | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | E | No | Deficient, Provider has date of correction | April 21, 2026 |
| March 24, 2026 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | E | No | Deficient, Provider has date of correction | April 21, 2026 |
| December 23, 2025 | Health | F 0686 | Quality of Life and Care Deficiencies | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | D | Yes | Deficient, Provider has date of correction | January 21, 2026 |
| May 9, 2025 | Health | F 0812 | Nutrition and Dietary Deficiencies | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | E | Yes | Deficient, Provider has date of correction | June 17, 2025 |
| December 13, 2024 | Health | F 0572 | Resident Rights Deficiencies | Give residents a notice of rights, rules, services and charges. | E | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0584 | Resident Rights Deficiencies | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | E | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0585 | Resident Rights Deficiencies | Honor the resident's right to voice grievances without discrimination or reprisal and the facility must establish a grievance policy and make prompt efforts to resolve grievances. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0609 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Timely report suspected abuse, neglect, or theft and report the results of the investigation to proper authorities. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0610 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Respond appropriately to all alleged violations. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0623 | Resident Rights Deficiencies | Provide timely notification to the resident, and if applicable to the resident representative and ombudsman, before transfer or discharge, including appeal rights. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0625 | Resident Rights Deficiencies | Notify the resident or the resident’s representative in writing how long the nursing home will hold the resident’s bed in cases of transfer to a hospital or therapeutic leave. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0657 | Resident Assessment and Care Planning Deficiencies | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0677 | Quality of Life and Care Deficiencies | Provide care and assistance to perform activities of daily living for any resident who is unable. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0685 | Quality of Life and Care Deficiencies | Assist a resident in gaining access to vision and hearing services. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0686 | Quality of Life and Care Deficiencies | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0755 | Pharmacy Service Deficiencies | Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0791 | Quality of Life and Care Deficiencies | Provide or obtain dental services for each resident. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0803 | Nutrition and Dietary Deficiencies | Ensure menus must meet the nutritional needs of residents, be prepared in advance, be followed, be updated, be reviewed by dietician, and meet the needs of the resident. | E | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0804 | Nutrition and Dietary Deficiencies | Ensure food and drink is palatable, attractive, and at a safe and appetizing temperature. | E | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0812 | Nutrition and Dietary Deficiencies | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | F | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0842 | Resident Assessment and Care Planning Deficiencies | Safeguard resident-identifiable information and/or maintain medical records on each resident that are in accordance with accepted professional standards. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0847 | Administration Deficiencies | Inform resident or representatives choice to enter into binding arbitration agreement and right to refuse. | E | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0880 | Infection Control Deficiencies | Provide and implement an infection prevention and control program. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| December 13, 2024 | Health | F 0925 | Environmental Deficiencies | Make sure there is a pest control program to prevent/deal with mice, insects, or other pests. | D | No | Deficient, Provider has date of correction | January 24, 2025 |
| November 1, 2024 | Health | F 0851 | Administration Deficiencies | Electronically submit to CMS complete and accurate direct care staffing information, based on payroll and other verifiable and auditable data. | D | Yes | Deficient, Provider has date of correction | November 14, 2024 |
| April 23, 2024 | Health | F 0684 | Quality of Life and Care Deficiencies | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | E | Yes | Deficient, Provider has date of correction | May 10, 2024 |
| August 25, 2023 | Health | F 0572 | Resident Rights Deficiencies | Give residents a notice of rights, rules, services and charges. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0574 | Resident Rights Deficiencies | The resident has the right to receive notices in a format and a language he or she understands. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0576 | Resident Rights Deficiencies | Ensure residents have reasonable access to and privacy in their use of communication methods. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0577 | Resident Rights Deficiencies | Allow residents to easily view the nursing home's survey results and communicate with advocate agencies. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0578 | Resident Rights Deficiencies | Honor the resident's right to request, refuse, and/or discontinue treatment, to participate in or refuse to participate in experimental research, and to formulate an advance directive. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0582 | Resident Rights Deficiencies | Give residents notice of Medicaid/Medicare coverage and potential liability for services not covered. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0584 | Resident Rights Deficiencies | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0623 | Resident Rights Deficiencies | Provide timely notification to the resident, and if applicable to the resident representative and ombudsman, before transfer or discharge, including appeal rights. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0645 | Resident Assessment and Care Planning Deficiencies | PASARR screening for Mental disorders or Intellectual Disabilities | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0676 | Quality of Life and Care Deficiencies | Ensure residents do not lose the ability to perform activities of daily living unless there is a medical reason. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0677 | Quality of Life and Care Deficiencies | Provide care and assistance to perform activities of daily living for any resident who is unable. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0679 | Quality of Life and Care Deficiencies | Provide activities to meet all resident's needs. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0688 | Quality of Life and Care Deficiencies | Provide appropriate care for a resident to maintain and/or improve range of motion (ROM), limited ROM and/or mobility, unless a decline is for a medical reason. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0692 | Quality of Life and Care Deficiencies | Provide enough food/fluids to maintain a resident's health. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0725 | Nursing and Physician Services Deficiencies | Provide enough nursing staff every day to meet the needs of every resident; and have a licensed nurse in charge on each shift. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0755 | Pharmacy Service Deficiencies | Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist. | E | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0761 | Pharmacy Service Deficiencies | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0812 | Nutrition and Dietary Deficiencies | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | F | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0825 | Quality of Life and Care Deficiencies | Provide or get specialized rehabilitative services as required for a resident. | D | No | Deficient, Provider has date of correction | September 29, 2023 |
| August 25, 2023 | Health | F 0838 | Administration Deficiencies | Conduct and document a facility-wide assessment to determine what resources are necessary to care for residents competently during both day-to-day operations (including nights and weekends) and emergencies. | F | No | Deficient, Provider has date of correction | September 29, 2023 |
From the Care Compare health citations file NH_HealthCitations_Sep2026_2.csv, processed on September 1, 2026.
Penalties
No penalty on file for this facility in CMS’s Care Compare penalties data.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | For profit - Limited Liability company |
| Legal Business Name | TALBOT RD S I HEALTHCARE LLC |
| Date First Approved to Provide Medicare and Medicaid Services | 1970-06-01 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | N |
| Urban | Y |
| County/Parish | King |
| Telephone Number | 4252267500 |
| Chain Name | VERTICAL HEALTH SERVICES |
| Chain ID | 636 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | None |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 136 |
| Average Number of Residents per Day | 104.0 |
| Overall Rating | 3 |
| Health Inspection Rating | 3 |
| QM Rating | 3 |
| Long-Stay QM Rating | 4 |
| Short-Stay QM Rating | 2 |
| Processing Date | 2026-09-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Sep2026_3.csv, processed on September 1, 2026.
Get an email when this record changes
One email a day naming what moved on VALLEY VIEW SKILLED NURSING AND REHABILITATION: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On August 29, 2025: A cost report was filed for fiscal year 2024, on form CMS-2540-10. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for VALLEY VIEW SKILLED NURSING AND REHABILITATION
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in Washington at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in Washington
- DBD/SMD WASHINGTON LLC, OUTLOOK Water discharge permit
- WESTERN VALLEY FARMS LLC (SKYRIDGE FARMS), SUNNYSIDE Water discharge permit
- SMD LLC, OUTLOOK Water discharge permit
- ALBERT JENSEN & SONS INC, FRIDAY HARBOR Water discharge permit
- LANDINGS AT COLONY WHARF, BELLINGHAM Water discharge permit
- CSR MARINE SOUTH, DES MOINES Water discharge permit
- BREMERTON YACHT CLUB, BREMERTON Water discharge permit
- NORTH LAKE MARINA, KENMORE Water discharge permit
- NUTRIEN, KENNEWICK Air emission source
- NORTHWEST PIPELINE CORP PLYMOUTH PLANT, PLYMOUTH Air emission source
- BUILDERS FIRST SOURCE, KENNEWICK Air emission source
- TREE TOP, INC., PROSSER Air emission source
- FRAMATOME NP, RICHLAND Air emission source
- LAMB WESTON, RICHLAND Air emission source
- NAS WHIDBEY ISLAND, OAK HARBOR Air emission source
- CHEMTRADE SOLUTIONS LLC, ANACORTES Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 505202.