Skilled nursing facility · CMS certification number 535038
Rocky Mountain Care - Evanston
EVANSTON, Wyoming · Medicare and Medicaid
Certified beds, as filed in Care Compare: 60
Download this facility’s record (CSV)
A CSV file of this facility’s record: its name and location, its Medicare cost-report finances year by year, its ownership, its inspections, deficiencies and penalties, and the Care Compare provider information — each figure with the worksheet, line and column or file it came from.
In Care Compare’s provider information: Penalties: 2 · Fines: 2 · Fines, total amount: $13,388.00 · Payment denials: 0. The most recent penalty on file: March 19, 2025, Fine, $7,220. Every penalty on file ↓
For this facility: the citable document with full history — $295 · an email when this record changes — $99/month
Finances, as filed
From this facility’s Medicare cost reports on form CMS-2540, each figure with the worksheet, line and column it was read from.
Cost report for July 1, 2024 to June 30, 2025 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on February 6, 2026.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $8,194,270 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,752,720 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,441,550 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,114,859 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $326,691 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $8,484 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $335,175 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$631,064 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Bed days available, all components | 21,900 | CMS-2540-10 worksheet S300001 line 800 column 200 |
| Medicare (Title XVIII) patient days | 1,556 | CMS-2540-10 worksheet S300001 line 800 column 400 |
| Medicaid (Title XIX) patient days | 10,456 | CMS-2540-10 worksheet S300001 line 800 column 500 |
| Other-payer patient days | 4,332 | CMS-2540-10 worksheet S300001 line 800 column 600 |
| Total patient days, all components | 16,344 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Medicare discharges | 54 | CMS-2540-10 worksheet S300001 line 800 column 900 |
| Medicaid discharges | 15 | CMS-2540-10 worksheet S300001 line 800 column 1000 |
| Other-payer discharges | 52 | CMS-2540-10 worksheet S300001 line 800 column 1100 |
| Total discharges, all components | 121 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 28.81 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 697.07 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 135.07 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1447531, read from the public cost report file SNF10FY2024.zip.
Fiscal year 2024, ended June 30, 2024
Cost report for July 1, 2023 to June 30, 2024 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on March 14, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $8,759,806 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $2,574,203 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $6,185,603 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,740,663 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $444,940 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Net income after other income | $444,940 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $299,466 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 16,303 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 83 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 29.43 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 2,626.75 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 196.42 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1405313, read from the public cost report file SNF10FY2023.zip.
Fiscal year 2023, ended June 30, 2023
Cost report for July 1, 2022 to June 30, 2023 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on January 27, 2025.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $8,572,596 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,116,029 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,456,567 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $6,686,862 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$1,230,295 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $874,001 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$356,294 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$356,294 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 15,681 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 91 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 46.79 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 546.4 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 172.32 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1402744, read from the public cost report file SNF10FY2022.zip.
Fiscal year 2022, ended June 30, 2022
Cost report for July 1, 2021 to June 30, 2022 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on April 11, 2024.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $8,590,562 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,722,438 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $4,868,124 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,248,970 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$380,846 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $373,846 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$7,000 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$74,000 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 15,313 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 40.31 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 1,211.33 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 255.22 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1376284, read from the public cost report file SNF10FY2021.zip.
Fiscal year 2021, ended June 30, 2021
Cost report for July 1, 2020 to June 30, 2021 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on May 26, 2023.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $8,690,674 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $3,656,514 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,034,160 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,222,614 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$188,454 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $875,900 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $687,446 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $687,446 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 15,224 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 76 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 54.54 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 546.2 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 200.32 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1348672, read from the public cost report file SNF10FY2020.zip.
Fiscal year 2020, ended June 30, 2020
Cost report for July 1, 2019 to June 30, 2020 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on February 28, 2022.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $9,936,537 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $4,289,391 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,647,146 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $5,360,342 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $286,804 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $327,346 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $614,150 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $524,150 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 17,256 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 144 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 54.7 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 427.93 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 119.83 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1311025, read from the public cost report file SNF10FY2019.zip.
Fiscal year 2019, ended June 30, 2019
Cost report for July 1, 2018 to June 30, 2019 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on May 7, 2021.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $9,740,225 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $4,388,662 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $5,351,563 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,872,804 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $478,759 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $244,059 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $722,818 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $722,818 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 17,250 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 152 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 36.57 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 425.54 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 113.49 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1283582, read from the public cost report file SNF10FY2018.zip.
Fiscal year 2018, ended June 30, 2018
Cost report for September 15, 2017 to June 30, 2018 — a reporting period of 288 days, not a full year, on form CMS-2540-10, settled, processed by CMS on July 17, 2020.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $3,580,839 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Net patient revenue | $3,580,839 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,497,532 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $83,307 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $83,569 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $166,876 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $146,470 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 12,304 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 112 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 35.91 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 293.8 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 109.86 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1259660, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2017, ended September 14, 2017
Cost report for April 1, 2017 to September 14, 2017 — a reporting period of 166 days, not a full year, on form CMS-2540-10, settled, processed by CMS on November 7, 2019.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $1,810,552 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Net patient revenue | $1,810,552 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $1,944,954 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$134,402 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $245,563 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $111,161 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $111,161 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 6,865 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 51 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 33.1 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 512.13 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 134.61 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1245415, read from the public cost report file SNF10FY2017.zip.
Fiscal year 2016, ended March 31, 2016
Cost report for April 1, 2015 to March 31, 2016 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on October 19, 2016.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $3,725,005 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Net patient revenue | $3,725,005 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,740,893 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$15,888 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $7,421 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$8,467 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$8,467 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 13,956 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 133 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 22.63 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 262.43 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 104.93 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1144800, read from the public cost report file SNF10FY2015.zip.
Fiscal year 2015, ended March 31, 2015
Cost report for April 1, 2014 to March 31, 2015 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on October 29, 2015.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $3,358,328 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Net patient revenue | $3,358,328 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,469,411 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$111,083 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Net income after other income | −$111,083 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$111,083 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 13,007 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 169 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 19.08 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 192.4 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 76.96 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1112019, read from the public cost report file SNF10FY2014.zip.
Fiscal year 2014, ended March 31, 2014
Cost report for April 1, 2013 to March 31, 2014 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on November 7, 2014.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,326,852 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,709,640 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,617,212 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $4,531,609 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | −$914,397 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $20,580 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | −$893,817 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: −$909,136 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 14,450 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 143 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 25 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 253.32 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 101.05 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1079878, read from the public cost report file SNF10FY2013.zip.
Fiscal year 2013, ended March 31, 2013
Cost report for April 1, 2012 to March 31, 2013 — a reporting period of 364 days, on form CMS-2540-10, settled, processed by CMS on November 24, 2013.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,380,669 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,737,059 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,643,610 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,320,037 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $323,573 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $2,013,032 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $2,336,605 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $2,336,605 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 14,750 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 128 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 21.46 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 272.57 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 115.23 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1051079, read from the public cost report file SNF10FY2012.zip.
Fiscal year 2012, ended March 31, 2012
Cost report for April 1, 2011 to March 31, 2012 — a reporting period of 365 days, on form CMS-2540-10, settled, processed by CMS on October 26, 2012.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total patient revenue | $5,161,784 | CMS-2540-10 worksheet G300000 line 100 column 100 |
| Contractual allowances and discounts | $1,689,230 | CMS-2540-10 worksheet G300000 line 200 column 100 |
| Net patient revenue | $3,472,554 | CMS-2540-10 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,207,947 | CMS-2540-10 worksheet G300000 line 400 column 100 |
| Net income from service to patients | $264,607 | CMS-2540-10 worksheet G300000 line 500 column 100 |
| Total other income | $4,263 | CMS-2540-10 worksheet G300000 line 2500 column 100 |
| Net income after other income | $268,870 | CMS-2540-10 worksheet G300000 line 2600 column 100 |
Net income: $228,624 (CMS-2540-10 worksheet G300000 line 3100 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 26 less 27 through 30) on 204,018 of the 204,018 reports filed on Form CMS-2540-10 in publication years 2011-2025 that file every line it is computed from (100%).
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-10 worksheet S300001 line 800 column 100 |
| Total patient days, all components | 13,833 | CMS-2540-10 worksheet S300001 line 800 column 700 |
| Total discharges, all components | 107 | CMS-2540-10 worksheet S300001 line 800 column 1200 |
| Average length of stay, Medicare, in days | 27.97 | CMS-2540-10 worksheet S300001 line 800 column 1400 |
| Average length of stay, Medicaid, in days | 371.96 | CMS-2540-10 worksheet S300001 line 800 column 1500 |
| Average length of stay, all patients, in days | 129.28 | CMS-2540-10 worksheet S300001 line 800 column 1600 |
CMS report record 1015931, read from the public cost report file SNF10FY2011.zip.
Fiscal year 2011, ended March 31, 2011
Cost report for April 1, 2010 to March 31, 2011 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on October 21, 2011.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,756,899 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,779,161 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$22,262 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $3,741 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | −$171 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$18,350 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 13,293 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 75 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 35.94 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 401.96 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 177.24 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 419270, read from the public cost report file SNFFY2010.zip.
Fiscal year 2010, ended March 31, 2010
Cost report for April 1, 2009 to March 31, 2010 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on November 1, 2010.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,065,938 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,069,455 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$3,517 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $5,072 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $15,359 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$13,804 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 15,313 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 78 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 35.7 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 478.76 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 196.32 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 389153, read from the public cost report file SNFFY2009.zip.
Fiscal year 2009, ended March 31, 2009
Cost report for April 1, 2008 to March 31, 2009 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on November 2, 2009.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,042,623 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,105,432 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$62,809 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $62,432 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $14,217 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$14,594 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 15,502 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 81 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 38.59 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 445.21 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 191.38 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 358516, read from the public cost report file SNFFY2008.zip.
Fiscal year 2008, ended March 31, 2008
Cost report for April 1, 2007 to March 31, 2008 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on November 17, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,108,663 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,203,474 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$94,811 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $3,268 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $41,986 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$133,529 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 16,551 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 81 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 45.72 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 478.13 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 204.33 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 328492, read from the public cost report file SNFFY2007.zip.
Fiscal year 2007, ended March 31, 2007
Cost report for April 1, 2006 to March 31, 2007 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on May 16, 2008.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $1,546,390 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,817,239 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$1,270,849 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $42,718 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $26,294 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$1,254,425 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 14,152 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 78 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 33.71 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 364.14 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 181.44 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 309210, read from the public cost report file SNFFY2006.zip.
Fiscal year 2006, ended March 31, 2006
Cost report for April 1, 2005 to March 31, 2006 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on March 20, 2007.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,619,562 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,870,195 | CMS-2540-96 worksheet G200002 line 1500 column 200 |
| Net income from service to patients | −$250,633 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $42,718 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $26,294 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$234,209 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 16,903 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 137 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 27.14 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 318.17 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 123.38 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 275447, read from the public cost report file SNFFY2005.zip.
Fiscal year 2005, ended March 31, 2005
Cost report for October 1, 2004 to March 31, 2005 — a reporting period of 181 days, not a full year, on form CMS-2540-96, settled, processed by CMS on September 14, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $1,586,600 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $1,601,254 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$14,654 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $5,635 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $26,400 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$35,419 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 9,572 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 84 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 34.08 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 259 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 113.95 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 262550, read from the public cost report file SNFFY2005.zip.
Fiscal year 2004, ended September 30, 2004
Cost report for October 1, 2003 to September 30, 2004 — a reporting period of 365 days, on form CMS-2540-96, settled, processed by CMS on March 10, 2006.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,691,405 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,868,412 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$177,007 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $19,181 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $26,772 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$184,598 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 17,573 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 32.1 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 244.2 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 130.17 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 244799, read from the public cost report file SNFFY2004.zip.
Fiscal year 2003, ended September 30, 2003
Cost report for October 1, 2002 to September 30, 2003 — a reporting period of 364 days, on form CMS-2540-96, settled with audit, processed by CMS on October 17, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,408,358 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,705,384 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$297,026 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $39,518 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $58,574 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$316,082 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 16,934 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 142 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 34.71 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 181.16 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 119.25 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 234742, read from the public cost report file SNFFY2003.zip.
Fiscal year 2002, ended September 30, 2002
Cost report for October 1, 2001 to September 30, 2002 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on September 8, 2005.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,297,364 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,552,138 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$254,774 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $76,311 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
| Total other expenses | $2 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$178,465 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 16,991 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 135 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 33.09 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 216.07 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 125.86 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 232532, read from the public cost report file SNFFY2002.zip.
Fiscal year 2001, ended September 30, 2001
Cost report for October 1, 2000 to September 30, 2001 — a reporting period of 364 days, on form CMS-2540-96, settled, processed by CMS on April 27, 2004.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,058,835 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,573,791 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$514,956 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $301,270 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: −$213,686 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 17,366 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 108 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 28.53 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 288.05 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 160.8 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 173127, read from the public cost report file SNFFY2001.zip.
Fiscal year 2000, ended September 30, 2000
Cost report for April 1, 2000 to September 30, 2000 — a reporting period of 182 days, not a full year, on form CMS-2540-96, settled, processed by CMS on February 13, 2003.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $1,140,604 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $1,000,756 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | $139,848 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other income | $188,392 | CMS-2540-96 worksheet G300000 line 2600 column 100 |
Net income: $328,240 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 9,735 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 41 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 42.21 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 349.68 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 237.44 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 128249, read from the public cost report file SNFFY2000.zip.
Fiscal year 1999, ended March 31, 1999
Cost report for April 1, 1998 to March 31, 1999 — a reporting period of 364 days, on form CMS-2540-96, settled with audit, processed by CMS on October 18, 2000.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,259,461 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,517,747 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$258,286 | CMS-2540-96 worksheet G300000 line 500 column 100 |
Net income: −$258,286 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 21,020 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 143 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 27.83 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 212.21 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 146.99 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 75138, read from the public cost report file SNFFY1998.zip.
Fiscal year 1998, ended March 31, 1998
Cost report for April 1, 1997 to March 31, 1998 — a reporting period of 364 days, on form CMS-2540-96, reopened, processed by CMS on May 4, 2001.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $2,612,743 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $2,717,730 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$104,987 | CMS-2540-96 worksheet G300000 line 500 column 100 |
Net income: −$104,987 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 60 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 18,823 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 148 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 41.55 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 197.21 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 127.18 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 75135, read from the public cost report file SNFFY1997.zip.
Fiscal year 1997, ended March 31, 1997
Cost report for April 1, 1996 to March 31, 1997 — a reporting period of 364 days, on form CMS-2540-96, reopened, processed by CMS on April 12, 2000.
| Figure | As filed | Where it comes from |
|---|---|---|
| Net patient revenue | $3,008,898 | CMS-2540-96 worksheet G300000 line 300 column 100 |
| Total operating expenses | $3,266,025 | CMS-2540-96 worksheet G200002 line 1500 column 100 |
| Net income from service to patients | −$257,127 | CMS-2540-96 worksheet G300000 line 500 column 100 |
| Total other expenses | $58,467 | CMS-2540-96 worksheet G300000 line 3100 column 100 |
Net income: −$315,594 (CMS-2540-96 worksheet G300000 line 3200 column 100). As filed, net income for the period equals net income from service to patients plus total other income, less total other expenses (Worksheet G-3 lines 5 plus 26 less 31) on 192,460 of the 192,462 reports filed on Form CMS-2540-96 in publication years 1995-2012 that file every line it is computed from (99.99%); on 2 of them the filed figure and that arithmetic differ, by a median of $46,907, and those figures are not shown. A further 2,252 reports file net income without filing net income from service to patients (Worksheet G-3 line 5), so the arithmetic cannot be applied to them and their figure is shown as filed.
| Figure | As filed | Where it comes from |
|---|---|---|
| Total facility beds, all components | 58 | CMS-2540-96 worksheet S300001 line 900 column 100 |
| Total patient days, all components | 17,687 | CMS-2540-96 worksheet S300001 line 900 column 700 |
| Total discharges, all components | 141 | CMS-2540-96 worksheet S300001 line 900 column 1200 |
| Average length of stay, Medicare, in days | 41.98 | CMS-2540-96 worksheet S300001 line 900 column 1400 |
| Average length of stay, Medicaid, in days | 231.96 | CMS-2540-96 worksheet S300001 line 900 column 1500 |
| Average length of stay, all patients, in days | 125.44 | CMS-2540-96 worksheet S300001 line 900 column 1600 |
CMS report record 75133, read from the public cost report file SNFFY1996.zip.
Nurse staffing
Nurse staffing hours from the Payroll-Based Journal, quarter by quarter, are on this facility’s staffing page, each quarter with the file it came from.
Ownership, as filed with CMS
Care Compare
As filed in the CMS file dated September 1, 2026 (Care Compare ownership).
| Owner or manager | Role | Type | Ownership percentage | Association |
|---|---|---|---|---|
| BANGERTER, EDWARD | ADP OF THE SNF | Individual | NOT APPLICABLE | since 12/30/2019 |
| BANGERTER, JOHNATHAN | ADP OF THE SNF | Individual | NOT APPLICABLE | since 02/25/2020 |
| BUNOT, NANCY | ADP OF THE SNF | Individual | NOT APPLICABLE | since 01/25/2008 |
| CAPENER, RICHARD | ADP OF THE SNF | Individual | NOT APPLICABLE | since 11/01/2022 |
| CONNELL, ERIC | ADP OF THE SNF | Individual | NOT APPLICABLE | since 10/05/2020 |
| ROCKY MOUNTAIN CARE EVANSTON INC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 11/11/2025 |
| ROCKY MOUNTAIN CARE LLC | ADP OF THE SNF | Organization | NOT APPLICABLE | since 11/06/2025 |
| CONNELL, ERIC | CORPORATE OFFICER | Individual | NOT APPLICABLE | since 10/05/2020 |
| BANGERTE, NATHAN | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| BANGERTER, EDWARD | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| BANGERTER, JOHNATHAN | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| BEEMAN, RAYMOND | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/22/2022 |
| BOARDMAN, LAURA | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/22/2022 |
| DARBY, MEGAN | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| GATHERUM, JASON | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| HALE, FREDRICK | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/22/2022 |
| HANSEN, KENT | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| MIKESELL, BRADLEY | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/22/2022 |
| MORRISON, ROBERT | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/30/2025 |
| NEVES, COURTNEY | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| OWENS, JON | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| SAMUELSON, LANCE | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/22/2022 |
| SIMMONS, BENJAMIN | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/30/2025 |
| SNOWBALL, KELLY | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 11/01/2025 |
| WIDDISON, ALAN | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/22/2022 |
| WINTERHOLLER, DAVID | MANAGING CONTROL - GOVERNING BODY | Individual | NOT APPLICABLE | since 09/30/2025 |
| BUNOT, NANCY | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 01/25/2008 |
| CAPENER, RICHARD | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 11/01/2022 |
| CONNELL, ERIC | OPERATIONAL/MANAGERIAL CONTROL | Individual | NOT APPLICABLE | since 10/05/2020 |
| ROCKY MOUNTAIN CARE EVANSTON INC | OPERATIONAL/MANAGERIAL CONTROL | Organization | NOT APPLICABLE | since 09/15/2017 |
Medicare enrollment
As filed in the CMS file dated August 1, 2026 (Medicare enrollment ownership), under the enrollment of NORTH BIG HORN HOSPITAL DISTRICT (enrollment ID O20171115000310).
CMS paused the expanded ownership disclosure on Form CMS-855A in guidance dated December 11, 2025; where the private equity, real estate investment trust or holding company field below has not been filed under the current cycle, it reads “Paused by CMS”.
| Owner | Individual or organization | Role | Ownership percentage | Association date | Described in the filing as |
|---|---|---|---|---|---|
| EDWARD L BANGERTER | Individual | ADP OF THE SNF | Not stated in the filing | 12/30/2019 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ERIC S CONNELL | Individual | ADP OF THE SNF | Not stated in the filing | 10/5/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JOHNATHAN BANGERTER | Individual | ADP OF THE SNF | Not stated in the filing | 2/25/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| NANCY BUNOT | Individual | ADP OF THE SNF | Not stated in the filing | 1/25/2008 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| RICHARD J CAPENER | Individual | ADP OF THE SNF | Not stated in the filing | 11/1/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ROCKY MOUNTAIN CARE EVANSTON INC | Organization | ADP OF THE SNF | Not stated in the filing | 11/11/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| ROCKY MOUNTAIN CARE LLC | Organization | ADP OF THE SNF | Not stated in the filing | 11/6/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| No owner named in the filing | Organization | ADP OF THE SNF | Not stated in the filing | 4/9/2020 | Private equity company: No Real estate investment trust: No Holding company: No |
| No owner named in the filing | Organization | ADP OF THE SNF | Not stated in the filing | 11/5/2025 | Private equity company: No Real estate investment trust: No Holding company: No |
| No owner named in the filing | Individual | ADP OF THE SNF | Not stated in the filing | 12/30/2019 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ERIC S CONNELL | Individual | CORPORATE OFFICER | Not stated in the filing | 10/5/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ALAN KRIS WIDDISON | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/22/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| BENJAMIN TODD SIMMONS | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/30/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| BRADLEY MIKESELL | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/22/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| COURTNEY C NEVES | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| DAVID WINTERHOLLER | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/30/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| EDWARD L BANGERTER | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| FREDRICK HALE | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/22/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JASON GATHERUM | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JOHNATHAN BANGERTER | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| JON K OWENS | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| KELLY SNOWBALL | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| KENT W HANSEN | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| LANCE D SAMUELSON | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/22/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| LAURA BOARDMAN | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/22/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| MEGAN DARBY | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| NATHAN BANGERTE | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 11/1/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| RAYMOND N BEEMAN | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/22/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ROBERT B MORRISON | Individual | MANAGING CONTROL - GOVERNING BODY | Not stated in the filing | 9/30/2025 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ERIC S CONNELL | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 10/5/2020 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| NANCY BUNOT | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 1/25/2008 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| RICHARD J CAPENER | Individual | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 11/1/2022 | Private equity company: Paused by CMS Real estate investment trust: Paused by CMS Holding company: Paused by CMS |
| ROCKY MOUNTAIN CARE EVANSTON INC | Organization | OPERATIONAL/MANAGERIAL CONTROL | Not stated in the filing | 9/15/2017 | Private equity company: No Real estate investment trust: No Holding company: No |
Changes in ownership
- March 1, 2026: LANCE D SAMUELSON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: DARCY ROBERTSON no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: DARCY ROBERTSON no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ALAN KRIS WIDDISON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: BRADLEY MIKESELL no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROCKY MOUNTAIN CARE LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: NORTH BIG HORN HOSPITAL DISTRICT no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: LAURA BOARDMAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: EDWARD L BANGERTER no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RAYMOND N BEEMAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: FREDRICK HALE no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROBERT B MORRISON (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 30, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RICHARD J CAPENER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RICHARD J CAPENER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: KELLY SNOWBALL (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: BENJAMIN TODD SIMMONS (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 30, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: LANCE D SAMUELSON (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROCKY MOUNTAIN CARE EVANSTON INC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: MEGAN DARBY (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: COURTNEY C NEVES (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ALAN KRIS WIDDISON (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JASON GATHERUM (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: A listing under ADP OF THE SNF, with no owner named, first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since April 9, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: BRADLEY MIKESELL (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JOHNATHAN BANGERTER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since February 25, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JOHNATHAN BANGERTER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: KENT W HANSEN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ERIC S CONNELL (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since October 5, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ERIC S CONNELL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since October 5, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: NANCY BUNOT (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since January 25, 2008. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: NATHAN BANGERTE (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROCKY MOUNTAIN CARE LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 6, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JON K OWENS (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: LAURA BOARDMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: EDWARD L BANGERTER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since December 30, 2019. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: EDWARD L BANGERTER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: DAVID WINTERHOLLER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 30, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RAYMOND N BEEMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: FREDRICK HALE (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 15, 2023: PAUL BANGERTER no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
- March 15, 2023: JOSEPH H PARKS no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
- March 15, 2023: LANCE D SAMUELSON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 15, 2023; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
- March 15, 2023: DARCY ROBERTSON (OFFICER) first listed in CMS’s Medicare enrollment ownership file on March 15, 2023; associated with this enrollment since January 7, 2019. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
- March 15, 2023: ALAN KRIS WIDDISON (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 15, 2023; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
- March 15, 2023: BRADLEY MIKESELL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 15, 2023; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
- March 15, 2023: LAURA BOARDMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 15, 2023; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
- March 15, 2023: RAYMOND N BEEMAN (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 15, 2023; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2023-03-15.csv
Recent changes on this record
- March 1, 2026: LANCE D SAMUELSON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: DARCY ROBERTSON no longer appears as W-2 MANAGING EMPLOYEE in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: DARCY ROBERTSON no longer appears as CORPORATE OFFICER in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ALAN KRIS WIDDISON no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: BRADLEY MIKESELL no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROCKY MOUNTAIN CARE LLC no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: NORTH BIG HORN HOSPITAL DISTRICT no longer appears as 5% OR GREATER DIRECT OWNERSHIP INTEREST in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: LAURA BOARDMAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: EDWARD L BANGERTER no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RAYMOND N BEEMAN no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: FREDRICK HALE no longer appears as OPERATIONAL/MANAGERIAL CONTROL in the Medicare enrollment ownership file. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROBERT B MORRISON (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 30, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RICHARD J CAPENER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RICHARD J CAPENER (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: KELLY SNOWBALL (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: BENJAMIN TODD SIMMONS (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 30, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: LANCE D SAMUELSON (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROCKY MOUNTAIN CARE EVANSTON INC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 11, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: MEGAN DARBY (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: COURTNEY C NEVES (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ALAN KRIS WIDDISON (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JASON GATHERUM (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: A listing under ADP OF THE SNF, with no owner named, first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since April 9, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: BRADLEY MIKESELL (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JOHNATHAN BANGERTER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since February 25, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JOHNATHAN BANGERTER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: KENT W HANSEN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ERIC S CONNELL (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since October 5, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ERIC S CONNELL (OPERATIONAL/MANAGERIAL CONTROL) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since October 5, 2020. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: NANCY BUNOT (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since January 25, 2008. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: NATHAN BANGERTE (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: ROCKY MOUNTAIN CARE LLC (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 6, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: JON K OWENS (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: LAURA BOARDMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: EDWARD L BANGERTER (ADP OF THE SNF) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since December 30, 2019. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: EDWARD L BANGERTER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since November 1, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: DAVID WINTERHOLLER (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 30, 2025. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: RAYMOND N BEEMAN (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- March 1, 2026: FREDRICK HALE (MANAGING CONTROL - GOVERNING BODY) first listed in CMS’s Medicare enrollment ownership file on March 1, 2026; associated with this enrollment since September 22, 2022. Skilled_Nursing_Facility_All_Owners_:_2026-03-01.csv
- February 6, 2026: A cost report was filed for fiscal year 2025, on form CMS-2540-10. SNF10FY2024.zip
Inspections
| Inspection cycle | Health inspection | Fire safety inspection | Health deficiencies | Fire safety deficiencies |
|---|---|---|---|---|
| 1 | April 16, 2026 | April 16, 2026 | 3 | 1 |
| 2 | August 22, 2024 | August 22, 2024 | 5 | 2 |
| 3 | June 29, 2023 | June 29, 2023 | 1 | 0 |
From the Care Compare inspection summary file NH_SurveySummary_Sep2026_2.csv, processed on September 1, 2026.
Deficiencies cited
9 deficiencies on file, newest inspection first
| Inspection date | Inspection type | Tag | Category | What was cited | Scope and severity | Complaint | Corrected | Correction date |
|---|---|---|---|---|---|---|---|---|
| April 16, 2026 | Health | F 0553 | Resident Rights Deficiencies | Allow resident to participate in the development and implementation of his or her person-centered plan of care. | D | No | Deficient, Provider has date of correction | May 19, 2026 |
| April 16, 2026 | Health | F 0679 | Quality of Life and Care Deficiencies | Provide activities to meet all resident's needs. | D | No | Deficient, Provider has date of correction | May 19, 2026 |
| April 16, 2026 | Health | F 0812 | Nutrition and Dietary Deficiencies | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | F | No | Deficient, Provider has date of correction | May 19, 2026 |
| March 19, 2025 | Health | F 0689 | Quality of Life and Care Deficiencies | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | G | Yes | Past Non-Compliance | March 7, 2025 |
| September 18, 2024 | Health | F 0600 | Freedom from Abuse, Neglect, and Exploitation Deficiencies | Protect each resident from all types of abuse such as physical, mental, sexual abuse, physical punishment, and neglect by anybody. | G | Yes | Past Non-Compliance | September 5, 2024 |
| August 22, 2024 | Health | F 0623 | Resident Rights Deficiencies | Provide timely notification to the resident, and if applicable to the resident representative and ombudsman, before transfer or discharge, including appeal rights. | D | No | Deficient, Provider has date of correction | September 27, 2024 |
| August 22, 2024 | Health | F 0645 | Resident Assessment and Care Planning Deficiencies | PASARR screening for Mental disorders or Intellectual Disabilities | D | No | Deficient, Provider has date of correction | September 27, 2024 |
| August 22, 2024 | Health | F 0847 | Administration Deficiencies | Inform resident or representatives choice to enter into binding arbitration agreement and right to refuse. | D | No | Deficient, Provider has date of correction | September 27, 2024 |
| June 29, 2023 | Health | F 0732 | Nursing and Physician Services Deficiencies | Post nurse staffing information every day. | B | No | Deficient, Provider has date of correction | July 3, 2023 |
From the Care Compare health citations file NH_HealthCitations_Sep2026_2.csv, processed on September 1, 2026.
Penalties
| Penalty date | Type | Fine amount | Payment denial began | Payment denial, days | Fine ID |
|---|---|---|---|---|---|
| March 19, 2025 | Fine | $7,220 | 100447 | ||
| August 22, 2024 | Fine | $6,168 | 100441 |
From the Care Compare penalties file NH_Penalties_Sep2026_2.csv, processed on September 1, 2026.
Care Compare provider information
| Field | As filed |
|---|---|
| Provider Type | Medicare and Medicaid |
| Ownership Type | Non profit - Corporation |
| Legal Business Name | NORTH BIG HORN HOSPITAL DISTRICT |
| Date First Approved to Provide Medicare and Medicaid Services | 1989-09-19 |
| Provider Resides in Hospital | N |
| Continuing Care Retirement Community | N |
| Urban | N |
| County/Parish | Uinta |
| Telephone Number | 3077890726 |
| Chain Name | ROCKY MOUNTAIN CARE |
| Chain ID | 455 |
| Provider Changed Ownership in Last 12 Months | N |
| With a Resident and Family Council | Resident |
| Automatic Sprinkler Systems in All Required Areas | Yes |
| Number of Certified Beds | 60 |
| Average Number of Residents per Day | 49.0 |
| Overall Rating | 5 |
| Health Inspection Rating | 4 |
| QM Rating | 5 |
| Long-Stay QM Rating | 5 |
| Short-Stay QM Rating | 5 |
| Processing Date | 2026-09-01 |
From the Care Compare Provider Information file NH_ProviderInfo_Sep2026_3.csv, processed on September 1, 2026.
Get an email when this record changes
One email a day naming what moved on Rocky Mountain Care - Evanston: the field, the value before, the value after, and the date of the file that first showed it.
The facility alert follows this one record: a cost report filed or a figure on one changed, an inspection, a deficiency or a penalty recorded, an owner added or removed. The certification number arrives filled in.
On February 6, 2026: A cost report was filed for fiscal year 2025, on form CMS-2540-10. That is one line of the alert.
Following a list of facilities? The portfolio watch follows up to 100 certification numbers you name, on one subscription — on the alerts page.
The citable document for Rocky Mountain Care - Evanston
This page shows the record as it stands today. The report is the citable document: the same figures with the cell each came from, and beyond this page — five facilities of a similar size in Wyoming at the same fiscal year, listed by name; every change on the record rather than the recent ones below; the inspection and staffing history in blocks of their own; and a citation block naming every CMS file it was read from.
Other public records in Wyoming
- SHERIDAN, CITY OF, SHERIDAN Water discharge permit
- EVANSTON, CITY OF, EVANSTON Water discharge permit
- DOUGLAS, TOWN OF, DOUGLAS Water discharge permit
- GILLETTE, CITY OF, GILLETTE Water discharge permit
- WORLAND, CITY OF, WORLAND Water discharge permit
- THERMOPOLIS, TOWN OF, THERMOPOLIS Water discharge permit
- TORRINGTON, CITY OF, TORRINGTON Water discharge permit
- KEMMERER-DIAMONDVILLE JOINT POWERS BOARD, KEMMERER Water discharge permit
- PALE HORSE COMPRESSOR STATION (JACKALOPE GAS GATHERING SERVICES), CONVERSE COUNTY Air emission source
- T55 COMPRESSOR STATION (THUNDER CREEK GAS SERVICES), CONVERSE COUNTY Air emission source
- LEWIS & LEWIS, INC.(CT-1235), ROCK SPRINGS Air emission source
- PORTABLE HOT MIX ASPHALT PLANT (SIMON CONTRACTORS), CHEYENNE Air emission source
- SCHERER BROTHERS CONSTRUCTION, CASPER Air emission source
- DOMSON, INCORPORATED, TORRINGTON Air emission source
- INTERMOUNTAIN CONTRUCTION CT-1216, GILLETTE Air emission source
- ELLINGFORD BROTHERS, INC., EVANSTON Air emission source
Every figure on this page is printed as it appears in the CMS file named beside it. A figure that does not match its file? Tell us on the corrections page, quoting certification number 535038.