Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
We’ll email you a link to confirm. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES AKR10H0EB

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC, Near Crown Point, AK: NPDES AKR10H0EB discharge permit, effluent exceedances, inspections, penalties

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC, held by David Kabella, holds NPDES permit AKR10H0EB. EPA’s file records it issued September 20, 2023 and expiring January 31, 2026.

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC, Near Crown Point, Alaska: Coverage under a general permit AKR10H0EB, held by David Kabella; Construction stormwater; Effective; issued September 20, 2023, term to January 31, 2026, by Alaska Department of Environmental Conservation; Other Heavy and Civil Engineering Construction.

Alaska holds 1,371 Construction stormwater coverages of this permit type in EPA’s file; 480 were issued before AKR10H0EB. David Kabella holds 2 permits in Alaska.

Other permits held by David Kabella

Coverages issued nearest AKR10H0EB

TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC among its neighbors

EPA’s permit file holds 3 discharge permits in the Trail Lake-Trail River subwatershed (HUC 190203021007), AKR10H0EB among them. Its county holds 243, 9 of them major permits; AKR10H0EB is a minor permit.

Other permits in the Trail Lake-Trail River subwatershed (HUC 190203021007)

What the register holds for TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC: its NPDES ID, its permit type and status, its dates, its address in Near Crown Point, Alaska. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES AKR10H0EB.

Identity

Facility as filedTRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC
Permittee as filedDavid Kabella
NPDES IDAKR10H0EB
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedSeptember 20, 2023
Expiration dateJanuary 31, 2026
Issuing agencyAlaska Department of Environmental Conservation
AddressNear Crown Point, AK 99631
SubwatershedTrail Lake-Trail River (HUC 190203021007)
NAICS237990 – Other Heavy and Civil Engineering Construction
SIC1542 – Nonresidential Construction

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES AKR10H0EB.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES AKR10H0EB.

Inspections

EPA’s inspection file holds no inspection for NPDES AKR10H0EB.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES AKR10H0EB.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, AKR10H0EB.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.

What this page shows

The TRAIL RIVER BRIDGE 25.7 AND FALLS CREEK BRIDGE 25.4 REPLACEMENT - ARRC permit is one of 3 NPDES permits in the Trail Lake-Trail River subwatershed, this one included. Among the 127 storm water construction permits on EPA's NPDES register in Kenai Peninsula Borough, this one is also counted, and 35.8% of the 123 storm water construction permits in that borough were issued before it. Of those 127 storm water construction permits in Kenai Peninsula Borough, 0.0% carry a violation on file, and this permit has none of the pollutant limit or effluent exceedance records, each at 0.