Velarion Records
Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
We’ll email you a link to confirm. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
Also free: The Pay Desk, the weekly executive pay briefing.

Clean Water Act discharge permit · NPDES FLR05I202

HYDRO PRECISION TUBING ROCKLEDGE, Rockledge, FL: NPDES FLR05I202 discharge permit, effluent exceedances, inspections, penalties

HYDRO PRECISION TUBING ROCKLEDGE, held by Hydro Precision Tubing Rockledge, holds NPDES permit FLR05I202. EPA’s file records it issued April 6, 2018 and expiring April 5, 2023. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

Identity

Facility as filedHYDRO PRECISION TUBING ROCKLEDGE
Permittee as filedHydro Precision Tubing Rockledge
NPDES IDFLR05I202
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramIndustrial stormwater
IssuedApril 6, 2018
Expiration dateApril 5, 2023
Issuing agencyFlorida Department of Environmental Protection
AddressRockledge, FL 32955
Receiving water impaired303(D) Listed
SubwatershedIndian River Lagoon (HUC 030802020302)
NAICS331318 – Other Aluminum Rolling, Drawing, and Extruding
SIC3355 – Aluminum Rolling And Drawing

Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.

Effluent limits and exceedances

An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.

Pollutant or measureLimitsViolations, any kindEffluent exceedancesLatest exceedanceLargest exceedance, as filed
Zinc, total recoverable200
Copper, total recoverable200

EPA’s effluent violation file records no exceedance of a numeric limit for NPDES FLR05I202.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

DateWhat EPA recordedAgency
April 2, 2019WW Storm Water Non-Construction - Failure to Maintain RecordsST6
April 2, 2019WW Storm Water Non-Construction - Failure to MonitorST6

Velarion’s copy of EPA’s ICIS-NPDES files does not include the inspections, formal enforcement actions and informal enforcement actions files, so this page shows none of them. EPA’s free Detailed Facility Report on ECHO lists this permit’s inspections, enforcement actions and penalties.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR05I202.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR05I202 there.

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.

What this page shows

This public-records page covers NPDES permit FLR05I202, held by Hydro Precision Tubing Rockledge in Rockledge, FL, which is listed as Effective with the Florida Department of Environmental Protection as issuing agency. The facts show 0 pollutants under a numeric limit and 0 pollutants with an effluent exceedance, with the permit issued April 6, 2018 and expiring April 5, 2023, and the page notes that current standing should be checked in EPA's Detailed Facility Report on ECHO.