Clean Water Act discharge permit · NPDES FLR10VA44

COLDWATER SUBSTATION, Milton, FL: NPDES FLR10VA44 discharge permit, effluent exceedances, inspections, penalties

COLDWATER SUBSTATION, held by Coastal Electrical Construction, holds NPDES permit FLR10VA44. EPA’s file records it issued March 13, 2022 and expiring March 12, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

What the register holds for COLDWATER SUBSTATION: its NPDES ID, its permit type and status, its dates, its address in Milton, Florida. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES FLR10VA44.

Identity

Facility as filedCOLDWATER SUBSTATION
Permittee as filedCoastal Electrical Construction
NPDES IDFLR10VA44
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedMarch 13, 2022
Expiration dateMarch 12, 2027
Issuing agencyFlorida Department of Environmental Protection
AddressMilton, FL 32570
SubwatershedWright Basin (HUC 031401040503)

Cited to the EPA ICIS-NPDES permit file (ECHO download).

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR10VA44.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES FLR10VA44.

Velarion’s copy of EPA’s ICIS-NPDES files does not include the inspections, formal enforcement actions and informal enforcement actions files, so this page shows none of them. EPA’s free Detailed Facility Report on ECHO lists this permit’s inspections, enforcement actions and penalties.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR10VA44.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID FLR10VA44 there.

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

COLDWATER SUBSTATION, a Storm Water Construction permit held by Coastal Electrical Construction, is one of 131 storm water construction permits on EPA's NPDES register in Santa Rosa County, and it sits among 44 NPDES permits in the Wright Basin subwatershed, this one included. Of those 131 Santa Rosa County storm water construction permits, 0.0% have a violation on file, and this permit records no pollutants under a numeric limit and no effluent exceedances.