Clean Water Act discharge permit · NPDES FLR10YG10

WAWA #5496 - PACE, FL, Milton, FL: NPDES FLR10YG10 discharge permit, effluent exceedances, inspections, penalties

WAWA #5496 - PACE, FL, held by CBI General Contractors, holds NPDES permit FLR10YG10. EPA’s file records it issued February 8, 2026 and expiring February 7, 2031.

WAWA #5496 - PACE, FL, Milton, Florida: Coverage under a general permit FLR10YG10, held by CBI General Contractors; Construction stormwater; Effective; issued February 8, 2026, term to February 7, 2031, by Florida Department of Environmental Protection.

  • July 24, 2026: WW Storm Water Construction - Failure to Implement SWPPP/SWMP (ST6).
  • July 24, 2026: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
  • July 24, 2026: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
  • July 24, 2026: Evaluation (S).

Florida holds 15,654 Construction stormwater coverages of this permit type in EPA’s file; 12,928 were issued before FLR10YG10. CBI General Contractors holds 2 permits in Florida.

Other permits held by CBI General Contractors

  • CEFCO 432, Navarre: FLR10VY45, issued May 14, 2023

Coverages issued nearest FLR10YG10

Other permits in Milton

Identity

Facility as filedWAWA #5496 - PACE, FL
Permittee as filedCBI General Contractors
NPDES IDFLR10YG10
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedFebruary 8, 2026
Expiration dateFebruary 7, 2031
Issuing agencyFlorida Department of Environmental Protection
AddressMilton, FL 32571

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES FLR10YG10.

Inspections, violations and enforcement

DateWhat EPA recordedAgency
July 24, 2026WW Storm Water Construction - Failure to Implement SWPPP/SWMPST6
July 24, 2026WW Storm Water Construction - Failure to properly install/implement BMPsST6
July 24, 2026WW Storm Water Construction - Failure to properly operate and maintain BMPsST6

Inspections

DateWhat EPA recordedAgency
July 24, 2026EvaluationS

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES FLR10YG10.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, FLR10YG10.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The WAWA #5496 - PACE, FL storm water construction permit, held by CBI General Contractors in Milton, Florida, is one of 34 such permits in that city on the EPA NPDES register. About 29.4% of those 34 Milton storm water construction permits carry an earlier issue date than this one, and none of the 34 has a recorded violation, with 0.0% of them showing one.