Velarion Records

Clean Water Act discharge permit · NPDES GAIS14839

OXFORD CONSTRUCTION CO.- HRACEK BORROW PIT, Cuthbert, GA: NPDES GAIS14839 discharge permit, effluent exceedances, inspections, penalties

OXFORD CONSTRUCTION CO.- HRACEK BORROW PIT, held by Oxford Construction Company, holds NPDES permit GAIS14839. EPA’s file records it issued June 1, 2022 and expiring May 31, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.

Identity

Facility as filedOXFORD CONSTRUCTION CO.- HRACEK BORROW PIT
Permittee as filedOxford Construction Company
NPDES IDGAIS14839
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramIndustrial stormwater
IssuedJune 1, 2022
Expiration dateMay 31, 2027
AddressCuthbert, GA 39840
SubwatershedCool Branch-Chattahoochee River (HUC 031300030905)
SIC1442 – Construction Sand And Gravel

Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.

Effluent limits and exceedances

An effluent exceedance is a discharge monitoring report value over the permit’s numeric limit (EPA’s violation code E90). A violation of any kind also counts a report not filed. Each row is EPA’s own count for that pollutant.

Pollutant or measureLimitsViolations, any kindEffluent exceedancesLatest exceedanceLargest exceedance, as filed
pH2120
Solids, total suspended160
Chemical Oxygen Demand [COD]160

EPA’s effluent violation file records no exceedance of a numeric limit for NPDES GAIS14839.

Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES GAIS14839.

Velarion’s copy of EPA’s ICIS-NPDES files does not include the inspections, formal enforcement actions and informal enforcement actions files, so this page shows none of them. EPA’s free Detailed Facility Report on ECHO lists this permit’s inspections, enforcement actions and penalties.

Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GAIS14839.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID GAIS14839 there.

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.

What this page shows

This public-records page covers NPDES permit GAIS14839, held by Oxford Construction Company for the OXFORD CONSTRUCTION CO.- HRACEK BORROW PIT in Cuthbert, GA, with a status of Effective and an expiration date of May 31, 2027. The facts list 3 pollutants on file, 3 under a numeric limit, and 3 with a violation of any kind, with 0 pollutants showing an effluent exceedance.

Follow this permit Velarion Records emails you this permit’s record, cited to the public filing, and tells you when the register changes it. Free.
We’ll email you a link to confirm. The continuous daily watch on every change is the paid alert. Unsubscribe any time.