NPDES GAR18B42D · Clean Water Act
113 ASH CT LK ARWHD, Waleska, GA: NPDES GAR18B42D discharge permit, effluent exceedances, inspections, penalties
113 ASH CT LK ARWHD, Waleska, Georgia: General permit coverage GAR18B42D, held by Dave Logel; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B42D.
Coverages issued nearest GAR18B42D
- 2023-08-01: LAMAR DAVIS BROILER HOUSES, Pearson: GAR18B426, held by Lamar Davis
- 2023-08-01: 384 CURK ROBERTS ROAD, Braselton: GAR18B428, held by Borza Kitchen and Bath, LLC
- 2023-08-01: FLETC STRENGTH & CONDITIONING COMPLEX, Brunswick: GAR18B42A, held by FLETC - GLYNCO
- 2023-08-01: LAKESIDE BAPTIST CHURCH, Eatonton: GAR18B42B, held by Eatonton
- 2023-08-01: ATFP: REPAIR BASE PERIMETER FENCING, 165AW, Savannah: GAR18B42C, held by Lt Col Timothy Riley
- 2023-08-01: WOGHIREN ESTATE, Acworth: GAR18B42E, held by David Woghiren
- 2023-08-01: GORDON COUNTY LANDFILL - CONSTRUCTION OF CELL 2D, Ranger: GAR18B42F, held by James Ledbetter
- 2023-08-01: REEVES CREEK INFRASTRUCTURE, Stockbridge: GAR18B430, held by 300 Reeves Creek LLC
- 2023-08-01: COUTESY PKWY EXT. FROM FLAT SHOALS RD TO OLD COVINGTON HWY, Conyers: GAR18B431, held by Rockdale County
- 2023-08-01: LOT 64, Alpharetta: GAR18B432, held by Joun Hanna
113 ASH CT LK ARWHD among its neighbors
124 discharge permits are in the Lake Arrowhead subwatershed (HUC 031501040703); GAR18B42D is one.
Other permits in the Lake Arrowhead subwatershed (HUC 031501040703)
- 100 DIANE COURT, Waleska: GAR396FCF, minor, term to 2028-07-31
- 101 COATI COURT, Waleska: GAR396B90, minor, term to 2028-07-31
- 102 LOUIE COURT, Waleska: GAR3973F3, minor, term to 2028-07-31
- 105 PIMAS COURT, Waleska: GAR3975C3, minor, term to 2028-07-31
- 106 FIR COURT, Waleska: GAR396349, minor, term to 2025-01-31
- 106 TULIP CREEK COURT, Waleska: GAR18B3EE, minor, term to 2028-07-31
- 109 CHICKASAW DRIVE, Waleska: GAR39615B, minor, term to 2025-01-31
- 109 ELDER COURT, Waleska: GAR3968D6, minor, term to 2028-07-31
- 109 MAPLE COURT, Waleska: GAR395D9A, minor, term to 2025-01-31
- 113 CHICKASAW DRIVE, Waleska: GAR39615D, minor, term to 2025-01-31
What stands out
- Its term runs 4 years and 365 days, August 1, 2023 to July 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 45,725 discharge permits on the register in Georgia; 40,604 of them (89%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | 113 ASH CT LK ARWHD |
|---|---|
| Permittee | Dave Logel |
| NPDES ID | GAR18B42D |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expires | July 31, 2028 |
| Address | Waleska, GA 30183 |
| Subwatershed | Lake Arrowhead (HUC 031501040703) |
NPDES GAR18B42D: effluent limits and exceedances
113 ASH CT LK ARWHD (NPDES GAR18B42D): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES GAR18B42D: no pollutant row on file.
NPDES GAR18B42D: inspections, violations and enforcement
NPDES GAR18B42D (113 ASH CT LK ARWHD): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES GAR18B42D
NPDES GAR18B42D: one email when its EPA record changes — $99/month.
Permits near NPDES GAR18B42D
NPDES GAR18B42D: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.