Clean Water Act discharge permit · NPDES GAR18B430
REEVES CREEK INFRASTRUCTURE, Stockbridge, GA: NPDES GAR18B430 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
REEVES CREEK INFRASTRUCTURE, held by 300 Reeves Creek LLC, holds NPDES permit GAR18B430. EPA’s file records it issued August 1, 2023 and expiring July 31, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for REEVES CREEK INFRASTRUCTURE: its NPDES ID, its permit type and status, its dates, its address in Stockbridge, Georgia. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES GAR18B430.
Identity
| Facility as filed | REEVES CREEK INFRASTRUCTURE |
|---|---|
| Permittee as filed | 300 Reeves Creek LLC |
| NPDES ID | GAR18B430 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expiration date | July 31, 2028 |
| Address | Stockbridge, GA 30281 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Little Suwanee Creek-Yellow River (HUC 030701030301) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES GAR18B430.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES GAR18B430.
Inspections
EPA’s inspection file holds no inspection for NPDES GAR18B430.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES GAR18B430.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GAR18B430.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID GAR18B430 there.
REEVES CREEK INFRASTRUCTURE, Stockbridge, Georgia: Coverage under a general permit GAR18B430, held by 300 Reeves Creek LLC; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B430. 300 Reeves Creek LLC holds 2 permits in Georgia.
Other permits held by 300 Reeves Creek LLC
- REEVES CREEK POD C & D, Stockbridge: GAR3968C9, issued 2023-08-01
Coverages issued nearest GAR18B430
- 2023-08-01: LAKESIDE BAPTIST CHURCH, Eatonton: GAR18B42B, held by Eatonton
- 2023-08-01: ATFP: REPAIR BASE PERIMETER FENCING, 165AW, Savannah: GAR18B42C, held by Lt Col Timothy Riley
- 2023-08-01: 113 ASH CT LK ARWHD, Waleska: GAR18B42D, held by Dave Logel
- 2023-08-01: WOGHIREN ESTATE, Acworth: GAR18B42E, held by David Woghiren
- 2023-08-01: GORDON COUNTY LANDFILL - CONSTRUCTION OF CELL 2D, Ranger: GAR18B42F, held by James Ledbetter
- 2023-08-01: COUTESY PKWY EXT. FROM FLAT SHOALS RD TO OLD COVINGTON HWY, Conyers: GAR18B431, held by Rockdale County
- 2023-08-01: LOT 64, Alpharetta: GAR18B432, held by Joun Hanna
- 2023-08-01: LOT 68, Alpharetta: GAR18B433, held by Joun Hanna
- 2023-08-01: LOT 40, Alpharetta: GAR18B434, held by Alexandria Holdings Group Inc
- 2023-08-01: CASTELLO FABRICATION, Covington: GAR18B435, held by O'NEIL CASTELLO
REEVES CREEK INFRASTRUCTURE among its neighbors
639 discharge permits are in the Little Suwanee Creek-Yellow River subwatershed (HUC 030701030301); GAR18B430 is one.
Other permits in the Little Suwanee Creek-Yellow River subwatershed (HUC 030701030301)
- 1 CABIN DRIVE DEVELOPMENT, Conley: GAR18C1C4, minor, term to 2028-07-31
- 1001 MOSELEY ROAD - TRACT 3, Stockbridge: GAR397746, minor, term to 2028-07-31
- 1009 MOSELEY ROAD - TRACT 1, Stockbridge: GAR397744, minor, term to 2028-07-31
- 1303 LITHONIA INDUSTRIAL BLVD, Lithonia: GAR18C262, minor, term to 2028-07-31
- 1420 AZALEA DRIVE, LOT 3, Lawrenceville: GAR18BD88, minor, term to 2028-07-31
- 14300 HOPEWELL ROAD, Alpharetta: GAR18C2EF, minor, term to 2028-07-31
- 1540 SIKES ROAD, Statham: GAR3976AC, minor, term to 2028-07-31
- 1632 HOWELL BRIDGE RD, Ball Ground: GAR18C252, minor, term to 2028-07-31
- 1861 BLACK BEAR TRAIL, Big Canoe: GAR18C26E, minor, term to 2028-07-31
- 2178 NE HILLWOOD DR LOT 694-697, Conyers: GAR3976C5, minor, term to 2028-07-31
Nearby on the register
- Discharge permits in Stockbridge
- Every permit record in Stockbridge, A to Z
- Discharge permits in Georgia
- Every permit record in Georgia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
REEVES CREEK INFRASTRUCTURE is one of 93 storm water construction permits in Stockbridge, Georgia, and is one of 639 NPDES permits in the Little Suwanee Creek-Yellow River subwatershed. Of the 93 storm water construction permits in Stockbridge, 38.7% were issued earlier than this one, and 0.0% carry a violation on file.