Clean Water Act discharge permit · NPDES GAR18B71A

LAKE ERIN REHABILITATION DAM, Tucker, GA: NPDES GAR18B71A discharge permit, effluent exceedances, inspections, penalties

LAKE ERIN REHABILITATION DAM, held by Tucker, holds NPDES permit GAR18B71A. EPA’s file records it issued August 1, 2023 and expiring July 31, 2028.

LAKE ERIN REHABILITATION DAM, Tucker, Georgia: Coverage under a general permit GAR18B71A, held by Tucker; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.

Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR18B71A. Tucker holds 3 permits in Georgia.

Other permits held by Tucker

Coverages issued nearest GAR18B71A

LAKE ERIN REHABILITATION DAM among its neighbors

EPA’s permit file holds 162 discharge permits in the North Fork Peachtree Creek subwatershed (HUC 031300011201), GAR18B71A among them.

Other permits in the North Fork Peachtree Creek subwatershed (HUC 031300011201)

What the register holds for LAKE ERIN REHABILITATION DAM: its NPDES ID, its permit type and status, its dates, its address in Tucker, Georgia. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES GAR18B71A.

Identity

Facility as filedLAKE ERIN REHABILITATION DAM
Permittee as filedTucker
NPDES IDGAR18B71A
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedAugust 1, 2023
Expiration dateJuly 31, 2028
AddressTucker, GA 30084
SubwatershedNorth Fork Peachtree Creek (HUC 031300011201)

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES GAR18B71A.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES GAR18B71A.

Inspections

EPA’s inspection file holds no inspection for NPDES GAR18B71A.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES GAR18B71A.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GAR18B71A.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The LAKE ERIN REHABILITATION DAM permit, filed under the Tucker permittee name, is one of 36 storm water construction permits in Tucker, Georgia, on EPA's NPDES register, and it is one of 162 NPDES permits in the North Fork Peachtree Creek subwatershed, this one included. Of the 36 Tucker storm water construction permits, 36.1% were issued earlier than this one, and 0.0% of them have a violation on file, while this permit records no pollutants under a numeric limit and no effluent exceedances.