Clean Water Act discharge permit · NPDES GAR2543BC
EAST POINT-STONEWALL TELL ROAD, Unincorporated, GA: NPDES GAR2543BC discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
EAST POINT-STONEWALL TELL ROAD, held by Georgia Power, holds NPDES permit GAR2543BC. EPA’s file records it issued August 1, 2023 and expiring July 31, 2028.
EAST POINT-STONEWALL TELL ROAD, Unincorporated, Georgia: Coverage under a general permit GAR2543BC, held by Georgia Power; Construction stormwater; Effective; issued August 1, 2023, term to July 31, 2028.
Georgia holds 40,604 Construction stormwater coverages of this permit type in EPA’s file; 31,933 were issued before GAR2543BC. Georgia Power holds 43 permits in Georgia.
Other permits held by Georgia Power
- INTERCONNECT 333 SWITCHING STATION WHITE PINE SOLAR, Na: GAR247970, issued September 23, 2013
- ATHENA - ATHENS (BLACK) 115 KV TL, Athens: GAR24894D, issued September 24, 2013
- EAST CULVERTON SUB, N/A: GAR2493DE, issued August 1, 2018
- GPC BIG OGEECHEE SUBSTATION, N/A: GAR2493F0, issued August 1, 2018
- GPC FOUR LAKES SUBSTATION, Savannah: GAR2493F4, issued August 1, 2018
- GPC OGEECHEE RIVER ROAD SUBSTATION, Warrenton: GAR2493FE, issued August 1, 2018
- GPC LINE CREEK SUBSTATION, Palmetto: GAR2493FF, issued August 1, 2018
- PINSON - TWO RUN RANCH 230 KV PH 1, N/A: GAR249400, issued August 1, 2018
- DOUGLASVILLE LAYDOWN YARD, N/A: GAR2541B2, issued August 1, 2018
- ASHLEY PARK - CREAOLA 230 KV (CHARLES BOX OUT), N/A: GAR2541F9, issued August 1, 2023
Coverages issued nearest GAR2543BC
- August 1, 2023: RUSSELL CREEK 30-INCH RAW WATER MAIN, Dawsonville, GAR2543B7, held by Etowah Water & Sewer Authority
- August 1, 2023: BETHABARA - EAST WALTON TL P79467, Goodhope, GAR2543B8, held by John Raese
- August 1, 2023: GAINESVILLE HWY 24IN WATER TRANSMISSION MAIN-WINDER, Winder, GAR2543B9, held by City of Winder
- August 1, 2023: PI 0015593 FULTON COUNTY, ROUNDABOUT ON SR 92 @ CR 1374 / BUTNER RD, Fairburn, GAR2543BA, held by Georgia Department of Transportation
- August 1, 2023: PI 0015445 LOWDES COUNTY, ROUNDABOUTS SR 7 BUS FROM CS 188 / NORTH OAK ST TO SR, Valdosta, GAR2543BB, held by Georgia Department of Transportation
- August 1, 2023: HIGHWAY 316 HDD, Dacula, GAR2543BD, held by Jessica Watson
- August 1, 2023: HAMMONDS CHURCH ROAD EXTENSION, Lyons, GAR2543BE, held by Ron Salter
- August 1, 2023: GATEWAY CONNECTOR ROUNDABOUT, Rincon, GAR2543BF, held by Effingham County
- August 1, 2023: THOMPSON HARDWOODS WATER LINE, Hazlehurst, GAR2543C0, held by Kelly Wynn
- August 1, 2023: 2025 PRESSURE IMPROVEMENTS- ROYSTON, Royston, GAR2543C1, held by CITY OF ROYSTON
EAST POINT-STONEWALL TELL ROAD among its neighbors
EPA’s permit file holds 458 discharge permits in the Morning Creek subwatershed (HUC 031300050103), GAR2543BC among them.
Other permits in the Morning Creek subwatershed (HUC 031300050103)
- 150 OAK TERRACE, Fayetteville: GAR396817, minor permit, permit term to July 31, 2028
- 165 GADSON, Fayetteville: GAR18B2F6, minor permit, permit term to July 31, 2028
- 165 GADSON DRIVE, Fayetteville: GAR3966FC, minor permit, permit term to July 31, 2028
- 175 GADSON DRIVE, Fayetteville: GAR39677A, minor permit, permit term to July 31, 2028
- 185 GADSON DR, Fayetteville: GAR18B300, minor permit, permit term to July 31, 2028
- 185 GADSON DR, Fayetteville: GAR3966FD, minor permit, permit term to July 31, 2028
- 2532 BOLTON ROAD R.M. CLAYTON, Atlanta: GAR152059, minor permit, permit term to July 31, 2018
- A1 FOOD MART, Fayetteville: GAR18AF32, minor permit, permit term to January 31, 2025
- ADC FAYETTEVILLE, LLC HWY 85 N FAYETTEVILLE, GA, Fayetteville: GAR395F98, minor permit, permit term to January 31, 2025
- AIRPORT WEST DISTRIBUTION CENTER 600, College Park: GAR18B68A, minor permit, permit term to July 31, 2028
What the register holds for EAST POINT-STONEWALL TELL ROAD: its NPDES ID, its permit type and status, its dates, its address in Unincorporated, Georgia. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES GAR2543BC.
Identity
| Facility as filed | EAST POINT-STONEWALL TELL ROAD |
|---|---|
| Permittee as filed | Georgia Power |
| NPDES ID | GAR2543BC |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | August 1, 2023 |
| Expiration date | July 31, 2028 |
| Address | Unincorporated, GA 30349 |
| Subwatershed | Morning Creek (HUC 031300050103) |
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES GAR2543BC.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES GAR2543BC.
Inspections
EPA’s inspection file holds no inspection for NPDES GAR2543BC.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES GAR2543BC.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, GAR2543BC.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
Nearby on the register
- Discharge permits in Unincorporated
- Every permit record in Unincorporated, A to Z
- Discharge permits in Georgia
- Every permit record in Georgia, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.