Velarion Records
Free: one email when NPDES IDR10BE03 changes. Unsubscribe any time.

NPDES IDR10BE03 · Clean Water Act

PLANET CONSTRUCTION INC, Sagle, ID: NPDES IDR10BE03 discharge permit, effluent exceedances, inspections, penalties

PLANET CONSTRUCTION INC, Sagle, Idaho: General permit coverage IDR10BE03; Construction stormwater; Pending, by U.S. EPA, REGION 10; discharges to LAKE PEND OREILLE.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file.

PLANET CONSTRUCTION INC among its neighbors

14 discharge permits are in the Carr Creek-Pend Oreille River subwatershed (HUC 170102140302); IDR10BE03 is one. Its county: 71, 1 major; IDR10BE03 is a permit EPA has not classed major or minor.

Other permits in the Carr Creek-Pend Oreille River subwatershed (HUC 170102140302)

Identity

FacilityPLANET CONSTRUCTION INC
PermitteePLANET CONSTRUCTION INC
NPDES IDIDR10BE03
StatusPending
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AgencyU.S. EPA, REGION 10
AddressSagle, ID 83860
Receiving waterLAKE PEND OREILLE
SubwatershedCarr Creek-Pend Oreille River (HUC 170102140302)

NPDES IDR10BE03: effluent limits and exceedances

PLANET CONSTRUCTION INC (NPDES IDR10BE03): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES IDR10BE03: no pollutant row on file.

NPDES IDR10BE03: inspections, violations and enforcement

NPDES IDR10BE03 (PLANET CONSTRUCTION INC): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES IDR10BE03

NPDES IDR10BE03: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES IDR10BE03

NPDES IDR10BE03: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.