Clean Water Act discharge permit · NPDES IDR10C26V
RIDLEY COURT, Sandpoint, ID: NPDES IDR10C26V discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
RIDLEY COURT, held by Lippert Excavation, holds NPDES permit IDR10C26V, which discharges to 3498 Lake Ponderay. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for RIDLEY COURT: its NPDES ID, its permit type and status, its dates, its address in Sandpoint, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C26V.
Identity
| Facility as filed | RIDLEY COURT |
|---|---|
| Permittee as filed | Lippert Excavation |
| NPDES ID | IDR10C26V |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Sandpoint, ID 83864 |
| Receiving water | 3498 LAKE PONDERAY |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Carr Creek-Pend Oreille River (HUC 170102140302) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C26V.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C26V.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C26V.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C26V.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C26V.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID IDR10C26V there.
RIDLEY COURT, Sandpoint, Idaho: Coverage under a general permit IDR10C26V, held by Lippert Excavation; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to 3498 LAKE PONDERAY.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C26V. Lippert Excavation holds 3 permits in Idaho.
Other permits held by Lippert Excavation
- BOYER COMMERS PARK, Sandpoint: IDR10C20C, issued January 10, 2022
- DEERFIELD, Sandpoint: IDR10C21L, issued January 10, 2022
Coverages issued nearest IDR10C26V
- January 10, 2022: DRY CREEK RANCH VILLAGE NO. 5, Boise, IDR10C26Q, held by Boise Hunter Homes
- January 10, 2022: PINTAIL POND, Parma, IDR10C26R, held by Tyler Archibald
- January 10, 2022: MIDPOINT SUBSTATION EXPANSION, Jerome, IDR10C26S, held by Idaho Power Company
- January 10, 2022: TAXI LANE S EXTENSION WIDENING & RECONSTRUCTION (BOI), Boise, IDR10C26T, held by BOISE AIRPORT (City of Boise)
- January 10, 2022: NORSE LANDING, Caldwell, IDR10C26U, held by Norse Development LLC
- January 10, 2022: KENYON MEADOWS PHASE 3, 4 & OFFSITE SEWER UPGRADE, Twin Falls, IDR10C26W, held by Staker Parsons DBA Idaho Materials and Construction
- January 10, 2022: SNAKE RIVER CANYON NATIONAL CEMETERY, Buhl, IDR10C26X, held by Alpine Construction Management
- January 10, 2022: DOVETAIL CONDOMINIUMS, Eagle, IDR10C26Y, held by Larson Guth Construction
- January 10, 2022: MCDERMOTT VILLAGE OFF SITE, Meridian, IDR10C26Z, held by Andersen Construction
- January 10, 2022: ROCKY HILLS SUBDIVISION, Idaho Falls, IDR10C270, held by Mountain West Engineering
RIDLEY COURT among its neighbors
EPA’s permit file holds 14 discharge permits in the Carr Creek-Pend Oreille River subwatershed (HUC 170102140302), IDR10C26V among them. Its county holds 71, 1 of them major permits; IDR10C26V is a minor permit.
Other permits in the Carr Creek-Pend Oreille River subwatershed (HUC 170102140302)
- 801 ONTARIO ST, SANDPOINT, ID, Sandpoint: IDR100310, not classed
- DEERFIELD, Sandpoint: IDR10C21L, minor permit, discharging to Syringa Creek, permit term to February 9, 2027
- DOVER, CITY OF - DOVER WWTP, Dover: ID0027693, minor permit, discharging to PEND ORIELLE RIVER, permit term to January 5, 2007
- HOMESTEAD VILLAGE APPARTMENTS, Sandpoint: IDR10C0IL, minor permit, discharging to Pend Oreille River, permit term to February 9, 2027
- IDAHO GRANITE WORKS LLC, Sandpoint: IDR10B741, not classed, discharging to PEND OREILLE LAKE (SITE IS FAR FROM LAKE)
- PARK AVE CONDOS, Sandpoint: IDR10C04I, minor permit, discharging to Lake Pend Oreille, permit term to February 16, 2022
- PLANET CONSTRUCTION INC, Sagle: IDR10BE03, not classed, discharging to LAKE PEND OREILLE
- SANDPOINT, CITY OF - SANDPOINT WWTP, Sandpoint: ID0020842, major permit, discharging to PEND OREILLE RIVER, permit term to January 5, 2007
- SANDPOINT, CITY OF - SANDPOINT WWTP, Sandpoint: IDR10L0HI, not classed
- TIMBER CREEK SUBDIVISION, Sandpoint: IDR1002K5, not classed
Nearby on the register
- Discharge permits in Sandpoint
- Every permit record in Sandpoint, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.