SUNDANCE SUBDIVISION PHASE 1-14, Twin Falls, ID: NPDES IDR10C0HR discharge permit, effluent exceedances, inspections, penalties

SUNDANCE SUBDIVISION PHASE 1-14, held by Wooten Excavation, LLC, holds NPDES permit IDR10C0HR, which discharges to Cedar Draw. EPA’s file records it issued August 5, 2022 and expiring February 9, 2027.

SUNDANCE SUBDIVISION PHASE 1-14, Twin Falls, Idaho: Coverage under a general permit IDR10C0HR, held by Wooten Excavation, LLC; Construction stormwater; Effective; issued August 5, 2022, term to February 9, 2027; discharges to Cedar Draw.

Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 1,918 were issued before IDR10C0HR.

Coverages issued nearest IDR10C0HR

SUNDANCE SUBDIVISION PHASE 1-14 among its neighbors

EPA’s permit file holds 11 discharge permits in the Lower Rock Creek subwatershed (HUC 170402120607), IDR10C0HR among them. Its county holds 108, 1 of them major permits; IDR10C0HR is a minor permit.

Other permits in the Lower Rock Creek subwatershed (HUC 170402120607)

What the register holds for SUNDANCE SUBDIVISION PHASE 1-14: its NPDES ID, its permit type and status, its dates, its address in Twin Falls, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C0HR.

Identity

Facility as filedSUNDANCE SUBDIVISION PHASE 1-14
Permittee as filedWooten Excavation, LLC
NPDES IDIDR10C0HR
Permit statusEffective
Permit typeCoverage under a general permit
Discharger classMinor discharger
Facility typeNot a publicly owned treatment works
ProgramConstruction stormwater
IssuedAugust 5, 2022
Expiration dateFebruary 9, 2027
AddressTwin Falls, ID 83301
Receiving waterCedar Draw
SubwatershedLower Rock Creek (HUC 170402120607)

Effluent limits and exceedances

EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C0HR.

Inspections, violations and enforcement

EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C0HR.

Inspections

EPA’s inspection file holds no inspection for NPDES IDR10C0HR.

Formal enforcement and penalties

0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.

Informal enforcement

EPA’s informal enforcement file holds no action for NPDES IDR10C0HR.

Watch this permit

One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C0HR.

Start the watch

How often?
  • One permit holder — $99/month
  • One watershed — $2,990/year
  • One state — $4,990/year
  • The whole register — $18,000/year

How we handle your data → Privacy

Nearby on the register

Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.

What this page shows

The Sundance Subdivision Phase 1-14 permit, held by Wooten Excavation, LLC, is one of 11 NPDES permits in the Lower Rock Creek subwatershed, this one included. Among the 59 storm water construction permits in Twin Falls County, 0.0% have a violation on file, and this permit records no pollutants under a numeric limit or effluent exceedances.