Clean Water Act discharge permit · NPDES IDR10C0X4
RANCH IMPROVEMENTS (LAYTON), Banks, ID: NPDES IDR10C0X4 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
RANCH IMPROVEMENTS (LAYTON), held by Layton Construction, holds NPDES permit IDR10C0X4, which discharges to Dry Buck Creek. EPA’s file records it issued January 10, 2022 and expiring February 9, 2027.
RANCH IMPROVEMENTS (LAYTON), Banks, Idaho: Coverage under a general permit IDR10C0X4, held by Layton Construction; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Dry Buck Creek.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C0X4. Layton Construction holds 10 permits in Idaho.
Other permits held by Layton Construction
- SIMPLOT PLANT SCIENCE, Boise: IDR10C03D, issued November 10, 2021
- SL EXISTING CENTRAL UTILITY PLANT DEMOLTION, Boise: IDR10C0XI, issued January 10, 2022
- DCIP, Boise: IDR10C137, issued January 10, 2022
- ST. ALPHONSUS REHABILITATION HOSPITAL, Boise: IDR10C1CK, issued January 10, 2022
- HAWKINS AT SYRINGA CROSSING, Meridian: IDR10C1DH, issued January 10, 2022
- SUDWEST BOISE, LLC, Boise: IDR10C1EA, issued January 10, 2022
- RESIDENCES AT WILSON CREEK, Caldwell: IDR10C1HQ, issued January 10, 2022
- SWITC, Nampa: IDR10C1UL, issued January 10, 2022
- BOI MICRON HANGER, Boise: IDR10C23P, issued January 10, 2022
Coverages issued nearest IDR10C0X4
- January 10, 2022: RIVERSIDE ROAD, Bonners Ferry, IDR10C0WW, held by Federal Highway Administration-Western Federal Highway Land Division
- January 10, 2022: THE LARKSPUR, Victor, IDR10C0WY, held by Headwaters Construction Company
- January 10, 2022: KINGSTOWN SUBDIVISION - PHASE 1, Meridian, IDR10C0WZ, held by Maddyn Homes, LLC
- January 10, 2022: LEWISTON HIGH SCHOOL SPORTS FIELDS, Lewiston, IDR10C0X2, held by Kenaston Corporation
- January 10, 2022: RANCH IMPROVEMENTS, Banks, IDR10C0X3, held by Conscious LLC
- January 10, 2022: HIDDEN MILL, Middleton, IDR10C0X5, held by Michelle Ames
- January 10, 2022: US-20 EXIT 343 INTERCHANGE, Saint Anthony, IDR10C0X8, held by Idaho Transportation Department
- January 10, 2022: TM CENTER SUBDIVISION NO. 2, Meridian, IDR10C0XC, held by Brighton Development
- January 10, 2022: TM CREEK SUBDIVISION NO. 7 ROADWAY AND UTILITY PROJECT, Meridian, IDR10C0XH, held by Smith Brighton, Inc.
- January 10, 2022: SL EXISTING CENTRAL UTILITY PLANT DEMOLTION, Boise, IDR10C0XI, held by Layton Construction
RANCH IMPROVEMENTS (LAYTON) among its neighbors
EPA’s permit file holds 4 discharge permits in the Fleming Creek-Payette River subwatershed (HUC 170501220104), IDR10C0X4 among them. Its county holds 50, 0 of them major permits; IDR10C0X4 is a minor permit.
Other permits in the Fleming Creek-Payette River subwatershed (HUC 170501220104)
- 20384 SH 55 FLEMING CR BR, BOISE CO, Banks: IDR10C1BG, minor permit, discharging to Fleming Creek, permit term to February 9, 2027
- BEEHIVE BEND TAKEOUT AND WALKWAY, Horseshoe Bend: IDR10L0FS, not classed
- SH-55, FLEMING CR. BR., Banks: IDR10C1B9, minor permit, discharging to Fleming Creek, permit term to February 9, 2027
What the register holds for RANCH IMPROVEMENTS (LAYTON): its NPDES ID, its permit type and status, its dates, its address in Banks, Idaho, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES IDR10C0X4.
Identity
| Facility as filed | RANCH IMPROVEMENTS (LAYTON) |
|---|---|
| Permittee as filed | Layton Construction |
| NPDES ID | IDR10C0X4 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expiration date | February 9, 2027 |
| Address | Banks, ID 83602 |
| Receiving water | Dry Buck Creek |
| Subwatershed | Fleming Creek-Payette River (HUC 170501220104) |
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES IDR10C0X4.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES IDR10C0X4.
Inspections
EPA’s inspection file holds no inspection for NPDES IDR10C0X4.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES IDR10C0X4.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, IDR10C0X4.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
Nearby on the register
- Discharge permits in Banks
- Every permit record in Banks, A to Z
- Discharge permits in Idaho
- Every permit record in Idaho, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.