NPDES IDR10C1V0 · Clean Water Act
IGC WAPELLO COMPRESSOR BUILDING, Firth, ID: NPDES IDR10C1V0 discharge permit, effluent exceedances, inspections, penalties
IGC WAPELLO COMPRESSOR BUILDING, Firth, Idaho: General permit coverage IDR10C1V0, held by Engineered Structures Inc; Construction stormwater; Effective; issued January 10, 2022, term to February 9, 2027; discharges to Blackfoot River-Blackfoot Reservoir Dam to Fort.
Idaho holds 3,630 Construction stormwater coverages of this permit type in EPA’s file; 576 were issued before IDR10C1V0. Engineered Structures Inc holds 23 permits in Idaho.
Other permits held by Engineered Structures Inc
- MICRON B42, Boise: IDR10C0KA, issued 2022-09-29
- SOUTH GARAGE, Boise: IDR10C16O, issued 2022-01-10
- OPAL, Boise: IDR10C16Z, issued 2022-01-10
- SOUTH LAYDOWN AREA, Boise: IDR10C17M, issued 2022-01-10
- NORTH LAYDOWN YARD, Boise: IDR10C1AB, issued 2022-01-10
- MICRON ID1 ADMINISTRATIVE BUILDING, Boise: IDR10C1AC, issued 2022-01-10
- NORTH GARAGE, Boise: IDR10C1EF, issued 2022-01-10
- CWI RIVER DISTRICT, Boise: IDR10C1P1, issued 2022-01-10
- HOME2SUITES, Twin Falls: IDR10C1QP, issued 2022-01-10
- FRED MEYER STORE 702 & FRED MEYER FUEL KIOSK AND CANOPY, Caldwell: IDR10C1XU, issued 2022-01-10
Coverages issued nearest IDR10C1V0
- 2022-01-10: THE STADIUM SUBDIVISION NO. 2 - PHASE 2, Caldwell: IDR10C1UU, held by Tradition Capital Partners
- 2022-01-10: MERLIN COTTAGES AND SEWER EXTENSION (HATHAWAY), Kuna: IDR10C1UV, held by Hathaway Homes, Inc.
- 2022-01-10: 2025 ARTERIAL & COLLECTOR CAPITAL MAINTENANCE, Kuna: IDR10C1UW, held by Knife River Corporation - Mountain West
- 2022-01-10: HORSE MEADOWS SUBDIVISION NO 3, Meridian: IDR10C1UX, held by KB Home
- 2022-01-10: SUMMERFIELD STAKE CENTER, Rexburg: IDR10C1UY, held by Headwaters Construction
- 2022-01-10: BARATZA SUBDIVISION PHASE 2 & MASS GRADING, Meridian: IDR10C1V1, held by Lennar Homes of Idaho, LLC
- 2022-01-10: WASTEWATER REUSE - IRRIGATION - PHASE I, Cottonwood: IDR10C1V2, held by Knife River
- 2022-01-10: INSPIRADO PHASE 3, Meridian: IDR10C1V3, held by Antonov Star Development
- 2022-01-10: INSPIRADO PHASE 4, Meridian: IDR10C1V4, held by Antonov Star Development
- 2022-01-10: GROVELAND SUBDIVISION NO 1, Emmett: IDR10C1V5, held by Hubble Homes LLC
IGC WAPELLO COMPRESSOR BUILDING among its neighbors
4 discharge permits are in the Town of Basalt-Snake River subwatershed (HUC 170402060304); IDR10C1V0 is one. Its county: 22, 2 major; IDR10C1V0 is minor permit.
Other permits in the Town of Basalt-Snake River subwatershed (HUC 170402060304)
- FIRTH WASTE WATER TREATMENT PLANT UPGRADES, Firth: IDR1002KJ
- FIRTH, CITY OF - FIRTH WWTP, Firth: ID0024988, minor, term to 2009-07-31
- IGC WAPELLO COMPRESSOR BUILDING, Shelley: IDR10L0HW
Identity
| Facility | IGC WAPELLO COMPRESSOR BUILDING |
|---|---|
| Permittee | Engineered Structures Inc |
| NPDES ID | IDR10C1V0 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 10, 2022 |
| Expires | February 9, 2027 |
| Address | Firth, ID 83236 |
| Receiving water | Blackfoot River-Blackfoot Reservoir Dam to Fort |
| Subwatershed | Town of Basalt-Snake River (HUC 170402060304) |
NPDES IDR10C1V0: effluent limits and exceedances
IGC WAPELLO COMPRESSOR BUILDING (NPDES IDR10C1V0): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES IDR10C1V0: no pollutant row on file.
NPDES IDR10C1V0: inspections, violations and enforcement
NPDES IDR10C1V0 (IGC WAPELLO COMPRESSOR BUILDING): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES IDR10C1V0
NPDES IDR10C1V0: one email when its EPA record changes — $99/month.
Permits near NPDES IDR10C1V0
NPDES IDR10C1V0: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.